Title Page

  • UConn Project Number

  • UConn Project Name

  • UConn Representative

  • TRC Project Number

  • Conducted on

  • Prepared by

  • Location
  • Contractors Onsite

  • Superintendent

  • Weather

Construction Safety Audit

Administrative

  • Have all contractors submitted pertinent safety submittals and reviewed applicable EHS guidelines/SOPs prior to starting work

  • Were safety requirements covered during pre-job meetings

  • Has the contractor "Receipt of Acknowledgement" form been signed by an authorized contractor representative of each subcontractor

General Requirements

  • Is emergency contact information available

  • Do contractors know to call 911 for emergencies

  • Has the proper approval been obtained for any exits that may need disabling of fire alarms

  • Have entries and exits to the work area been designated and are the contractors using them

  • Is the general public or building occupants being affected by construction activity and/or construction emissions

  • Has smoking been observed in areas other than designated areas

  • Have all utility interruptions been coordinated with UConn

  • Are traffic flaggers being utilized where appropriate

  • Has any inappropriate behavior towards students or general public been observed

Contractor Program Management

  • Does the contractor have a copy of the approved site specific health and safety plan onsite

  • Have all identified violations from previous audit been addressed

  • Are contractors performing/documenting safety inspections

  • Has a safety representative been assigned by the contractor to monitor compliance with EHS guidelines

  • Are "competent persons" onsite for situations such as crane operations, electrical safety, excavations, fall protection and scaffolding activities

  • Have workers completed 10 Hour OSHA Construction Safety Course or 10 Hour OSHA Telecommunications Safety Course for telecommunication workers, within the last 5 years

Blasting & Use of Explosives

  • Are blasting operations occurring at this site

  • Has a blasting plan been submitted and approved

  • Have all necessary permits and licenses been obtained to perform this work

  • Are explosive materials stored in a manner consistent with applicable regulations

  • Can the Is contractor account for inventory of explosives

  • Are only trained and qualified workers handling explosives

  • Are signs and barricades, other visual and audible warning devices being used

  • Has the contractor taken precautions to prevent accidental discharge of blasting caps from current induced by radio transmitters, radar, lightening, power lines, dust storms and other extraneous electricity

Chemicals, Hazardous Materials & Hazard Communication

  • Are chemicals and/or hazardous materials being used on this site

  • Is a complete inventory of all chemicals being used onsite available

  • Are all chemicals and hazardous materials accompanied by a Safety Data Sheet

  • Have all Safety Data Sheets been reviewed, prior to use, by UConn EHS or 3rd party inspector when there is potential for exposure to Uconn personnel (students, employees, residents, visitors, faculty)

  • Are proper work practices being utilized to minimize or eliminate potential for exposure (storage practices, minimum use quantities, substitution or use of green products when possible)

Combustion Engines-Indoor Use

  • Are combustion engines being used indoors

  • Is the exhaust connected to an approved venting system

  • Is refueling done with engine off

  • Is fuel stored outside, in approved and appropriately marked containers and stored in compliant storage areas

Compressed Air for Cleaning

  • Are workers using compressed air for cleaning surfaces

  • Are workers directing directing air stream away from other workers

  • Does the nozzle restrict the air pressure to a max of 30 psi

Compressed Gas Cylinders

  • Are compressed gas cylinders onsite

  • Are cylinders properly secured, standing upright and labeled

  • Are valves closed when cylinders are idle, empty or moved

  • Are protection caps in place when cylinders are stored or moved

  • Are cylinders kept a safe distance or shielded from hotwork

  • Are contractors complying with OSHA requirements and CGA standards on the separation of cylinders containing incompatible chemicals

  • Are oxygen cylinders in storage separated from fuel-gas or combustible materials (min. dist of at least 20') or by a non-combustible barrier of at least 5' high with an FR rating of one half hour

  • Are regulators, hoses, torch assemblies in working order and checked for leaks prior to use

Confined Space Entry

  • Is confined space entry occurring onsite

  • Did the contractor enter the confined space under the Permit Required Confined Space Program

  • Has the PRCS been previously identified by Uconn or has the PRCS been assessed for hazards with the contractor, UConn Rep and Uconn EHS prior to entry

  • Did the contractor notify Uconn Project Representative prior to conducting work in or around the PRCS to obtain known or anticipated hazards

  • Does the contractor have a PRCS program that meets or exceeds OSHA requirements

  • Are workers properly trained for their role (Entrant, Attendant, Rescue)

  • Is equipment available and being used to ensure safe entry (atmospheric testing, ventilation, tripod for vertical entries, respirators, FR clothing, harness, taglines etc.)

  • Has the contractor provided for proper emergency rescue services (Documentation of training/equipment onsite if not using Uconn Fire Dept)

  • Has the contractor notified the Uconn Fire Department or Public Safety prior to entry

  • If hotwork is occurring in the PRCS, has a permit been issued and being followed

Cranes & Hoists

  • Are cranes and hoists being used onsite

  • Has a Crane Pick Plan been submitted and approved for the project

  • Has an annual inspection been completed

  • Did the operator inspect the hoist system verifying and documenting that the system is working properly prior to the first pick of the day

  • Are the crane operator and rigger properly trained and competent in the use of the equipment

  • Is a competent person onsite to oversee the crane operations

  • Has the contractor established a restricted area using barricades around the entire swing radius to minimize hazards to personnel and public

  • Is pedestrian traffic being effectively controlled (Chain link fencing for heavy traffic/ stanchions, danger tape,signage, ground crew for light traffic)

  • Have as-built utility tunnel structure plans been reviewed to ensure crane support and vehicles will not adversely impact structures

Electrical Safety

  • Is energized equipment being serviced, installed or replaced on this project

  • For work on live circuits has an Energized Work Permit been obtained

  • Is proper PPE/insulation/guarding being used to protect from contact with live circuits

  • Has a Competent Person been identified and is that person onsite

  • Are Lockout/Tagout procedures required and are they being used properly to eliminate electrical hazards through shutdown and isolation (Locks, Tags, Isolation Devices, Verification of No Energy)

  • Are the workers qualified, properly trained and licensed to perform the work

  • Are there any unattended, exposed voltage concerns

  • Are all tools, cords, plugs free from damage

  • Is work being performed on the Uconn 13.8 kV equipment

  • Is the contractor using the 13.8 kV System, Accident Prevention Permit Procedure to coordinate with Facilities Operations Clearance Holder

Emergency Equipment / Eyewashes / Showers

  • Are eyewash and/or safety showers supplied to workers, operational and in compliance

  • Is necessary emergency equipment ( fire hydrants, eye wash stations, safety showers, fire extinguishers, first aid kits, emergency generators, transformers, self contained breathing apparatus etc...) unobstructed and accessible

Excavation & Trenching

  • Is excavation/trenching/penetration of ground deeper than 12" occuring onsite

  • Has CBYD been contacted and utilities marked for each contractor

  • Is proper warning signs and barricades, or fencing, on all sides being utilized to prevent pedestrians/workers from crossing the opening

  • Is there potential for a hazardous atmosphere inside the excavation/trench and if so are proper Confined Space safety measures being followed

  • Has soil been classified (Stable Rock,Type A, Type B or Type C)

  • If greater than 4' deep is proper egress (ladders, ramps, stairs) within 25' of worker in all directions of travel

  • If greater than 5' deep are proper protective systems in place (trench box, sloping, benching)

  • If sloping or benching is being used, does slope meet the maximum allowable angle based on soil classification (Stable Rock-Vertical) (Type A-3/4:1) (Type B-1:1) (Type C-1 1/2:1) Horizontal : Vertical Ratio

  • If excavation is 20' deep or greater, has the protection plan been designed and executed by a Professional Engineer

  • Is a competent person onsite to oversee related work within excavation/trench

Fall Protection / Floor Openings

  • Are there fall hazards 6' or greater from workers foot level and/or are workers working over dangerous conditions/equipment at any height<br>

  • Is proper fall protection provided (guardrails, fall restraint/arrest systems)

  • Is fall protection equipment in good condition

  • Is the area below any elevated work adequately barricaded off to protect workers below from falling objects

  • Are workers within 6' of any floor opening (skylight, hole, hatch, etc.) using appropriate fall protection

  • Are floor openings protected with secure covers of sufficient strength and marked "Danger-Hole- Do Not Remove" or guarded by a standard OSHA guardrail system

Ladders

  • Are ladders being used on-site

  • Are ladders in good condition and free of any defective parts

  • Are only non-conductive ladders being used for electrical work

  • Is work with ladders within the swing area of doors being done safely

  • Are step ladders being used correctly (opened fully, locked in place, no standing on top two rungs etc.)

  • Are extension ladders being used correctly (secured, 3:1 lean ratio, 36" above landing, 3 points of contact etc.)

Roof Work

  • Is there work being performed on a roof

  • Is appropriate fall protection being utilized (railings, personal fall protection, warning lines and monitor). If "New Construction" safety monitor system may not be used.

  • Have all necessary permits been obtained (Hot Work, Confined Space)

  • Has information been obtained for any potential hazards related to laboratory exhaust fans

  • Are people below protected from falling objects

Fire Safety

  • Are contractors familiar with the locations of fire alarms, fire extinguishers and emergency exits

  • Are contractors trained in the use of portable fire extinguishers

  • Are contractor supplied fire extinguishers clearly marked with a current inspection tag

  • Are all flammable, combustible liquids labeled, stored and used properly

  • Are fuel supplies protected from impact

  • Are oily rags being controlled properly

Hot Work

  • Is there welding, saw cutting that produces sparks, brazing, torch cutting, torch applied roofing, soldering, grinding that produces sparks or the use of high temperature heat guns occurring onsite

  • Has the Uconn Fire Department been contacted and has a Hot Work Permit been obtained

  • Are the permit requirements being followed (fire blankets, fire watch, ventilation etc.)

  • Do Oxy-Acetylene torches have flashback preventers on both gas lines and the torch handle

  • Are flame proof or non-combustible shields being used to protect nearby personnel from direct rays of welding arcs

Housekeeping & Maintenance of Site

  • Are excess and scrap materials promptly removed from site

  • Is there any equipment or materials blocking exits, aisles, stairs, electrical panels or emergency equipment

  • Are temporary cords supported at least 6' above the floor or secured to floor to protect from damage and trip hazards

  • Are nails, screws or other sharp objects protruding from floor, wall or overhead surfaces

  • Is there adequate lighting

  • Is there adequate potable water

Mobile Equipment / Mobile Work Platforms

  • Is mobile construction equipment being used onsite (excavators, manlifts, bulldozers, fork trucks etc..)

  • Are employees operating aerial lifts, scissor lifts, properly trained and authorized to do so

  • Is equipment being inspected prior to each shift and are inspections being documented

  • Are spotters being used when moving equipment from one location to another or when working near overhead power lines

  • If working closer than 50' to overhead utilities has approval been obtained from the Uconn Project Representative

  • Are aerial lifts being used onsite

  • Are operators trained, properly tied off, and working from the floor of the platform only

  • Has a restricted work area been established using barricades

  • Are all building exits into the established restricted area being monitored

Personal Protection Equipment

  • Have workplace hazard assessments been performed to identify proper PPE

  • Are all workers wearing the minimum UConn requirement of hard hats, safety glasses, and safety work boots

  • Are workers wearing hearing protection when necessary

  • Are high visibility vests or shirts being worn when traffic/construction vehicles are of concern

  • Are face shields and safety glasses being worn during cutting,hammer drilling or grinding operations

  • Are respirators being worn at this site

  • Are the workers wearing respirators part of a respirator program that complies with OSHA 29 CFR 1926.103

  • Are the correct respirators being worn the to protect the worker from the stated hazard

  • Are there any other PPE issues

Powder Actuated Tools

  • Are powder actuated tools being used onsite

  • Has authorization been obtained from the Uconn Project Representative for use of Powder Actuated Tools

  • Are personnel trained and licensed

  • Are tools being left unattended

  • Are tools being used in or near explosive or flammable atmospheres

  • Do tools meet ANSI/ASSE A10.3-2006 standard "Safety Requirements for Powder Actuated Tools"

Powered Industrial Vehicles

  • Are PIV's being used onsite- forklifts, pallet jacks, manned rail, wire guided equipment or other equipment used to move heavy loads

  • Are operators properly trained

  • Has a method of identification of trained operators being utilized (badge or vest)

  • Are daily documented pre-use inspections occurring

  • If diesel, propane or gas and used indoors is there an approved plan to control exhaust

  • Is refueling occurring while engines are still running

Radioactive Materials / X Ray Equipment

  • Are radioactive materials or equipment that uses X Rays being used onsite

  • Has the UConn Radiation Safety Officer been notified

Scaffolds

  • Is scaffolding being used onsite

  • Has scaffolding been erected and inspected by a competent person

  • If in the process of being erected is the competent person within the line of sight of the erecting activity

  • Is the scaffolding inspected daily or before each shift, and the Green Tag signed and dated by the competent person

  • Are guardrails present on all scaffolding 6' or higher or are workers 100% tied off if no guard rails are present

  • Are there any notable deficiencies in the construction of the scaffolding system (missing toeboards, anchors, mud sills, mid rails, damaged components, loose ladders, fall hazards, damaged or missing planking etc.)

  • Are workers and public protected from falling objects

Signs, Signals, Barricades

  • Is the signage "Construction Area", "Restricted Area", and "Hard Hats, Safety Glasses and Work Boots Required" posted at all entrances of the construction site

  • Is the signage "Lasers In Use" posted when lasers are being used

  • Are construction parking areas posted with signs stating "Parking for Construction Only" or "No Parking"

  • In locations within occupied buildings where construction activities are occurring , are barricades being utilized to restrict access

Specific Regulated Materials of Concern

  • Have Asbestos Containing Materials, Lead Based Paint, Polychlorinated Biphenyls been identified

  • Are the materials being handled, removed and disposed of properly by certified and licensed personnel

Vapor & Particulate/Welding Emissions

  • Are vapor and/or particulate hazards present that could negatively impact building occupants

  • Has an Air Quality Control Plan been submitted and approved

  • Is the AQC being followed and is it adequate in preventing any negative impact on building occupants

  • Are dust suppression measures adequate in keeping dust levels down

  • Are emissions from machinery being controlled from entering air intakes, AC's, entry's, windows etc..

  • Have solvents and other noxious emissions been evaluated to determine engineering controls/PPE

  • If Welding Indoors, are appropriate shields, smog hog filtering unit and AQC in place to prevent exposure to building occupants

Spill Control/Response

  • Are fuel/oil/chemical/hydraulic spills a concern on this site

  • Are spill kits present and easily located

  • If storage onsite exceeds 55 gallons has an SPCC been prepared and appropriate spill kit available

  • For hydraulic equipment, is a spill kit available to adequately accommodate the largest reservoir in the contractor's inventory

Other Environmental/Health/Safety Concerns

  • Are there any other Environmental. Health or Safety issues

Comments/ Conversations/ Reoccurring Issues to Document

  • Comments:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.