Title Page

  • Site conducted

  • Location
  • Conducted on

  • Prepared by

As Found

  • To be completed before asset preservation works

External Work Platform

  • As Found Photos:

  • Comments

External Bolting Tight Platform

  • As Found Photos:

  • Comments

Internal Bolting Tight Platform

  • As Found Photos:

  • Comments

Switch Gear Platform

  • As Found Photos:

  • Comments

Air Tight Platform

  • As Found Photos:

  • Comments

Preservation Works

TP External

Granada Davit Crane

  • Visual Inspection of Davit, Cabinet & Seal

  • Has a storage service been carried out on this davit?

Navigational Aid

  • External navigation aid free from defects following visual inspection?

Wave Radar

  • Wave radar system free from defects following visual inspection

Diesel Generator Junction Box (External)

  • Visual inspection carried out?

  • Seals intact and working?

  • Junction box internals free from moisture / water ingress?

  • Has the box been dried out and desiccant bags replaced?

Gates (External)

  • Visual inspection carried out?

  • Function check carried out, and all in working order?

Lights (External)

  • Visual inspection carried out?

  • Lights free of condensation and seals intact?

  • Has light fixture been dried out and desiccant bags replaced?

TP Covers

  • Visual inspection carried out?

  • Defects Identified?

  • Have defects been patch repaired?

  • TP zips repaired and patched (excluding entrance hatch)?

TP Internal

TP Cabinets

FO Patch Panel

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Marking Lights Controller System

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

OVP Box for NAI Equipment

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

OVP Box for 230v AC external lightning

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Davit Crane OVP Box

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Davit Crane Control Panel

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Davit Crane Resistor Panel

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Low Voltage Distribution Board

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Customer Network Panel

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Internal Diesel Generator Junction Box

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Wave Radar OVP

  • Cabinet visual inspection carried out?

  • Any visual defects identified?

  • Desiccant bags replaced?

  • Cabinet closed and wrapped in VCI film?

Switchgear

  • Visual Inspection of cover

  • Any defects identified?

  • Visual Inspection of switchgear

  • Check gas pressure gauge

  • Replace desiccant bags hanging inside.

Lights (Internal)

  • Visual inspection carried out?

  • Lights free of condensation and seals intact?

  • Has light fixture been dried out and desiccant bags replaced?

ATP Soft Seal

  • Visual inspection carried out?

  • Any defects identified in the soft seal?

  • Additional slack pulled through?

  • Old clamps removed and replaced with new clamps?

  • Gratings stacked in the middle of ATP deck?

MP/TP Bolts

  • Visual inspection carried out?

  • Denso tape applied to upper bolts stud and nut?

9. Summary

  • Comments

  • Sign-Off

As Left

  • To be completed during and after asset preservation works

External Work Platform

  • As left Photos:

  • Comments

External Bolting Tight Platform

  • As Left Photos:

  • Comments

Internal Bolting Tight Platform

  • As Left Photos:

  • Comments

Switch Gear Platform

  • As Left Photos:

  • Comments

Air Tight Platform

  • As Left Photos:

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.