Site quality, WHS and environment audit

  • Inspector

  • Design & Inspect TCP'S Cert No

  • Client

  • TCP No

  • TCP Modification

  • Site / Job no

  • Type of Work

  • Duration of Work

  • Road Configuration

  • Site Supervisor

  • Traffic Controller(s) Name(s)

  • Location

  • Time / of Work

Vehicles - Identify vehicles on site:

  • Rego no:

  • Rego no:

  • Rego no:

  • Rego no:

Guidance Notes

  • 1. Detailed inspection using this checklist shall only be undertaken by personnel holding current design & inspect traffic control certificate or auditers accreditation.
    2. Report to site office or most senior person & attend site induction or be escorted..
    3. Desk-Top "Audit". Review paperwork & discuss site conditions, to complete Column 1. Check items against TCP & associated documents.
    4. Site inspection. Conduct site verification inspection, discussing issues with random site workers / operators, to complete Columns 2 - What you see on site.
    5. Complete your report on site, where possible.
    6. If you are able make a copy of the report on site, leave a copy with supervisor.
    7. For Contractor site, forward an electronic copy to Contractors Safety Manager, WH&S Branch.

Quality

  • Has the vehicle pre-start inspection been completed FORM-OP-WHSE-005 DAILY TRUCK MAINTENANCE CHECKLIST

  • Team Leader has commenced or completed FORM-QA-OP-001 QUALITY ASSURANCE SITE DOCKET

  • Has an approved Traffic Control Plan been developed for this site

  • Traffic Control Plan sighted (check date, number and Planners' name)

  • Have the approved Council Permits and Police Permits (numbers) been sighted

  • Is the Road Occupancy Licence current for the Traffic Control Plan

  • Are all flashing lights and arrow boards operational

  • Is all equipment and signage in good order (clean, working, no faults)

  • Is the Variable Message Sign being used as specified in RMS Traffic Control at Worksites

WH&S - Workers

  • Are all workers wearing appropriate PPE

  • Have all workers undergone Site and / or TMA Pre-start

  • Have all workers attended and signed today's FORM-OP-WHSE-019a-JOB HAZARD ANALYSIS CARD

  • Have all workers read and acknowledged the relevant SWEMS FORM-OP-WHSE-006 TRAFFIC CONTROL SAFE WORK ENVIRONMENT METHOD STATEMENT

  • Are all workers ticketed and competent to perform their allocated duties

  • Do all workers have their relevant tickets readily accessible for inspection

WH&S - Site specific requirements

  • Traffic Controller is properly located on the job site according to the TCP

  • Traffic controller controls traffic from a standing position

  • Does the SWEMS adequately cover operations for this site

  • Have any site specific hazards been identified and if so have they been;<br>

  • Are all workers aware of the client emergency evacuation plan / procedure

  • Are client Emergency Assembly Areas clearly sign posted

  • Are there adequate toilet facilities for both male and female workers

  • Is the FORM-WHSE-006 INCIDENTS-ACCIDENTS-INJURY REGISTER in use and up to date

  • Are first aid kits stored in each vehicle

  • Are fire extinguishers fitted to all vehicles

WH&S - Traffic Control

  • Have signs & devices been set out as per approved T.C.P for the site

  • Does the TCP appropriately and safely control traffic and does it cope adequately with the traffic volumes

  • Has pedestrian safety and access been addressed adequately

  • Has cyclist safety and access been addressed adequately

  • Has public transport access and facilities been addressed adequately

  • Are vehicles entering / leaving the site from private driveways

  • Are there any contradictory, distracting or superfluous signs, delineation or markups

  • Are all signs and devices clearly visible in all conditions such as daylight, rain, sunrise and sunset ect

  • Is a school or hospital affected by the work zones

  • Are workers onsite able to move about safely and is access clearly marked/delineated

  • Is lighting and signage appropriate appropriate and adequate for night works

  • Is the an acceptable escape route for traffic controllers using the stop/slow bat

  • Can trucks enter and exit the site safely and rejoin traffic safely

  • Are controls in place for mobile plant (physical separation from TC's, delineation or exclusion zone

Environmental Aspects

  • Are any vehicles or air conditioning idling or running unnecessarily

  • Are the vehicles supplied with sandbags (for fluid containment purposes and to secure signage in wind)

  • Does the SWEMS adequately cover Environmental Aspects for this site

  • Below relates to identifying possible water hazards, threats to environmental aspects (flora and fauna), air and noise pollution controls

  • Have any environmental issues/hazards been raised or identified and if so have they been;<br>

  • When changes in weather or environmental conditions occur, has the Team Leader conducted and documented daily drive through inspections in FORM-QA-OP-001 QUALITY ASSURANCE SITE DOCKET

  • Any waste or equipment causing possible slip, trip or fall hazards after set-up, during the shift or following pack-up

  • Are there adequate facilities for waste or rubbish disposal onsite or have workers separated waste for recycling bins back at the TMA Office

Traffic Controllers ( TCS )

  • Is the correct number of TC's being used ?

  • Is TC's high visibility clothing in good repair ?

  • Are all TC's displaying the R.M.S logo and Authorized Traffic Controller ?

  • Do they have correct communication?

Traffic Controllers Night Shift Work

  • Are they wearing approved clothing ?

  • Are they safely lit & Visible?<br>

  • Are they using night wands ?

Sign & Devices

  • Are all signs & devices in good condition ?

  • Are all signs clearly visible & not affected by other signs, plant items, vegetation, shade, light glare etc ?

  • Are sign faces in compliance with AS1742.3 and have class 1 retro reflective material ?

  • Are the correct sign sizes being used ?

  • Are signs duplicated, where required ?

  • Are signs erected at the correct height & position ?

  • Are the signs erected to give the correct sign distance ?

  • Are all cones & bollards installed at the correct spacing ?

  • Are the correct sized cones & bollards being used ?

  • Where tappers are used, have they been identified as Lateral Shift or Merge Tapers & are they the correct length ?

  • Where there are 3 lanes of traffic or more in one direction & two lanes are closed, are the separate merge tapers of the correct length ?

  • Are the two tapers separated by at least 1.5 D ?

  • Where work is beyond a crest or curve, has the taper set up before the crest or curve ?

Non-conformances; Rectification / close-out record; Comments

  • Non conformance issue

  • Rectification / comment

  • Action by

  • Observations and recommendations

  • Auditor

  • Select date

  • Manager

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.