Title Page
-
Site conducted
Location
-
Conducted on
-
Prepared by
As Found
-
To be completed before asset preservation works
External Work Platform
-
As Found Photos:
-
Comments
External Bolting Tight Platform
-
As Found Photos:
-
Comments
Internal Bolting Tight Platform
-
As Found Photos:
-
Comments
Switch Gear Platform
-
As Found Photos:
-
Comments
Air Tight Platform
-
As Found Photos:
-
Comments
Preservation Works
TP External
Granada Davit Crane
-
Visual Inspection of Davit, Cabinet & Seal
-
Has a storage service been carried out on this davit?
Navigational Aid
-
External navigation aid free from defects following visual inspection?
Wave Radar
-
Wave radar system free from defects following visual inspection
Diesel Generator Junction Box (External)
-
Visual inspection carried out?
-
Seals intact and working?
-
Junction box internals free from moisture / water ingress?
-
Has the box been dried out and desiccant bags replaced?
Gates (External)
-
Visual inspection carried out?
-
Function check carried out, and all in working order?
Lights (External)
-
Visual inspection carried out?
-
Lights free of condensation and seals intact?
-
Has light fixture been dried out and desiccant bags replaced?
TP Covers
-
Visual inspection carried out?
-
Defects Identified?
-
Have defects been patch repaired?
-
TP zips repaired and patched (excluding entrance hatch)?
TP Internal
TP Cabinets
FO Patch Panel
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Marking Lights Controller System
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
OVP Box for NAI Equipment
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
OVP Box for 230v AC external lightning
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Davit Crane OVP Box
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Davit Crane Control Panel
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Davit Crane Resistor Panel
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Low Voltage Distribution Board
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Customer Network Panel
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Internal Diesel Generator Junction Box
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Wave Radar OVP
-
Cabinet visual inspection carried out?
-
Any visual defects identified?
-
Desiccant bags replaced?
-
Cabinet closed and wrapped in VCI film?
Switchgear
-
Visual Inspection of cover
-
Any defects identified?
-
Visual Inspection of switchgear
-
Check gas pressure gauge
-
Replace desiccant bags hanging inside.
Lights (Internal)
-
Visual inspection carried out?
-
Lights free of condensation and seals intact?
-
Has light fixture been dried out and desiccant bags replaced?
ATP Soft Seal
-
Visual inspection carried out?
-
Any defects identified in the soft seal?
-
Additional slack pulled through?
-
Old clamps removed and replaced with new clamps?
-
Gratings stacked in the middle of ATP deck?
MP/TP Bolts
-
Visual inspection carried out?
-
Denso tape applied to upper bolts stud and nut?
9. Summary
-
Comments
-
Sign-Off
As Left
-
To be completed during and after asset preservation works
External Work Platform
-
As left Photos:
-
Comments
External Bolting Tight Platform
-
As Left Photos:
-
Comments
Internal Bolting Tight Platform
-
As Left Photos:
-
Comments
Switch Gear Platform
-
As Left Photos:
-
Comments
Air Tight Platform
-
As Left Photos:
-
Comments