Site Detail
-
Site ID
-
Site Address
-
Date
-
Surveyor
-
Location
-
System Type
- SCS
- IRS 5 Wire
- IRS 9 Wire
- IRS 13 Wire
- V4
- V5
- V9
-
Client Details
Site and System Information
Building Information
-
Blocks Or Cores?
-
No. Of Blocks/Cores (FOR MULTIPLES PLEASE SELECT ALL RELEVANT TO NUMBER ON SITE. I.E. IF THERE ARE 6 BLOCKS, SELECT 1,2,3,4,5,6)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Block/Core 1
-
How Many Units?
-
Number Of Floors?
-
Block/Core 2
-
How Many Units?
-
Number Of Floors?
-
Block/Core 3
-
How Many Units?
-
Number Of Floors?
-
Block/Core 4
-
How Many Units?
-
Number Of Floors?
-
Block/Core 5
-
How Many Units?
-
Number Of Floors?
-
Block/Core 6
-
How Many Units?
-
Number Of Floors?
-
Block/Core 7
-
How Many Units?
-
Number Of Floors?
-
Block/Core 8
-
How Many Units?
-
Number Of Floors?
-
Block/Core 9
-
How Many Units?
-
Number Of Floors?
-
Block/Core 10
-
How Many Units?
-
Number Of Floors?
-
Total Units Overall
-
Parking
-
Take a picture of the building overall and parking
Dish Location
-
Where Is a The Dish Located?
- Gable End Wall
- Chimney
- Front Facing Wall
- Rear Facing Wall
- Lift Motor Room Wall
- NPGM
- Thru The Roof
- Other
-
Description
-
Take A Picture
-
Sky Dishes Present
-
How Many?
-
Other Dishes Present
-
How Many?
Main Head End Location
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
Approx Distance From Rig/Dish to HeadEnd?
-
Are There Any Modulators?
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
Data Log
-
Data Log Available?
-
Please Take A Screenshot Of The Data Log From Your iPad And Add Here
-
Free Ports On Switches For Data Logs?
-
Please Take A Screenshot Of The Data Log From Your iPad And Add Here
-
Faceplates Available To Data Log?
-
Please Take A Screenshot Of The Data Log From Your iPad And Add Here
Sub Head End Location(s)
-
No. Of Subs (FOR MULTIPLES PLEASE SELECT ALL RELEVANT TO NUMBER ON SITE. I.E. IF THERE ARE 6 SUBS, SELECT 1,2,3,4,5,6)
- Sub 1
- Sub 2
- Sub 3
- Sub 4
- Sub 5
- Sub 6
- Sub 7
- Sub 8
- Sub 9
- Sub 10
-
Sub Head End 1
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 2
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 3
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 4
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 5
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 6
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 7
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 8
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 9
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
-
Sub Head End 10
-
Location
- Internal
- External
-
Externally Contained Within?
- Cabinet
- Remote Building
- Other
-
Internally Contained Within?
- Loft Space
- Riser
- Lift Motor Room
- Cabinet
- Cupboard
-
HeadEnd Type
- Launch
- Split
- Cascade
- Tap
- Switch
-
What Is The Tap Loss?
-
Description
-
Take a picture
-
240v Socket Available?
-
Earthing Point Available?
-
How Many Units Fed From Head End?
-
Flat Number of Longest Run
-
Length of Longest Run
Cable Routes
-
Description
-
Take a picture
-
Number of Pre Wires
-
Reason for Pre Wires
Additional Information
-
Additional Requirements
- 2 Man Team
- Special Heights
- Loft Work
- Ladder Size
- MEWP
- Abseilors
- Scaffold
- Traffic Management
-
Days MEWP/ Abseilors/ Scaffold/ Traffic Management Required?
-
Ladder Size Information
- 12's
- 14's
- 18's
- 22's
- CAT
-
Loft Information
- Loft Lit
- Loft Boarded
Additional Information
-
Description
Additional Items
-
What additional's are required?
- 5 Lines Amplifier 4x SAT 1x TERR
- PSU UK Version of 9933
- 5 Lines 2 Way Splitter 4x SAT 1x TERR
- 5 Lines 1 Way Tap -10dB 4x SAT 1x TERR
- Smart Splitter
- MDF Backboard
- Cabinet 460x350x120
- Cabinet 400x600x200
- Cabinet 400x600x300
- Cabinet 700x600x300
- 4 Way Switch
- 8 Way Switch
- 16 Way Switch
- 4 Way Trailing Socket
Additional Photos
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
Risk Assessment
Risk Assessment
-
This risk assessment has been carried out at survey stage.
At any point a further site specific risk assessment may be required due to building changes, change of system design or additional hazards.
Identify Hazards
-
- Fall From Height
- Access Issues
- Adverse Weather
- 3rd Parties
- Traffic
- Hazardous Existing Equipment
- Property Hazards
- Garden Hazards
- Ground Hazards
- Asbestos
- Any Other Hazards
- Slip/Trips
Who might be harmed and how?
-
- Engineer
- Customer
- Public
- 3rd Party Workers
- Pets/Wildlife
Evaluate the risk, decide on precautions, and record findings
-
Likelihood
-
Severity
-
Can the hazards be removed?
-
Please describe what has been removed and how
-
Control Measures
- P.P.E
- Full Fall Arrest
- Laddermate
- Microlite
- Cones
- Barriers
- Additional Rope
- Additional Ratchet Strap
- Signage
-
With the control measures in place please review the risk assessment
-
Likelihood
-
Severity
-
Has the risk been lessened with control measures?
-
Please escalate install
Review assessment & update
-
At any point a further site specific risk assessment may be required due to building changes, change of system design or additional hazards.
This means a copy of this form must be filled out again and emailed to update records.
Safe Systems of Work
Safe Systems of Work
-
All ladder work will be carried out as per content of H&S information folder. A copy of which is kept available and accessible on every vehicle.
As standard when working with:
Single, double or triple section ladders.
CATS
Full P.P.E
Full Fall Arrest
Laddermate
Microlite -
All planning should be made so that no deviations are required from standard working practice.
Where deviations are required, full safe systems of work are required below and this should be highlighted in the risk assessment. -
Please state deviation from standard ladder or roof working practice
-
Add media
-
Add media
-
Add media
-
Add media