Information
-
ToW number
-
Conducted on
-
Prepared by (your name)
-
Company name
-
Address
-
Activation Date
-
1. LIC Data
-
Approx distance from multi port to customer premies
-
Is there a LIC present
-
If YES what is the LIC diameter
-
If YES what is the LIC material
-
Telstra LIC used?
-
Other LIC used (select from reason list)
- Unable to locate LIC
- LIC not accessible
- Jiggle test failed, ridding failed
- Unable to use HSE
- Jiggle test passed, rod ding failed
- Potential excessive property damage
- Existing network is Aerial
-
2. Pre scope PASS or FAIL details
-
Scope pass rod and roped
-
Scope pass lead in cable installed
-
Scope pass customer already connected
-
Scope pass blockage repaired
-
Add media
-
Scope fail unable to locate pit
-
Scope fail unable to locate multi port
-
Scope fail multi port full
-
Scope fail customer not at home
-
Scope fail back yard feed
-
Scope fail unable to locate lic at premies (lic enters cavity wall)
-
Scope fail asbestos pit break out required
-
Scope fail asbestos pit new pit required
-
Scope fail OH&S reasons
-
Scope fail lic blocked
-
Scope fail no existing LIC aerial
-
Scope fail NBN pole licence issue
-
Enter pole number
-
Scope fail other reason
-
3. Suggested machinery required
-
Excavator
-
Enter meters pit to property entry point
-
Enter meters property entry point to building entry point
-
Add media
-
Trencher
-
Enter meters pit to property entry point
-
Enter meters property entry point to building entry point
-
Add media
-
Hand dig (shovel and pick)
-
Enter meters pit to property entry point
-
Enter meters property entry point to building entry point
-
Add media
-
Grundomat
-
Enter meters pit to property entry point
-
Enter meters property entry point to building entry point
-
Add media
-
Concrete cut
-
Enter meters pit to property entry point
-
Enter meters property entry point to building entry point
-
Add media
-
Core bore per 100mm
-
Add media
-
Other
-
4. Scope fail supporting attachments
-
Enter brief solution details
-
Add drawing
-
Add media
-
Add media
-
Add media
-
Add media
-
5. PRD date (planned remediation date, when will the LIC be installed/repaired