Information
-
TPM Large Pearson guillotine
-
Conducted on
-
By
-
Photo required.
Safety devices.
-
Check condition of other guards.
-
Check operation of stop buttons.
Mechanical.
-
Check machine anchor bolts.
-
Check for oil leaks / repair as required.
-
Check for oil levels, top up as required.
-
Check for damage to beam and tooling clamps.
-
Check shadow line.
-
Check couplings for wear / Damage.
-
Check condition of tooling.
-
Lubricate all points.
Control panel and electrics.
-
Check control panel for damage.
-
Check for excess arcing of contractors during operation.
-
Isolate machine.
-
Check cleanliness of panel, clean as required.
-
Check tightness of connections 30%?connections.
-
Check panel wiring for sins of heat or damage.
-
Check condition of cables to all drive motors.
-
Check condition of limit switches
Final operation check.
-
Check all operations.<br><br><br>