Title Page
-
Site Name
-
Date and Time of Inspection
-
Project Number
-
Inspected by
-
Location
Checklist
GENERAL INFORMATION
-
Works description
-
Take a photo of the site (inc permit board)
-
Type of Roadway
-
Weather/Light Conditions
-
Traffic Conditions
TEMPORARY TRAFFIC CONTROL
ADVANCE WARNING SIGNS
-
Is there an appropriate number of signs placed?
-
Are all signs in good condition (clean, legible, and reflective)?
-
Do all sign placements (height, visibility, and spacing) conform to standard regulation?
CHANNELIZING DEVICES
-
Are all barriers in good condition?
-
Are all safety cones in good condition?
-
REFERENCE: Safety cones in good condition
[This is an example of how you can use iAuditor to include best practice reference images in your templates to assist with inspections]
INTERNAL TRAFFIC CONTROL
-
Are all site personnel trained on the street works (chapter 8)
-
Are there parking areas designated for workers and visitors?
-
Are there designated locations for storing materials and servicing equipment?
-
Is there an adequate lighting provided for night operations?
-
Are brightly coloured vests with retroreflectivity utilised to allow workers to be visible
-
Is there a designated channel of communication regarding changes to the Permit/TM arrangements
-
Is there an established communication between workers on foot and equipment operators?
COMPLETION
-
Overall recommendations
-
Overall assessment
-
Name and Signature of Inspector
-
Name and Signature of Competent Person