Title Page
-
Project Name
-
Survey Date
-
Surveyor Name
-
Location
-
Additional Notes
Equipment
- Equipment
-
What type of equipment?
- Telephone
- Cabinet (BOP/Loc)
- REB
- FTN/FTNx
- Signal Box
- Other
-
What type of Telephone?
-
Signal ID
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
Is the SPT lockable
- Yes
- No
-
What key is required?
-
What condition is the SPT?
- Good
- Fair
- Poor
- N/A
-
Is there a walkway?
- Yes
- No
-
Height of bottom of SPT from ground (mm)?
-
Tail termination point?
-
Additional Notes
-
Phone ID/Number
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
Is the Phone lockable
- Yes
- No
-
What key is required?
-
What condition is the Phone?
- Good
- Fair
- Poor
- N/A
-
Height of bottom of SPT from ground (mm)?
-
Tail termination point?
-
Additional Notes
-
Points Reference
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
Is the Phone lockable
-
What key is required?
-
What condition is the Phone?
-
Height of bottom of SPT from ground (mm)?
-
Tail termination point?
-
Additional Notes
-
Cabinet ID
-
What Type of Cabinet?
-
What key is required to open?
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
What cables are terminated?
-
Additional Notes
-
REB ID
-
Type of REB
-
How is the location accessed?
-
What key/s is/are required to access?
-
REB Size (mm), Length x Width
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
What cables are terminated?
-
Additional Notes
-
FTN ID
-
Type of REB
-
How is the location accessed? (Include Mileage & What3Words)
-
What key/s is/are required to access?
-
REB Size (mm), Length x Width
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
Is the FTN Node within 3m of the track (i.e. Lineside)
-
What cables are terminated?
-
Additional Notes (E.g. Route to site)
-
What is the asset?
-
Asset Identification
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
Notes
-
Signal Box Name/ID
-
Address
-
How is the location accessed?
-
What key/s is/are required to access?
-
Engineers Line Reference
-
Mileage/Meterage
-
OS Grid Reference
-
What3Words Location
-
Side of Line
- Up
- Down
-
Additional Notes