Title Page
-
Client
-
Topan Job Number
-
Site Address
-
Safety Inspection Conducted by
-
Onsite Topan Representative (Supervisor)
-
Date of Inspection
1. GENERAL DOCUMENTATION COMPLETE
-
Hard copy of RAMS for the works available to the Onsite Team?
-
Are the RAMS in digital Format and available to the Onsite Team?
-
Why is Onsite Team working without a copy of the RAMS?
-
Installation paperwork correct to requirements and site specific ?
-
Why is the paperwork not correct ?
-
Has the Topan Daily Briefing Record been completed by the team onsite and signed for ?
-
Why is it not signed?
-
Has the Topan Daily Vehicle & Trailer Pre-start Checklist been completed for today ?
-
Why has it not been completed?
-
If the site is a highways project do work vehicles have Chapter 8 markings?
-
Why is the vehicle working on this site without Chapter 8 markings?
2. SITE SAFETY
-
Site Supervisor holds SSSTS
-
Reason for no SSSTS ?
-
Topan installation team all hold CSCS cards ?
-
Who doesn't hold a CSCS card and why are they working on this site?
-
Installation team wearing mandatory PPE ?
- Hard hat
- Correct hi vis workwear for site
- Safety boots (not rigger type)
-
Is the PPE being worn correctly ?
-
Explain what is being worn incorrectly ?
-
Installation team has access to general PPE ?
- Gloves
- Eye protection
- Waterproof jacket & trousers
-
Is there a valid reason ?
-
Is the correct type of PPE being worn for each work task at present (as according to relevant Risk Assessment)?
-
What PPE is not been used?
-
Installation team has access to specialised PPE for work (with chainsaws, chippers, brushcutters, etc) ?
-
What specialised PPE kit is not available and why ?
-
Site Supervisor's mobile phone in working order ?
-
If not, how are emergency communications to be made?
-
Plant/Equipment in working order ?
-
What is the fault?
-
Has the fault been logged?
-
Why has it not been logged?
-
Plant Operator(s) hold relevant certificates (verbal answer, can be checked if required and certificates supplied to site)
-
Is the operator undergoing supervised training?
-
Why is the plant being operated by an uncertified operator?
-
Fuel in the correct cans and marked ?
-
What is the issue?
-
Spill kit available ?
-
Why not ?
-
Materials stored safely ?
-
What is the issue?
-
Are Noise and Dust emissions being controlled?
-
What are the issues?
-
HAVS control in place?
-
What are the issues?
-
Are HAVS exposures being recorded?
-
Why not?
-
Is fencing made secure at end of each shift ?
-
Why not?
-
Are open excavations covered/protected ?
-
Why not?
3. GENERAL SITE WELFARE
-
Are adequate Welfare Facilities available ?
-
What is Onsite Team doing to overcome this?
-
Are Emergency Arrangements in place ? eg: muster points, identity of First Aider, location of first aid, nearest A&E hospital, etc
-
What arrangements are not in place?
-
Fire precautions in place ? eg: fire extinguishers, etc
-
What is missing?
-
General onsite housekeeping - are the work areas tidy ?
-
Why is the area untidy?
-
Lighting levels adequate ?
-
Why are you working with inadequate lighting ?
-
Do the installation team have safe access/egress to and from site ?
-
Why is the access/egress route being used?
-
Is First Aid kit available (in date, fully stocked) in vehicles or by Client's First Aid provisions ?
-
What is the issue?
5. ROAD & PUBLIC SAFETY/SEGREGATION
-
Is adequate Road Traffic Management in place to provide safe working area for Onsite Team?
-
What is the issue?
-
Is adequate segregation in place to keep public/third parties out of working area?
-
What is the issue?
6. SAFE SYSTEM OF WORK EMPLOYED (RAIL)
-
Is this a Rail Site?
-
Which Safe System of Work is in place?
- Safeguarded Site of Work
- Fenced Site of Work
- Separated Site of Work (Site Warden)
- Warning Systems - Permanent
- Warning Systems - Train Operated (TOWS)
- Warning Systems - Human Activated (LOWS)
- Warning System - Portable (SATWAS)
- Lookout Warning
- NO Safe System is in Place
-
How is the site being made safe to work on?
7. SAFE SYSTEMS OF WORK (STATUTORY)
-
Are any Statutory Safe Systems of Work required?
- N/A
- Permit to Dig
- Hot Works Permit
- Confined Space Permit
- Work at Height Permit
- Work On or Over Water Permit
- Ladder Permit
-
Is Permit complete and signed by all relevant parties?
-
Why is permit not signed?
8. LIFT PLAN
-
Is a Lift Plan required?
-
What is the Lift Plan reference number?
-
Is the equipment on the lift plan correct to what is being used onsite ?
-
Is the Lift Plan signed by all Relevant Parties?
-
Why is it not signed?
9. ENVIROMENT
-
Environmental Assessments included?
- Waste management (Covered in RAMS)
- Noise/Vibration (HAVS paperwork with RAMS)
- Air pollution ( within RAMS ERA)
- water/Ground pollution (within RAMS ERA)
- Spillage/Use of spill kits etc (Spill kits within vehicles)
- Protected species (within RAMS ERA)
- Tree preservation order (TPO within RAMS ERA)
- Heritage/Archaeology (within RAMS ERA)
- N/A
-
Are all controls in place?
-
Why are controls not in place?
10. WORK QUALITY CONTROL
-
Does the fencing meet relevant standards?
-
What element does not comply?
11. GENERAL COMMENTS
-
General Comments by Topan Site Supervisor
-
General Comments by Topan Safety Inspector