Title Page
-
Conducted on
-
Prepared by
-
Location
Sliding Doors - record WIP levels, causes for abnormal conditions, and follow up actions
-
GL Name
-
Date
-
On-coming Shift
Sliding Doors
Pre-Assembly
-
Why are there less than two sliding doors in-process?
- Manpower
- Parts
- Equipment
- Product Mix
-
Why are there less than three completed sliding doors?
- Manpower
- Parts
- Equipment
- Product Mix
In-transit / Point of Install
-
Why is there less than one sliding doors in-transit and at point of installation?
- Manpower
- Parts
- Equipment
- Product Mix
Cockpit - record WIP levels, causes for abnormal conditions, and follow up actions
Cockpits
Cockpit Cross Members
-
Why is there less than two cross members on trolleys at trim 2 and in-transit?
- Manpower
- Parts
- Equipment
- Product Mix
Cockpit Pre-Assembly
-
Why is there less than three cockpit pre-assemblies in process? (removed from transit trolley, before station 3)
- Manpower
- Parts
- Equipment
- Product Mix
-
Why is there less than three cockpit pre-assemblies in process (removed from transit trolley, before station 3)?
- Manpower
- Parts
- Equipment
- Product Mix
-
Why is there less than two cockpit pre-assemblies in-process (from station 3 to end of pre-assembly conveyor)?
- Manpower
- Parts
- Equipment
- Product Mix
-
Why is there less than one completed cockpit pre-assemblies including on the manipulator?
- Manpower
- Parts
- Equipment
- Product Mix
Follow Up Actions
-
What problems did you find that need attention?