Information

  • PROJECT REFERENCE:

  • SURVEYOR:

  • DATE OF SURVEY:

  • CUSTOMER NAME:

  • CUSTOMER ADDRESS:
  • SITE ADDRESS(if different from above):
  • CUSTOMER TELEPHONE NUMBER:

  • CUSTOMER MOBILE NUMBER:

  • CUSTOMER EMAIL

PLANNING

  • IS THE PROPERTY LISTED OR IN A CONSERVATION AREA?

  • WILL THE INSTALLATION COME UNDER"PERMITTED DEVELOPMENT"

  • ARE THERE ANY OTHER PLANNING ISSUES TO BE CONSIDERED?

  • IS THE CURRENT ROOF LINING UNDER AN ACTIVE WARRANTY? IF SO, THE WARRANTY PROVIDER SHOULD BE CONSULTED AS TO WHETHER THE INSTALLATION OF THE SYSTEM WILL VOID OR IN ANY WAY AFFECT THE WARRANTY.

SYSTEM DESIGN

  • WHERE IS THE SURVEY BEING CARRIED OUT

  • BUILDING USE

  • BUILD TYPE

  • SIZE OF SYSTEM DESIRED/PROPOSED(in KW)

  • PROPOSED MOUNTING SYSTEM

  • TYPE OF TILE IF APPLICABLE

  • GRID STATUS

  • WILL THE PROPOSED ORIENTATION AND TILT ANGLE OF THE ARRAY ACHIEVE OPTIMUM COLLECTION CAPACITY FOR THE LOCATION AND BUILDING DESIGN?

  • PV ARRAY / DESIGN

  • PROPOSED MAKE AND MODEL OF MODULES

  • PANEL TYPE

  • HOW MANY STRINGS WILL THE PROPOSED SYSTEM HAVE?

  • COPY OF THE CLIENTS ELECTRICITY BILL

  • PRESENT ELECTRICITY COST PER KW?

  • SCAFFOLDING REQUIRED

  • AREA TO BE SCAFFOLDED

  • PHOTOS OF PROPOSED SCAFFOLDED AREA

ROOF ASSESSMENT

  • GENERAL ROOF CONDITION

  • PHOTOS OF THE ROOF

  • GENERAL LOFT CONDITION

  • PHOTOS OF THE LOFT

  • ACCESS TO THE LOFT

  • IS THE PROPERTY IN AN EXPOSED LOCATION?

  • INCLINATION OF ROOF FROM HORIZONTAL IN DEGRESS

  • ROOF SLOPE LENGTH, RIDGE TO EVES (m)

  • LOWER WIDTH-GABLE TO GABLE (m)

  • UPPER WIDTH - IF DIFFERENT(m)

  • GUTTER HEIGHT ABOVE GROUND(m)

  • IS THE INSTALLATION LIKELY TO RESULT IN THE LOADING ON THE ROOF STRUCTURE INCREASING BY 15% OR MORE? ANY PRIOR INCREASE IN THE LOADING OF THE STRUCTURE MUST BE TAKEN INTO ACCOUNT.

  • IS THE PROPOSED PV ARRAY MOUNTING SURFACE OF SUFFICIENT AREA, INCLUDING ANY REQUIRED CLEARANCES?

  • IS THE CONDITION OF THE PROPOSED PV ARRAY MOUNTING STRUCTURE AND MOUNTING SURFACE SATISFACTORY?

  • ARE THERE ANY OBSTACLES THAT MAY CAUSE SHADING ISSUES? (CHIMNEYS, WINDOWS ETC)

  • IS THERE A LIKELIHOOD THAT SIGNIFICANT OVERSHADOWING ISSUES COULD OCCUR IN THE FUTURE e.g. TREE GROWTH

  • ARE THERE ANY ACCESS ISSUES

  • STRING
  • SYSTEM DATE:-SUNPATH AND SHADING ASSESSMENT IS REQUIRED FROM THE BASE OF EACH ARRAY FACING SOUTH

  • LOCATION OF STRING

  • PHOTOS OF PROPOSED LOCATION

  • PROPOSED NUMBER OF MODULES

  • PROPOSED INSTALLED TOTAL CAPACITY IN kw

  • ORIENTATION(VARIATION FROM SOUTH)

  • INCLINATION(VARIATION FROM HORIZONTAL)

  • IS ANY SHADING PRESENT WITHIN 10M OF THE PROPOSED ARRAY?

ELECTRICITY CONSUMPTION

  • ASSUMED OCCUPANCY ARCHETYPE

  • DOES THE PROPERTY HAVE ELECTRIC SPACE HEATING, ELECTRIC HOT WATER OR ELECTRIC VEHICLE CHARGING LOADS?

  • IS THE PROPERTY ON A SPLIT LOAD TARIFF(e.g. ECONOMY 7)? IF YES ANSWER THE BELOW TWO QUESTIONS

  • LAST 12 MONTHS READINGS FOR DAY/ON PEAK TARIFF(KWH)

  • LAST 12 MONTHS READINGS FOR NIGHT/OFF PEAK TARIFF(KWH)

  • IS MICROGENERATION ALREADY INSTALLED

  • ARE 12 MONTHS ELECTRICITY READING (KWH) PRIOR TO THE INSTALLATION OF THESE LOADS AVAILABLE FROM BILLS?

BATTERY STORAGE

  • BATTERY STOREAGE(EESS) INCLUDED?

  • NOMINAL CAPACITY OF BATTERY STORAGE(EESS)

  • WHICH SERVICES ARE TO BE PROVIDED BY THE BATTERY

ELECTRICAL ASSESSMENT

  • DISTRIBUTION NETWORK OPERATOR (DNO) FOR THIS REGION

  • WHICH ENGINEERING RECOMMENDATION WILL APPLY TO THIS INSTALLATION (e.g. G98)

  • WILL PERMISSION FROM THE DNO BE REQUIRED PRIOR TO INSTALLATION?

  • CUSTOMER'S ELECTRICITY SUPPLIER?

  • PROPOSED METHOD OF CONNECTION TO THE CONSUMER UNIT

  • IS THE EXISTING ELECTRICAL INSTALLATION IN GOOD CONDITION

  • WHAT IS THE DISTANCE FROM THE CONSUMER UNIT TO THE PROPOSED LOCATION OF THE INVERTER (m)

  • WHAT IS THE ESTIMATE VOLTAGE DROP

  • HAVE REGULAR PERIODIC INSPECTION AND TESTING REQUIREMENTS BEEN MET?

  • IS MAIN EARTHING AND BONDING IN PLACE

PROPOSED LOCATION OF KEY COMPONENTS

  • PROPOSED LOCATION OF INVERTER

  • PROPOSED LOCATION OF GENERATION METER

  • PROPOSED LOCATION OF THE DC ISOLATOR

  • PROPOSED LOCATION OF THE AC ISOLATOR

  • DO THE PROPOSED LOCATIONS OF THE ABOVE MEET WITH BOTH THE REGULATORY REQUIREMENTS AND THE CUSTOMERS EXPECTATIONS?

GENERAL

  • WILL THE INSTALLATION WORK RESULT IN NON-COMPLIANCE WITH THE BUILDING REGULATIONS IN RELATION TO WORKMANSHIP; MATERIAL;STRUCTURAL STABILITY;FIRE SAFETY;RESISTANCE TO MOISTURE;CONSERVATION OF FUEL AND POWER AND ELECRICAL SAFETY?

  • WILL THE PROPOSED INSTALLATION RESULT IN NON-COMPLIANCE WITH THE IET WIRING REGULATIONS?

  • WILL THE PROPOSED INSTALLATION BE COMPLIANT WITH ANY REQUIREMENTS STATED BY THE SOLAR PV SYSTEM COMPONENT PRODUCTS MANUFACTURES?

  • WILL ANY FORM OF PROTECTED SPECIES BE DISTURBED DURING THE INSTALLATION PROCESS?

MATERIALS

ROOFER

  • ReneSola Saturn 410w Mono Facial Module

  • ReneSola Saturn 400w Mono Facial Module

  • 49/Concrete Brackets and fixings

  • Plain/Rose Brackets and fixings

  • Slate Brackets and fixings

  • Weathering Arrangement

  • Rails 3.3 meters

  • Rail Splices

  • End Clamp

  • Mid Clamp

  • FLAT ROOF BUCKETS

  • CONCRETE BLOCKS FOR BUCKETS

  • BIRD MESH REQUIRED

Electrical

  • Hi-brid Inverter(white)

  • Standard Inverter(red)

  • 10 Kw Battery Module

  • 15 Kw Battery Module

  • 40 Amp AC Isolator

  • 32 Amp AC Isolator

  • DC Isolator

  • Generation Meter

  • Sub board inc Earth Bar, Tail set and Henley Block.

  • CONTAINMENT
  • Type of containment

  • Containment Size

  • Lengths/Meterage

  • Accessories and amounts

  • 4mm x 16mm brass pan head screws

  • Submain Type

  • Submain Length

  • Distribution Board Breaker(Make and Model)

  • Data Cable Length

  • 4mm PV Cable

  • 6mm PV Cable

  • PV Sticker Set

  • Battery Sticker Set

  • ANY OTHER MATERIAL

  • NOTES

Please note: layout or number of panels may vary when the installation takes place, due to the limitations of surveying the roof from the ground(if a roof survey was done in this matter). Therefore the estimates generated for the system may also vary.

Sign Off

  • Customer Signature

  • Surveyor Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.