Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site approach
-
TSK signage at site entrance / at site approach indicating TSK site contact?
-
Protection installed in appropriate areas and in good condition?
-
Signing in station in good location?
-
Visitors PPE is available?
-
Site is well branded and signage is clearly visible and appropriate?
-
Safe walkway available to site office?
-
Are you offered a visitor's induction?
Emergency
-
Fire plan & assembly point details explained at induction?
-
Access and egress paths clear to allow escape in an emergency?
-
CO2 extinguishers available in case of electrical fire?
-
Fire fighting equipment checked in last 12 months?
-
Are hot works in progress? If so is the work covered by a permit and is there a fire extinguisher close by?
Site welfare facilities
-
Is the site canteen area generally in good order?
-
Is the welfare area screened off?
-
Are the site WC facilities in good order (clean & tidy, toilet roll, hand wash & hand towels present)?
Materials storage and housekeeping
-
Are materials well organised in defined areas?
-
Are housekeeping standards generally good around the site, particularly in and near main thoroughfares?
-
Are individual work areas reasonably well organised and tidy?
-
Are wheelie bins sufficient in number and well distributed around the site?
Work equipment
-
Are all stepladders industrial class 1?
-
Is portable electrical equipment PAT tested? Spot check 3 items.
-
Is woodworking equipment fitted with dust collection bags to reduce exposure to dust?
-
If mobile scaffold towers are in use, are they fitted with double handrails?
-
Have mobile scaffold towers been inspected before first use and tagged accordingly?
Working practices
-
Are all those using stepladders positioned on them with at least 3 clear rungs above their feet?
-
If stepladders are in use, are operatives facing their work?
-
If scaffold towers are in use, are brakes locked off to prevent the tower moving?
-
Where there are areas of missing floor tiles, are barriers and tape in place to demarcate the area?
Personal protective equipment (PPE)
-
Are operatives wearing TSK workwear as detailed in the site induction?
-
Are operatives wearing safety footwear?
-
If operatives are using cartridge nail guns, are they wearing eye protection and ear plugs when the gun is in use?
-
Are operatives wearing eye protection and ear protection when cutting metal or wood?
-
Are gloves being used for manual handling?
Sign Off
-
On site representative
-
Auditor's signature