Title Page
-
Contract Number
-
Job Number
-
Location
-
Date of inspection
-
Prepared by
-
Team Supervisor
-
Additional personnel on site
-
Brief description of work activity
-
Client
-
Executive Summary
SSOW - T3 Possession
-
TSC Name
-
TSC possess valid competency card
-
TSC wearing appropriate armband
-
TSC briefing book completed correctly
-
Plant Equipment Materials (PEM) form completed
-
TSC possess WON
-
Correct PPE worn
PTS
-
All staff possess valid PTS competency card or TVP?
-
PTS staff received TSC brief and it is understood
-
All staff wearing correct PPE
ES
-
ES Name
-
ES possess valid competency card
-
ES wearing appropriate armband
-
Engineering supervisors certificate completed correctly
-
All TSCs signed in with ES
-
Plant Equipment Materials (PEM) form completed
-
Authority to start work received from PICOP
-
ES possess WON
-
Worksite marker boards (if required)
-
Worksite marker boards at least 100m from possession protection
-
Worksite marker boards at least 100m between worksites
-
Is the ES aware of any RRV/Engineering train(s) affecting the worksite?
-
Has the ES checked and cleared the worksite before lifting the marker boards
-
Has the ES lifted the worksite marker boards and communicated correctly with the PICOP to hand back the worksite?
-
ES wearing correct PPE
Rail Mounted Plant Compliance
-
RRVO possess valid competency card and authority to work card
-
Pre-use inspections carried out for all RRVs by the RRVO & countersigned by RRVC?
-
RRVC possess valid competency card
-
Plant Equipment Materials (PEM) form completed
-
Dispatch and Catch form completed (if required)
-
All RRVs have a valid Certificate of Engineering Vehicle Acceptance and a copy is kept in each item of plant?
-
Thorough examination certificates available for all Rail mounted plant?
-
Thorough examination certificates available for all lifting equipment?
-
Are trailers certified?
-
Tools and Equipment have reflective tape or paint and clearly visible? Example: RRV bucket painted?
PICOP
-
PICOP Name
-
PICOP possess valid competency card
-
PICOP wearing appropriate armband
-
Possession arrangements form completed correctly
-
Plant Equipment Materials (PEM) form completed
-
ES granted authority to start work
-
Token taken or three detonators 20m apart at both ends of possession
-
Possession limit indicator board at middle detonator
-
Protection is 400m ahead and rear of protecting signal/points/crossing
-
Hand signaller in appropriate place (if required)
-
PICOP possess WON
-
PICOP wearing correct PPE
Health and Safety
-
Daily Risk Assessment (DRA) available and signed off by all relevant staff?
-
All persons signed in/out of site?
-
Site Managers briefing Instruction completed and briefed to all relevant safety critical staff in advance of works?
-
All site operatives inducted?
-
Staff appropriately trained for the works they are carrying out?
-
Method Statement & Risk Assessments (RAMS) available and signed by all relevant staff?
-
Permit to Work in place?
-
NI10 form available?
-
Correct PPE being worn? (Behaviour/Compliance)
-
Seat belts being worn when operating plant?
-
Suitable site access and egress?
-
Site security adequate? E.g. fencing, locked gates etc.
-
Housekeeping adequate? (Slips, trips, falls, adequate lighting)
-
Traffic management (signing / lighting / guarding) in place where applicable?
-
Excavations safely guarded / battered back?
-
Underground services identified? HSG47
-
Weekly inspection of excavations completed?
-
Overhead lines protected? GS6
-
Is there an appropriate lift plan in place?
-
Work at height properly planned?
-
Aluminium tower fit for purpose and appropriate inspections carried out?
-
Scaffolding fit for purpose and appropriate inspections carried out?
-
Work on or near water properly planned?
-
Measures in place to manage and control temporary works safely?
-
Asbestos Refurbishment & Demolition Survey Report / Register available?
-
Are toolbox talks being carried out weekly?
-
Are good catches being recorded?
Kit & Equipment
-
Tools and Equipment have reflective tape and clearly visible?
-
Weekly LOLER inspections completed?
-
Weekly PUWER inspections completed?
-
Thorough examination certs (TEC) available for all plant & equipment?
-
Thorough examination certs (TEC) available for all lifting equipment?
-
Daily plant inspections completed?
-
CAT & Genny available and calibrated?
-
Fire fighting equipment available?
-
First Aid Kit (FAK) & Eye Wash stations available?
-
Trained first aider on site and known to workers?
-
Welfare facilities in place and adequate?
-
Portable Appliance Testing (PAT) in place and up to date?
-
Any hazards that require immediate intervention not stated above?
-
Please state below any other observations identified on site
-
Please state below any other observations identified on site
-
Please state below any other observations identified on site
Environmental
-
All hazardous substances stored correctly? e.g. drip trays
-
All hazardous substances labelled correctly?
-
Spill kits available?
-
Waste disposed of correctly?
-
Dust and noise controls in place?
-
COSHH Assessments available?
-
Please state any other observations identified on site
Quality
-
Quality of works to an acceptable standard?
-
Company insurance policy available and in-date?
-
Company forms used in line with ISO procedures?
-
Company procedures adhered too?
-
Sub-contractors used for the works approved in line with company procedure?
-
Verification sub-contractor has implemented a modern slavery policy and were not in place has agreed to work under ACPL policy?
Signature
-
Add signature