Information

  • Audit Title

  • Prepared by

  • Conducted on

  • Line Section

  • Document No.

  • Enter Hazardious Tree

  • Tree
  • Enter Tag Number

  • Last Audited

  • Photograpgh tree in respect to track

  • Identify location of tree
  • Up or Down Track

  • Kilometre Post details to the nearest 1 decimal place eg 1.4

  • The tree is in a biosite.

  • Enter DBH

  • Enter Canopy width at widest point

  • Enter canopy width at widest point 90 degrees from widest point as above

  • Estimated height of tree

  • Estimate distance from outer rail to closest edge of tree

  • Enter Tree species

  • Enter Other Tree Species

  • Enter Defect Type

  • Tree Health

  • Enter Estimated The angle of lean of the tree

  • Enter likely direction direction tree will fall

  • Works required

  • Cutting Crew Requirements

  • Estimated Cutting Crew Time (Hrs)

  • Clean Up Crew Requirements

  • Estimated Clean up time (Hrs)

  • Probabaility of tree failure next 6 months

  • Probabaility of tree failure next 2 Years

  • Probabaility of tree failure next 5 Years

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.