Title Page
-
Conducted on
-
Prepared by
-
Location
Project Information
-
Location/Project Name:
-
Project Number
-
Observer Name:
-
Observee Name:
-
Task Observed
-
Description of Task Observed and Background Information
-
Positive Comments
-
Conclusions / Why the Questionable Items Occurred?
-
Feedback Session Conducted By:
-
Name of Observee's Supervisor:
-
Date:
-
Time:
At-Risk Observations
Personal Factors
-
(1) Lack of skill or knowledge
-
(2) Correct way takes more time/requires more effort
-
(3) Shortcutting standard procedures is rewarded or appreciated
-
(4) In past, did not follow procedures or acceptable practices and no incident occurred
Job Factors
-
(5) Lack of or inadequate operational procedures or work standards
-
(6) Inadequate communication of expectations or work standards
-
(7) Inadequate tools or equipment
Root Cause Analysis
-
Solution(s) To Prevent Potential Incident from Occurring
-
Person Responsible
-
Agreed Due Date
-
Date Completed
-
Results of Verification (were solutions done?) and Validation (were solutions effective?)
-
Reviewed by (PM/Supervisor):
-
Date:
-
Approved by (Practice Safety Leader):
-
Date:
CP015 - TRC Safety Observation Form
PERSONAL PROTECTIVE EQUIPMENT
-
1. Hearing Protection (e.g., Ear Plugs)
-
2. Head Protection (e.g., Hard Hat)
-
3. ANSI Rated Eye Protection (e.g., Safety Glasses)
-
4. Hand Protection (e.g., Kevlar Gloves)
-
5. Foot Protection (e.g., Safety Shoes)
-
6. Respiratory Protection
-
7. Fall Protection Inspected (e.g., Harness)
-
8. ANSI Rated Reflective Vest/High Visibility Clothing
-
9. Other ( Specify)
BODY USE AND POSITIONING
-
10. Correct Body Use and Positioning When Lifting/Pushing/Pulling
-
11. Pinch Points/Moving Equipment - Hands/Body Clear
-
12. Mounts/Dismounts Using 3-Points of Contact
-
13. Other (Specify)
WORK ENVIRONMENT
-
14. Work/Walk Surface Free of Obstructions (e.g., Tripping Hazards)
-
15. Housekeeping/Storage
-
16. Defined and Secured (e.g., warning devices, barricades, cones, flags)
-
17. Suspended Load, Swing Radius & Lift Area is Barricaded
-
18. Safety Shutdown Devices
-
19. Proper Storage & Labeling/Disposal of Sample & Waste Materials
-
20. Cylinders Stored Upright, Secured, & Caps in Place
-
21. Manhole/vault Inspected for Hazards
-
22. Other (Specify)
OPERATING PROCEDURES
-
23. Job Planning (HASP reviewed, JSAs, etc)
-
24. Fire Extinguishers Accessible and Inspections Current
-
25. Work Permit/Authorization to Work (Hot, Cold, LOTO, Confined Space)
-
26. JSA Reviewed & Followed
-
27. Hazard Assessment - Hazard Hunt
-
28. Interfaces with Other Functions (awareness with other personnel on site)
-
29. Operators Looking Behind Prior to Backing Up
-
30. Operators Wearing Seat Belts While Operating Equipment
-
31. Subsurface Structures Identified
-
32. Proper Trench Protective Equipment in Place
-
33. Adequate Egress Is Available for Excavation & Trench (within 25 ft. if depth is <4 ft.)
-
34. All Materials Set Back at Least 2 ft. From Edge of Trench/Excavation
-
35. Other (Specify)
TOOLS/EQUIPMENT
-
36. Hand Tools (Proper Equipment Selection, Condition, and Use)
-
37. Power Tools (Proper Equipment Selection, Condition, and Use)
-
38. Equipment, Including Heavy (Proper Equipment Selection, Condition, and Use)
-
39. Hoses Inspected
-
40. Required Monitoring Equipment Calibrated & Used
-
41. Ladders Set up Correctly & Inspected
-
42. Right Tools for the Job are Available and in Good Condition - No Fixed Open Blade Knives (FOBKs)
-
43. Other (Specify)
Totals
-
Total # Safe
-
Total # At-Risk