Information
-
Job Number and Name
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. First Impressions
-
1.1 - Does the site look well presented on approach? (i.e. fencing secure, signage securely fixed, materials stored neatly, no litter)
-
1.2 - Is the entrance to site obvious and clear? <br>
-
1.3 - Are the gates kept closed when not in use?
-
1.4 - Is there sufficient Trojan advertising on the hoarding?
-
1.5 - Is there a designated area for parking and a clear, non PPE route to the site compound?
2. Site Office, Display of Information & Safety Records
-
2.1 - Is the HSE Health and Safety Law Poster displayed and correctly filled in
-
2.2 - Canteen Notice Board (F10, Insurance, Policies, Site Rules, Emergency Information, 1st Aid Information, Hospital Location, TM Plan, TW Register, SSIP/SMAS/CHAS/CCS)
-
2.3 - Canteen Notice Board (F10, Insurance, Policies, Site Rules, Emergency Information, 1st Aid Information, Hospital Location, TM Plan, TW Register, SSIP/SMAS/CHAS/CCS)
-
2.4 - Is there a signing in book available at all times?
-
2.5 - Is the CPP plan available and being revised as necessary
-
2.6 - Are all workers being inducted and training certifications being checked?
-
2.7 - Has the weekly site managers inspection been carried out? Date of last inspection? (Pick date below)
-
Select date
-
2.8 - Are all the Statutory Inspection completed? (Scaffold & Ladders, Excavation, Plant & Tools, Lifting Equipment, PAT) Date of last inspection? (Pick date below)
-
Select date
-
2.9 - Are permits to work being issued? (Permit to Dig, Permit to Access the Roof, Hot Works Permit)
-
2.10 - Are Regular Tool Box Talks being carried out?
-
2.11 - Is the Temporary Works Register up to date? Are the design briefs completed?
-
2.12 - Is the Fire Risk Assessment complete? Are regular checks being carried out?
-
2.13 - Are all Trojan and Sub Contractor RAMS in place for all trades and activities on site. Has a Method Statement Evaluation been completed?
-
2.3 - Are RAMS available for any trades due in the next 7 days?
3. Welfare
-
3.1 - Toilets, Are they clean and tidy.
-
3.2 - Sinks, are they clean, is running hot water, hand cleaner and paper towels available?
-
3.3 - Canteen, clean and tidy, no tools being stored or batteries charged on worktops?
-
3.4 - Drying Room - Clean and tidy and no tools or materials stored?
4. Emergency Equipment & PPE
-
4.1 - Are First Aid kits and signage adequate? # of First aid kits_______.
-
4.2 - Are Eyewash stations full and have they been dated?
-
4.3 - Has Fire extinguisher been checked within the last 30 days? # of extinguishers_______.
-
4.4 - Are workers wearing the required PPE which meet site requirements and working conditions.
-
4.5 - Are any installed smoke detectors in good working order? (Please also check any sleeping accommodation)
-
4.6 - Is there a suitable supply of spare PPE? (Hi-Vis, Head Protection, Eye Protection, Ear Protection, Respiratory Protection)
5. Site Conditions And Use of Plant and Tools
-
5.1 - General housekeeping, is the site CLEAN AND CLEAR?
-
5.2 - Are fire exits and aisles kept clear?
-
5.3 - Are all the excavations suitably fenced off.
-
5.4 - Are all hole openings covered with a minimum 3/4" plywood, marked "HOLE" and secured in place?
-
5.5 - Is all Working at Height being carried out safely?
-
5.6 - Is all Working at Height Equipment 'fit for purpose' and installed correctly
-
5.7 - Are scaffold systems erected complete and tagged accordingly? (Proper components and bracing)
Environmental
-
Is the Environmental Policy displayed
-
Environmental accreditation
-
Is the Environmental Procedure and Assements available
-
Do the Workforce have an understanding of Environmental Procedures
-
Are spillage prevention and response measures in place?
-
Are measures to reduce nuisances in place? (Dust, noise etc)
-
Has a noise survey/assessment been carried out
-
Has environmental monitoring been carried out.
Commercial and Administration
-
Site Dairy, Plant and Labour Allocation and Weather records
-
Time sheets up to date
-
Plant and Materials Returns complete
-
Subcontractor & Material Schedule available
-
Contract Programme, Target Programme and Short Term Programme available
-
Drawing register available and all drawings current and/or marked superceded
-
Progress photographs
Sign Off
Site Manager
-
Add signature
Contracts Manager/Auditor
-
Add signature