Audit Title
-
Equipment ID
-
Work Order
-
Conducted on
-
Prepared by
-
Location
-
Personnel
OVERVIEW
-
Style of Traffic Housing
-
Picture of Traffic Housing
-
Doors Accessible
-
Security
- Padlock & Hasp
- Controller Key
- Cyberlock & Hasp
- S100
- Cyberlock 3 way swing door
- Other (make note)
-
Consumer mains type and condition
-
Point of Supply
-
Point of Supply
-
Site ID stickers affixed
-
Doors operating as per design
-
Generator on site
INTERNAL AUDIT
-
Photo of internal
-
Air-conditioning Installed
-
Fans Installed
-
Adequate Lighting
-
UPS on site
HARDWARE AUDIT
-
Equipment installed
- ASR
- ME3600
- ORING
- DSLAM
- IE2000
- UPS
- FOBOT
- MOXA
- MuLogic
-
Photo of hardware
-
Power Supply
- DC
- AC
- 240V
- 24V
- 48V
- 5V
-
Connection Type
- Fibre
- Copper
- RF
FOLLOW UP WORKS & SIGN OFF
-
Works Performed
-
Follow up works
-
Add media
-
Add signature