Pre-operation

Crane is registered and permitted to be used in operations

Take a photo of work permit

Operator is in good condition and is competent to perform the work

Operating and emergency controls are in place

Wire ropes are free from damages

REFERENCE: Wire Rope in good condition
[This is an example of how you can use iAuditor to include reference images in your templates to assist with inspections]

cranewirerope.JPG

Brakes are in a good condition

Safety switches and interlocks, including limiting and indicating devices were properly installed

Structure has undergone visual inspection

Loading capacity is suitable for materials to be lifted

Workplace condition is free from hazards

Lifting components have all required markings

Away from overhead electrical lines

Activities are supervised by a competent person

Components are assembled in the correct sequence

Edge protection systems are in place

Travel restraint systems are in place

Fall-arrest harness systems are in place

Proper PPE is worn by workers

Job In-Progress

Radio communication, including dedicated radio frequency, equipment checks, clear and constant-talk communication and procedures for loss of signal were implemented

Proper hand signalling are used

Crane has load indicating device for overloading

Crane has motion indicator to avoid moving outside radius

Lifting gear is of adequate capacity, in good condition and marked with relevant information

Access to the crane cabin is safe

Post job

Crane is secured to prevent unauthorized use before leaving

Load were removed from the hook

Hook was raised to a safe position

Powered motions are all disabled

Keys are removed from crane

Crane boom is left to weathervane where there is no risk of the boom contacting other structures

Operator cabin is locked

Machine desk access is restricted

Recommendations

Enter recommendations here

Completion
Full Name and Signature of Inspector

Tower Crane Daily Operator Checklist

Created by: SafetyCulture Staff | Industry: Construction | Downloads: 258

Use this template to inspect a tower crane before, during and after work shifts. Begin by conducting pre-operation checks by recording work permits issued, evaluate operator’s competency and check emergency controls. Next, inspect the components of the crane by capturing photo defects and observe if safety measures were applied. Lastly, assess the post job operation to ensure that the crane is safely unattended. Provide final recommendations during end of shift to improve crane safety.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Audit

Pre-operation

Crane is registered and permitted to be used in operations

Take a photo of work permit

Operator is in good condition and is competent to perform the work

Operating and emergency controls are in place

Wire ropes are free from damages

REFERENCE: Wire Rope in good condition
[This is an example of how you can use iAuditor to include reference images in your templates to assist with inspections]

cranewirerope.JPG

Brakes are in a good condition

Safety switches and interlocks, including limiting and indicating devices were properly installed

Structure has undergone visual inspection

Loading capacity is suitable for materials to be lifted

Workplace condition is free from hazards

Lifting components have all required markings

Away from overhead electrical lines

Activities are supervised by a competent person

Components are assembled in the correct sequence

Edge protection systems are in place

Travel restraint systems are in place

Fall-arrest harness systems are in place

Proper PPE is worn by workers

Job In-Progress

Radio communication, including dedicated radio frequency, equipment checks, clear and constant-talk communication and procedures for loss of signal were implemented

Proper hand signalling are used

Crane has load indicating device for overloading

Crane has motion indicator to avoid moving outside radius

Lifting gear is of adequate capacity, in good condition and marked with relevant information

Access to the crane cabin is safe

Post job

Crane is secured to prevent unauthorized use before leaving

Load were removed from the hook

Hook was raised to a safe position

Powered motions are all disabled

Keys are removed from crane

Crane boom is left to weathervane where there is no risk of the boom contacting other structures

Operator cabin is locked

Machine desk access is restricted

Recommendations

Enter recommendations here

Completion
Full Name and Signature of Inspector