General Procedure
-
Is the Southpointe Daily JHA complete?
-
Has the Southpointe JHA been signed/reviewed by all Southpointe personnel?
-
Has the Southpointe JHA been signed/reviewed by all InfraSource personnel?
-
Is the NiSource Work Zone Planning Form accurately completed?
-
Is the NiSource Work Zone Inspection Form accurately completed up to the point of audit?
-
Do all Southpointe personnel have a valid flagger certification?
-
Is the flagger certification visible on all Southpointe personnel?
-
Do all Southpointe personnel have on a hardhat?
-
Do all Southpointe personnel have on safety glasses?
-
Do all Southpointe personnel have on a safety whistle?
-
Do all Southpointe personnel have on a Class III Vest?
-
Do all Southpointe personnel have on Class E pants?
-
Do all Southpointe personnel have on Steel Toed Boots?
-
Do all Southpointe personnel have functioning 2-Way Radios?
-
Is the Southpointe work vehicle parked in a safe position?
-
Does the Southpointe work vehicle have cones at the front and rear bumpers?
Work Zone
-
What type of work zone is present during audit?
-
Is the audit taking place during site setup?
-
Did one of the flaggers act as a spotter while setting signs?
-
Did the flaggers unload equipment from the side of the vehicle?
-
Were the strobe lights utilized on the traffic control vehicle?
-
Does this setup consider both worker safety and best possible flow of traffic?
-
Are the appropriate mainline lead-in signs present?
-
Are the signs placed in the shoulder of the roadway?
-
Is the speed limit greater than 35 mph?
-
Are the mainline lead-in signs spaced at a 350' minimum?
-
Are the mainline lead-in signs spaced at 100' minimum?
-
How many side road approaches require signage?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
-
Are all signs clearly visible without any obstructions?
-
Is signage condition acceptable?
-
Is there adequate site distance the flagger stations?
-
Is an upstream taper present?
-
Does the upstream taper have a minimum of 6 cones?
-
Is the upstream taper a minimum of 50' long?
-
Is a downstream taper present?
-
Does the downstream taper have a minimum of 6 cones?
-
Is the downstream taper a minimum of 50' long?
-
Does the zone have an adequate buffer space?
-
Are the tangent cones present?
-
Are the tangent cones spaced correctly?
-
Are the sidewalks closed where work or equipment is present?
-
Are there "Sidewalk Closed" signs at the area of work?
-
Are there cone bars at the sidewalk closure preventing pedestrian access?
-
Are there "Sidewalk Closed Ahead, Cross Here" signs at each end of the sidewalk?
-
Are there cones around all InfraSource equipment that is present?
-
Are all open trenches/holes coned off?
-
Are there cone bars at all open trenches/holes?
-
Are steel plates readily available to allow access for emergency vehicles/school buses?
-
Are there enough flaggers present?
-
Are flaggers properly positioned?
-
Do flaggers have a means of escape?
-
Are flaggers utilizing a "Stop-Slow Paddle?"
-
Are flaggers using proper hand gestures for a "Stop-Slow Paddle?"
-
Are there any flaggers stationed in an intersection?
-
Are the flaggers in intersections using red flags?
-
Are flaggers using proper hand gestures to direct traffic?
-
Are flaggers communicating clearly with one another?
-
Are flaggers attentive and aware of their surroundings?
-
Is the audit taking place during site tear down?
-
Was all equipment loaded from the side of the vehicle?
-
Did one of the flaggers act as a spotter while taking signs down?
-
Did the the traffic control vehicle use its strobe lights during tear down?
-
Are there any steel plates present in the roadway?
-
Are there "Steel Plate Ahead" signs present?
-
Did the InfraSource foreman and flaggers have a post job briefing?
-
Did the flaggers ask for information about the work being performed the following day?
-
Is the audit taking place during site setup?
-
Did one of the flaggers act as a spotter while setting signs?
-
Did the flaggers unload equipment from the side of the traffic control vehicle?
-
Were the strobe lights being utilized on the traffic control vehicle?
-
Does this setup consider both worker safety and best possible flow of traffic?
-
Are the appropriate mainline lead-in signs present?
-
Are the mainline lead-in signs placed on the shoulder of the road?
-
Is the speed limit greater than 35 mph?
-
Are the mainline lead-in signs spaced at a 100' minimum?
-
Are the mainline lead-in signs spaced at a 350' minimum?
-
How many side road approaches require signage?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
-
Are all signs clearly visible without any obstructions?
-
Is signage condition acceptable?
-
Is there adequate sight distance to the closure?
-
Are there cones present on each side of the "Road Closed" sign?
-
Are there cone bars present at the point of closure to help prevent access?
-
Are the sidewalks closed where work or equipment is present?
-
Are there "Sidewalk Closed" signs at the point of closure?
-
Are there cone bars at the sidewalk closure preventing access?
-
Are there "Sidewalk Closed Ahead, Cross Here" signs at each end of the sidewalk?
-
Are there cones around all InfraSource Equipment that is present?
-
Are all open trenches/holes coned off?
-
Are there cone bars present around all open trenches/holes?
-
Are steel plates readily available to allow access for emergency vehicles/school buses?
-
Are flaggers properly positioned at the closure?
-
Do flaggers have a means of escape?
-
Are all flaggers using their red flag?
-
Are flaggers communicating clearly with one another?
-
Are flaggers attentive and aware of their surroundings?
-
Is the audit taking place during site tear down?
-
Was all equipment loaded from the side of the vehicle?
-
Did one of the flaggers act as a spotter while taking down signs?
-
Were the strobes being utilized on the traffic control vehicle?
-
Are there any steel plates on the roadway?
-
Are there "Steel Plate Ahead" signs present?
-
Did the InfraSource foreman and flaggers have a post job briefing?
-
Did the flaggers ask for information about the next day's traffic setup?
-
Is the audit taking place during site setup?
-
Did one of the flaggers act as a spotter while setting signs?
-
Did the flaggers unload equipment from the side of the vehicle?
-
Was the Arrow Board secure during transit?
-
Were the safety chains crossed under hitch and secure?
-
Were the strobe lights utilized on the traffic control vehicle?
-
Does this setup consider both worker safety and best possible flow of traffic?
-
Are the appropriate mainline lead-in signs present?
-
Are the mainline lead-in signs placed in the shoulder of the road?
-
Is the speed limit greater than 35 mph?
-
Are the mainline lead-in signs spaced at a 100' minimum?
-
Are the mainline lead-in signs spaced at a 350' minimum?
-
How many side road approaches require signage?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
-
Are all signs clearly visible and free from any obstructions?
-
Is signage condition acceptable?
-
Is the Arrow Board placed in the correct position according to PUB 213/MUTCD standards?
-
Are all support legs on the Arrow Board secure and making contact with the roadway?
-
Is the Arrow Board flashing in the correct direction?
-
Is a Merging Taper present?
-
Does the Merging Taper have the correct number of devices for this specific roadway?
-
Is the Merging Taper the correct length per PUB 213/MUTCD standards?
-
Is a termination taper present?
-
Does the termination taper have the correct number of devices per PUB 213/MUTCD standards?
-
Does the work zone have an adequate buffer space?
-
Are the tangent cones present?
-
Are the tangent cones spaced correctly?
-
Are the sidewalks closed where work or equipment is present?
-
Are there "Sidewalk Closed" signs where the sidewalk is closed?
-
Are there cone bars at the sidewalk closure to prevent access?
-
Are there "Sidewalk Closed Ahead, Cross Here" signs at each end of the sidewalk?
-
Are there cones around all InfraSource equipment that is present?
-
Are all open trenches/holes coned off?
-
Are there cone bars present at all open trenches/ditches?
-
Are steel plates readily available to allow access to emergency vehicles/school buses?
-
Are flaggers properly positioned?
-
Do flaggers have a means of escape?
-
Are all flaggers using a red flag?
-
Are flaggers communicating clearly with one another?
-
Are flaggers attentive and aware of their surroundings?
-
Is the audit taking place during site tear down?
-
Did the flaggers demobilize the zone working from downstream to upstream?
-
Was all equipment loaded from the side of the vehicle?
-
Did one of the flaggers act as a spotter while taking signs down?
-
Were the strobe lights utilized on the traffic control vehicle?
-
Was the Arrow Board secure during transit?
-
Were the safety chains crossed under hitch and secure?
-
Are there any steel plates present in the roadway?
-
Are there "Steel Plate Ahead" signs present?
-
Did the InfraSource foreman and flaggers have a post job briefing?
-
Did the flaggers ask for information about the work being performed the following day?