Autonomous Maintenance (AM)
-
Has a cross-functional team been established and resourced appropriately from management?
-
Do the team members have defined roles?
-
Are team/individual PMO’s established and aligned, with meeting frequency identified?
-
Has a pre-flight checklist been developed for equipment operators?
-
Has the pre-flight inspection been performed consistently on all appropriate shifts for a period of one (1) month?
-
Please list down technician responsibilities if applicable.
-
Has a daily walk-around checklist been developed?
-
Has the walk-around inspection been performed consistently for a period of one (1) month?
-
Is a visual management system in place to capture issues identified during pre-flight and daily walk-around inspections?
-
Is there an accountability process in place to address identified issues in a timely manner?
Education and Training
-
Have all employees associated with the focus equipment value stream received TPM awareness training?
-
Are the training and ISO training modules documented and updated?
-
Have all training and operating materials associated with equipment operation been obtained, including operating and training manuals, job instruction breakdowns (JIB’s), and standard work procedures?
Safety and Environmental Management
-
Has the 6S prerequisite or higher been achieved for the area in which equipment operates?
-
Has there been a review and update of the EHS risk assessment associated with the equipment?
-
Have all operators, mechanics, technicians, and other appropriate personnel been informed of all specific EHS hazards and associated control measures that must be maintained?
-
Has there been a review and update of the LOTO procedure associated with the equipment?
-
Has LOTO training been completed for all appropriate personnel?
-
Are the training and ISO training modules documented and updated?
-
Have safety checks been incorporated into the daily walk-around inspections?
Equipment and Process Improvement (OEE)
-
Is there a process established and agreed upon by the team regarding the collection of OEE data for equipment?
-
Does the process have data sources, timing, and responsible parties identified?
-
Has OEE data been collected and baseline established?
-
A minimum of one month’s complete data is required to establish the baseline.
Planned Maintenance
-
Has the following documentation/information related to the equipment been obtained (if available)?
- Equipment manual
- Spare parts list
- Spare parts usage history
- Preventative maintenance requirements
- Maintenance history
-
Is there an established method to track spare parts usage?
- Equipment manual
- Spare parts list
- Spare parts usage history
- Preventative maintenance requirements
- Maintenance history
-
Have preventative maintenance requirements been established for the equipment at a defined frequency?
- Equipment manual
- Spare parts list
- Spare parts usage history
- Preventative maintenance requirements
- Maintenance history