Title Page
Conducted on
-
Select date from calendar
Location
-
Complete location on tracker
Contract Number
-
What contract are the team currently working on?
Prepared by
-
Name of person completing audit
Team Name
-
Please record team members on site at time of audit
Documentation
-
Has suitable Site Risk Assessment been conducted for the current operations?
-
Have all operatives signed the Risk Assessment or is there evidence of briefing?
-
Is there a Team Pack on site?
-
Does the Team Pack contain Risk Assessments, Method Statements and COSHH Assessments relevant to the works being undertaken and materials being used?
-
Are utility drawings available onsite, available, legible and in date? (ordinarily 28 days from date of issue)
-
Are HAVs Exposure Sheets being completed by all operatives?
-
Is there evidence of a daily plant check being carried out?
-
Please check what items of plant the team have on site and record the type of plant and its Plant Number.
-
Are vehicles clean / tidy with all equipment and materials stored safely and without risk to health?
-
Is there a 'NO SMOKING' sticker in the vehicle?
-
Is there any evidence of non-compliance to the 'No Smoking' rules. such as cigarette butts?
-
Is there any sign of damage or defects to the vehicle?
-
Is COSHH stored with appropriate labels and in approved containers?
-
Is there a site appropriate spill kit available for any environmental issues, fuel leaks etc
Noticing & Competence
-
Are NRSWA Noticing / TTRO's in place, displayed and valid?
-
Have Streetworks personnel and Plant Operators got the relevant NRSWA Cards and plant certificates available for inspection?
-
Is there a qualified First Aider on site?
-
What is the name of the First Aider?
-
Is First Aid Kit Stocked suitably for the work being carried out and content in date?
Fire
-
Are Fire Extinguishers available, charged, in date and in useable condition? (N/A if not required)
Welfare
-
Are washing facilities available (including warm water, sink, soap & hand towels or hygienic hand wipes) available?
-
Are toilet facilities locally available?
PPE
-
For the following PPE options, please confirm they are in good condition and readily available when needed.
-
Is all required PPE available and being worn if required? (Safety Helmets are mandatory)
-
Is PPE branded TRUST? (any non-trust branded items to be replaced)
-
Is flame retardant PPE being worn by those undertaking excavations?
-
Is dust suppression being used during cutting activities?
Barriers & Work Area
-
Are Traffic / Pedestrian Segregation Barriers fitted, supported by suitable bases, linked together and enclosing all sides of the site?
-
Is all the working equipment contained within the barriered work area (Including spoil)?
-
Is spoil stored in appropriate area(s)? (Environmental considerations ie away from water courses & drainage)
-
Is work area of a suitable size to operate safely?
-
Have all excavation works taken place as advised by the NJUG tree protection zone, as per guidance contained in the Team Pack?
Traffic Management
-
Is Traffic Management required?
-
Is Traffic Management set up in accordance with Plan and assessment?
-
Is Traffic Management suitable for location and in good working condition?
Signing Lighting & Guarding
-
Are Courtesy Boards displayed and do they contain correct information?
-
Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?
-
Is the natural light, or temporary lighting, adequate for the works being carried out?
Footways
-
Are alternative pedestrian arrangements required? (i.e. Pedestrian re-routing, narrowing of walkway, road crossing)
-
Are footway covers / boards in good condition, appropriately fitted and free of trip hazards?
-
Are pedestrian diversion routes clearly marked, visible, and correctly fitted?
-
Are footway closed signs in use and appropriately positioned (near dropped kerbs/road crossings)?
-
Is the pedestrian walkway the correct width? (At least 1.2m)
-
Are carriageway trench boards suitable and fixed where in use?
HSG47
-
Are cable avoidance tool and genny readily available?
-
Is CAT and genny equipment calibrated and in good working order?
-
Please input the calibration/service date.
-
Are operatives using CAT and genny trained and competent?
-
Are utility markings suitable and clearly visible?
-
Are insulated tools being used where required?
-
Has a CAT Data been downloaded?
Other Plant & Equipment (excluding CAT and Genny)
-
Is other Plant and Equipment required on site at time of audit?
-
Is Plant / Equipment in good operational order and being used correctly (clean, usable, beacons, safety pins etc)?
-
If Stihl Saws or Hand Held Grinders are on site, are handles and guards fitted?
House Keeping
-
Are excavated materials removed from the side of the excavation?
-
Are contaminated materials stored away from grass verge?
-
Are tools being used on site stored safely without risk of causing trips??
-
Are materials (reinstatement/excavated) stored correctly within the confines of the site/compound?
-
Are plant, fuelled tools and fuel cans being stored on drip trays/plant pads?
-
Is the site swept clean after completion?
-
Is all plant attended whilst running?
-
Are plant and vehicle keys stored outside of the vehicle when not in use?
-
Are ducts, cable, other materials stored correctly / safely?
-
Is there sufficient protection to prevent falls from height? (including on vehicles where required)
Defects
-
Are there any Streetworks Defects / Issues that could result in FPN's, that have not been rectified at the completion of Site Visit?
-
Please ensure you have informed all relevant parties of the defect(s) identified.
Good Practice
-
Are there any exceptionally good safety behaviours or standards of work being exhibited?
-
Who would you like to highlight?
-
If answer is other, please specify.
-
Please name the group / individual you would like to highlight
-
Please give a description of the practice you have observed and would like recognised.
Sign Off
All personnel conducting site audits and inspections must ensure that all findings are recognised by the lead contractor representative on site (they do not have to agree the findings but must acknowledge your audit).
-
Contractor Signature of recognition of findings
-
Auditor Signature
-
Please ensure all actions have been assigned where required.