Information

  • IAudit Type

  • Audit Title

  • Date of Report

  • Customer / Contractor

  • Project Name

  • Prepared by

Project Milestones

Date and Time of Visit

  • Select date

Equipment Status

  • Status of equipment

  • Add media

  • Date for BAS Tech to program

In Wall Rough

  • Are walls ready for rough?

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

Overhead Rough

  • Overhead Rough Required?

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

FPB and VAV Termination

  • Are FPB's and VAV's ready for termination?

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

Trim-Out of devices

  • Are walls ready for finish trim?

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

  • Additional floors

  • Floor and Area Required

  • Percent Complete

Temperature Control Panels

  • Are Temp Control Panels ready to be installed?

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Temperature Control Panel

  • Additional Panel

  • TCP Name and Location

  • Is RFI needed for approval of Temperature Control Panel

  • Has RFI been written and submitted

  • Is A Change Order Needed

  • Has Change Order been written and submitted

Start Up / Checkout

  • Equipment Start Up

  • Percent Of Equipment Started

  • List Of Equipment Started

  • Controls Start Up / Check Out

  • Percent Of Controls Started Up / Checked Out

  • List Of Controls Stared Up

Site Condition

  • Was On-Site Work Impacted

Trane Employee's or Subcontractors

  • Personnel On-Site

  • Company and number of employees on site.

Change Orders

  • Potential Change Order

  • Is An RFI Need To Be Written

  • Was RFI Written And Submitted

Request For Information Needed

  • Potential Request For Information

  • Has The RFI Been Written And Submitted?

  • Was RFI Written And Submitted

Safety Concerns

  • Site Safety Issues or Concerns?

  • Were Issues Shown And Emailed To General Contractor

Additional Information

  • Comments

  • Add media

  • iAudit Completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.