Title Page
-
Conducted on
-
Prepared by
-
Available for inspection
General Condition
-
Clean inside and out
-
No Leaks or damage found
-
Tires, Rims, and Lug nuts present in good condition
-
Tires inflated to 120 PSI each
Fluids
-
Miles
-
Hours
-
Oil (15W40)
-
Transmission
-
Power steering
-
Coolant
-
Diesel Exhaust Fluid
-
Windshield washer fluid
Exterior
-
No issues found upon visual inspection
-
All doors hinged/roll ups operate correctly
-
Folding steps/grab handles
-
Wiper blades
-
Bucket and roof are clean from debris
Cab Interior
-
Gauges oil, temp, air, alt, etc
-
Warning lights and buzzers
-
Controls, steering, brakes, horn and wipers
-
Mirrors and interior lighting
-
Accountability tags in good shape
-
Radios correct channels and volume checked
-
Brockton portable charging
-
Throw stick water rescue
-
Flashlights
-
Hot stick working and in good condition
-
Submersion suits in good shape ready to deploy
Multi Gas Meter
-
Appropriate battery life
-
Calibrated
-
In good condition
Scotts
-
Bottles are full, no leaks and clean
-
Masks in good shape and connected
-
Pass devices checked
-
Heads up display working
-
Voice amplifier working
Thermal Camera
-
Good condition
-
Camera charging
-
Battery chaging
-
Spare battery
-
Camera tether is present
1 - Electric Panel
-
Mud plates
-
Tarps
2 - Pump Panel
-
Hoses are present, drained, and packed correctly
-
Nozzles are present and tight on hose
-
Nozzles in correct positions, bail, pattern
-
Water tank full
-
Ladder pipe/nozzles operate properly
-
All gauges read appropriately
-
All hose bed covers are fastened, in good shape
-
Pump primer works as it should
-
Pump engages and throttles up/dwn
-
Pump drains open/close
3 - Fittings
-
Coupling adapters and wrenches present
-
Speedy Dry
-
50ft and two 25ft of 4"
4 - Hydrant bag/Generator
-
Hydrant bag
-
Generator tested and light working
5 - Lighting
-
Circle D lights
-
Extension cords
6 - EMS
-
Rope bag
-
AED w/ pads
-
First in bag
-
O2 tank/regulator
-
O2 supplies
-
Trauma supplies/tourniquets
-
BP Cuff
-
Epi Adult/Junior
-
Narcan
-
Refusals/paperwork
7 - RIT
-
RIT pack full and ready to deploy
-
RIT rope in good shape ready to deploy
-
High rise pack
8 - Fans
-
PPV working properly
-
Smoke ejector working properly
9 - Ladders
-
All ladders checked for safety and function
-
Extension ladders
-
Roof ladders
-
Pencil ladder
-
Folding ladder
-
Pike poles present and in good shape
10 - K12
-
K12 saw present in working properly
11 - HAV/Chimney Bucket
-
Fuel can present and full
-
Tool box
-
Hydrant assist valve
-
Chimney bucket present and stocked
12 - Saws
-
Chainsaw
-
Roof saw
-
Spare saw blades and chains
-
Motomix and bar chain oil
13 - Scott Bottles
-
Hand tools are present and in good shape
-
Bottles are full, no leaks and clean
14 - Extinguishers
-
Fire extinguishers full with appropriate pressure
-
Hand tools are present and in good shape
15 - Hose
-
Two 25' and one 50' hose (4 inch)
-
Length of 1 3/4" hose
16 - Generator
-
Oil checked (15W40)
-
Pre heats
-
Starts and runs
17 - Cord reel
-
Cord reel tested and works properly
-
Circle D lights
-
Junction box
Aerial
-
Stabilizers in good working condition
-
Bucket is in good working condition
-
Safety belts are present and in good condition
-
The Aerial operates appropriately
-
Main aerial air supply is full and not leaking
Lights
-
Headlights - Hi/low beam
-
Running lights
-
Brake lights
-
Backup lights
-
Spot/Flood lights
-
Ground, step hose bed lights, etc
-
Warning lights, Sirens, Air horn
-
Tip/Bucket Lights
-
Aerial warning lights