Information
-
Conducted on
-
Location Gordonvale To Edmonton
-
Contractor HSA
-
Project Name E2G
-
Prepared by Steve Clark
Weather
- Overnight / previous period rainfall
-
Did it rain the previous night (or preceding period)?
-
Has this rain prevented work occurring for this work shift?
-
What work activity has been impacted?
Weather - first work period (eg morning)
-
Weather (first period of work ie morning)
- Rain
- Sun
- Windy
- Cloudy / overcast
- Drizzle
- Cold
- Hot
- Warm
- Cool
-
Has rain prevented work occurring this period?
-
What work activity has been impacted?
Weather - second work period (eg afternoon)
-
Weather (second period of work ie afternoon)
- Rain
- Sun
- Windy
- Cloudy / overcast
- Drizzle
- Cold
- Hot
- Warm
- Cool
-
Has rain prevented work occurring this period?
-
What work activity has been impacted?
General
Activity Checklists Completed and QAS Completed
Hold Points, Witness Points and Non Conformance Observations
-
undefined
-
Photo/s
-
Add media
Meetings Attended
-
undefined
Visitors to Site
-
undefined
General Site Observations and Comments
-
undefined
-
Photo/s
-
Add media
Materials delivered or Removed from site
-
undefined
-
Photo/s
-
Add media
Plant Mobilised or Demobilised or Out of Service
-
undefined
-
Photos
Complaints from Public
-
undefined
-
Photos
Delays
-
Caused by
- Principal
- Contractor
- Sub Contractor
- Utility Provider
- Weather
- Other
-
Details
-
Photo
WHS, Traffic Management and Environmental Controls
WHS
-
Safety controls been implemented for activity?
-
Provide details of controls implemented ie SWMS number, included as part of Toolbox/startup briefing, or other controls put in place, etc
-
Safety controls correctly implemented
-
Provide details of comments made to supervisor
-
Add photo of safety controls
Safety photo
-
Safety control photo
Traffic Management
-
Traffic control been implemented for activity
-
Access and entry points in accordance with access approvals
-
Controls correctly implemented
-
Provide details of comments provided to supervisor
-
Add photo of traffic controls
Traffic control photo
Environmental Controls
-
Enviromental controls been implemented for activity?
-
Provide details of controls implemented ie ESCP, or other controls put in place, etc
-
Environmental controls correctly implemented
-
Provide details of comments made to supervisor
-
Add photo of environmental control
enviro photo
-
Enviro control photo
Work Activity Record
-
Add work activity diary entry
Work Activity Entry
Activity summary
-
Location /zone within site that activity is occurring
- Bruce Highway Area 1 - 63000 to 65300 - Mulgrave River to Draper South
- Intersection Bruce Highway - Riverstone Road
- Intersection Bruce Highway - Gillies Range Road
- Leonis Access
- Intersection Bruce Highway - Draper Road
- Bruce Highway Area 2 - 65300 to 67400 - Draper South to Mackey Creek
- Maher Road
- Pedestrian Overpass
- Bruce Highway Area 3 - 67400 to 70300 - Mackey Creek to North of Warner
- Castlereagh On Ramp
- Intersection Bruce Highway Maitland Road
- Maitland Road - Bruce Highway Overpass
- Maitland Road - Bruce Highway Overpass Entry Ramp
- Maitland Road - Bruce Highway Overpass Exit Ramp
- Local Roads East - Pine Creek Yarrabah Road
- Local Roads East - Littles Road
- Local Roads East - Warner Road
- Local Roads West - Stanley Street
- Local Roads West - Loftus Street
- Local Roads West - Castlereagh Street
- Local Roads West - Jones Road
- Local Roads West - Maitland Overpass Connector Road
- QR - South
- Other
- Cairns Road
-
Work activity description
- EW- Earthworks
- ITS- ITS
- IW- Inclement Weather
- LS- Landscaping
- OT- Other
- PA- Pavements
- SA- Safety
- SF- Surfacing
- RF- Road Furniture
- Environmental
- Drainage (subsoil)
- Drainage (kerbs)
- Road Furniture (Concrete Barrier)
- Road Furniture (Guardrail)
-
Time of activity commencement
-
Time of activity completion
-
Comments on work activity / Directions provider to contractor
Personnel resources
-
Supervisor on site
-
Supervisors Name
- Nathan McGowan
- Ben Waller
- David Ballingall
- Other
- Gary Eketone
-
Leading Hand onsite
-
Leading Hand Name
- Turbo
- Dan Line-Eyre
- Mort
- Tim Killalea (ITS)
- Hayden Maddigan
- Other
- Gavin Findlay
-
Add personnel resource
Personnel
-
Personnel description
Plant Resources including operators
-
Dogs included?
-
Size of excavators?
-
Add other plant and equipment (eg tools)
Plant / equipment
-
Description of plant or equipment
- Bobcat
- Bitumen Spray Truck
- Compactor
- Combo (Bobcat & Excavator)
- Tractor and Disc Plough
- Directional drill
- Dozer
- Front-end loader
- Grader
- Dump truck
- Asphalt Paver
- Profiler
- Positrack
- Roller (Smooth drum)
- Roller (Multi tyred)
- Roller (Padfoot)
- Scraper
- Semi float
- Semi Side Tipper
- Truck (Body)
- Truck (VAC)
- Truck (Water)
- Semi Water tanker
- Other
Photos of work activity
-
Add Photos of work activity
photo
-
Add media
-
Photo description
-
Sign once competed. Roadworks Inspector