Information

  • Document No.

  • Prepared by

  • Project Title

  • Client Name/ Site Name

  • Client Contact

  • Estimated Duration of Task

  • Conducted on

  • Location

Potential Hazards

  • Potential Hazards

  • List Basic Job Steps

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • Potential Hazard

  • PPE (check all that apply)

  • Hard Hat

  • Hearing Protection

  • Safety Glasses

  • Monogoggles

  • Safety Shoes or Rubber Boots

  • Gloves for Specific Hazards

  • Nomex or FRC

  • Fall Protection Equipment

  • H2S Monitor

  • Respiratory Protection

  • Chemical Suit

  • Personal Floatation Device

  • Buddy System

  • Other

  • Facility Access Requirements (check all that apply)

  • GNOIEC/GBRIA-ARSC Training

  • Site Specific Training

  • Vehicle Permit Required

  • Vehicle Magnets

  • Client Notification Required

  • Control Room Check In Required

  • Entry or Work Permit Required

  • Other

Safety Checklist

Observations/Conditions (note specifics)

  • Construction or other work in progress in the area?

  • Chemical Hazards - Dripping/splashing or puddles?

  • Tripping/Slipping Hazards?

  • Thermal Hazards? (including exposed steam lines)

  • H2S Monitor Required?

  • Wind Direction Checked?

  • Observe Signs for Special PPE Required? DO NOT WORK WITHOUT THIS PPE

  • Confined Space? NEVER ENTER A PERMIT CONFINED SPACE

  • Barricades and Barricade Tape? (observe all)

  • Elevated Work? (100% tie off and buddy system required)

  • Potential Hazards Reported to Client Supervisor?

  • Asbestos/Lead Paint?

Permits Required

  • Hot Work?

  • Confined Space Entry?

  • Safe Work Permit?

Unit Safety Devices

  • Eye Wash Located? (if required)

  • Safety Shower Located? (if required)

  • Understand Area Alarms?

Energized Equipment

  • Ground Fault Protection (GFCI) Required?

  • Lock Out/ Tag Out Required?

  • Electrical Tool/ Cords Inspected?

  • High Voltage Lines Identified?

  • Hot Pipes Need Temporary Insulation?

  • Cords/Leads/Hoses Elevated?

Work Platforms for Task

  • Scaffold Needed/Inspected?

  • JLG/Scissor Lift Required? (operator certification)

  • Ladders Required? (inspected and secured)

  • Additional Comments

  • Start Date/Time

  • End Date/Time

  • Employee Signature

Post Task Review

  • Were there any incidents at the site today?

  • Supervisor Review Comments

  • Supervisor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.