Title Page

  • Conducted on

  • Prepared by

  • Location

Autonomous Maintenance (AM)

  • Has a cross-functional team been established and resourced appropriately from management?

  • Do the team members have defined roles?

  • Are team/individual PMO’s established and aligned, with meeting frequency identified?

  • Has a pre-flight checklist been developed for equipment operators?

  • Has the pre-flight inspection been performed consistently on all appropriate shifts for a period of one (1) month?

  • Please list down technician responsibilities if applicable.

  • Has a daily walk-around checklist been developed?

  • Has the walk-around inspection been performed consistently for a period of one (1) month?

  • Is a visual management system in place to capture issues identified during pre-flight and daily walk-around inspections?

  • Is there an accountability process in place to address identified issues in a timely manner?

Education and Training

  • Have all employees associated with the focus equipment value stream received TPM awareness training?

  • Are the training and ISO training modules documented and updated?

  • Have all training and operating materials associated with equipment operation been obtained, including operating and training manuals, job instruction breakdowns (JIB’s), and standard work procedures?

Safety and Environmental Management

  • Has the 6S prerequisite or higher been achieved for the area in which equipment operates?

  • Has there been a review and update of the EHS risk assessment associated with the equipment?

  • Have all operators, mechanics, technicians, and other appropriate personnel been informed of all specific EHS hazards and associated control measures that must be maintained?

  • Has there been a review and update of the LOTO procedure associated with the equipment?

  • Has LOTO training been completed for all appropriate personnel?

  • Are the training and ISO training modules documented and updated?

  • Have safety checks been incorporated into the daily walk-around inspections?

Equipment and Process Improvement (OEE)

  • Is there a process established and agreed upon by the team regarding the collection of OEE data for equipment?

  • Does the process have data sources, timing, and responsible parties identified?

  • Has OEE data been collected and baseline established?

  • A minimum of one month’s complete data is required to establish the baseline.

Planned Maintenance

  • Has the following documentation/information related to the equipment been obtained (if available)?

  • Is there an established method to track spare parts usage?

  • Have preventative maintenance requirements been established for the equipment at a defined frequency?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.