Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Location
-
Personnel
Documentation
Daily works documentation
-
Is the Transpower log book correctly filled out?
-
Is the project site login sheet current and all staff logged in?
-
Is the daily Hazard ID current and correct for work being undertaken?
-
Are all staff signed onto the Hazard ID?
-
Has a daily risk slider been completed?
-
Is the site hazard board current and all hazards listed?
-
Are the safe working method statements (SWMS) appropriate for work being undertaken?
-
Are all staff signed onto the SWMS?
-
MSDS information available?
Site Inspection
Work area
-
Are the site access ways clear and marked where required?
-
Are areas restricted and gates locked where required?
-
Is the work area will defined and labelled?
-
Photos of work areas
Personnel
-
Is correct PPE in use?
-
Are staff working in a safe manner?
-
Is staff competency correct for levels of supervision?
Environmental
-
Site specific environmental conditions addressed?
-
Noise
-
Dust
-
High Voltage
-
Working at Heights
-
Excavations
-
Chemicals/Dangerous goods
-
Smoke/VESDA fire protection isolated if required?
-
Are dangerous goods stored correctly?
Tools, equipment and plant
Tools and Equipment
-
Tools well maintained and in serviceable condition?
-
Are electrical tools tested and tagged?
-
Is calibrated equipment tested and tagged?
-
Are tools appropriate for the task being undertaken?
Plant
-
Is all plant in serviceable condition?
-
If within a switchyard, is plant correctly earthed?
-
For mobile plant, is a safety observer (WSS) present?
-
Has the plant been inspected daily before use?