Page 1: Initial questions

  • Site conducted

  • Area/Depot

  • Location

Page 2: Main checklist

Depot Condition

  • Is substance abuse testing conducted

  • Are employees declaring fitness for duty

  • Are all employees wearing PPE

  • Are the wagons and locos secured safely as per train rules

  • Points set correctly (According to TWR 133)

  • Movements controlled (Avoid hard coupling TWR134(1) & GA9017.8)

  • Instructions over shunt radios (Repeated and clear)

  • Vehicles left within clearance marks

  • Are the shunting movements conducted safely - (Propelling movement Employee in front of movement TWR 134 (4))

  • Is vegetation controlled

  • Is scrap removed from yard

  • Is the yard clean, free of foreign items

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.