Title Page
-
Job Number
-
Job Name
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Confirm all areas cleared of debris and tripping hazards
-
Notes
-
Add media
-
Confirm surrounding finishes are protected
-
Notes
-
Add media
-
Confirm fire taping is complete and safing inspection has been done
-
Notes
-
Add media
-
Confirm wet material is inspected to 1/8" thickness
-
Notes
-
Add media
-
Confirm proper substrate overlap
-
Notes
-
Add media
-
Confirm no pin holes are visible in the spray
-
Notes
-
Add media
-
Confirm top of wall spray signed off by inspector
-
Notes
-
Add media
-
Confirm exposed ceiling areas have acceptable finish
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sign Off
-
Comments