Title Page
-
Company Name
-
Project
-
Location
-
Foreman
-
Conducted on
-
Prepared by
Documentation
-
JHA/ Work Plan filled out
-
Weekly Safety Meeting/Toolbox talk
-
Permit required available
Personal Protective Equipment
-
Hard Hat worn
-
Eye/face protection used
-
Proper footwear worn
-
Gloves used
-
Safety Vest worn
-
Respiratory protection used
Electrical/Hand tools/Power tools/Equipment
-
Proper tool in working conditions
-
Extension cords in working condition
-
GFCI used
-
Proper safety guard in place
-
Tool handles in working conditions
Fall Protection
-
Personal Fall Arrest System being used
-
Safety Harness/Lanyard/Anchor point used properly as required
-
Body harness inspected
-
Anchor adequate for current use
-
Guardrail system set up at hoist area
-
Guardrail system set up as required
-
Warning lines set up as required
-
Safety Monitor following competent requirements
-
Safety Net set up as required
-
Floor openings covered, marked and secured
First aid, Fire and Hazcom
-
First aid kit available and fully stocked
-
Fire extinguishers available and in working conditions
-
SDS labels on containers legible
-
SDS available on site
-
Gas cylinders upright and secured
-
Fuel cans being used
Housekeeping and Sanitation
-
Drinking water and cups available
-
Restrooms clean and maintained
-
Trash and materials disposed off properly
-
Walkways/walk paths kept clear of hoses/ cords/debris
-
Housekeeping maintained
-
Work area proper access available
Ladder Safety
-
Ladder 3ft above and secured
-
Ladder condition and placement
Heavy equipment
-
Heavy equipment inspected
-
Load chart/angle indicator available
-
Power lines clearance kept
-
Back up alarm in working conditions
-
Seat belt being used
-
Swing radius barricaded
-
Operator following manufacturer's recommendations
-
Safe operations observed
Rigging procedures
-
Tag lines being used on all lift and hoisting maneuvers
-
Rigging equipment properly being stored when not in use
-
Personnel kept clear of swing radius/lifting zone/landing zone
-
Barricades being used to designate lifting area
-
Signalman/Flagger performing proper and safe operations
Excavation
-
Excavation properly protected
-
Excavation more than 5ft, protection system being used
-
Shoring, sloping, benching or trench box being used as protective system
-
Spoil bank kept at least 2ft from excavation
-
Ladder available
-
Competent person performing excavation requirements to protect employees
Scaffold
-
Competent person on site when erecting/dissembling scaffold
-
Mudsills places properly
-
Scaffold Inspection tag available
-
Base plates secured
-
Proper access and egress
-
Ladder secured and 3 feet above
-
Fully planked
-
Guardrails in place
-
Fixed to structure properly
-
Personal Fall arrest system used
-
Other
Kettle Safety
-
Fire extinguishers by kettle
-
Kettle properly set up (levels & stable)
-
Located 25 ft from combustibles
-
Kettle operator with proper PPE
-
Fire watch on site
-
Tank at least 20 ft from building
-
Fire extinguishers at tanker on roof
-
Faceshield for tanker operator at roof
-
Protection for hot asphalt falling from roof
-
Gas cylinders upright and secured
Torch operations
-
Employees trained in torch operations
-
Heat detector in place
-
Fire extinguishers in place
-
Fire watch on site
-
Gas cylinders upright and secured
Additional observations
-
Other observations
-
Other observations
-
Other observations
Pictures attached
-
Attached media
Signature
-
Author