Title Page
-
Site conducted
General
-
Prepared by
-
Conducted on
-
Report Inclusions
- P.Defect
- Meeting
- Pre-Start
- WHS Walk
- Inspection
- Audit
-
Document ID
-
Weather
Surveillance
- Inspection -
-
Attendees
-
Site Location
-
Work Location
-
Review / Audit - Type
- Hold / Witness Point
- PCA (Audit)
- WHS walk
- Routine Inspection
- Pre-Start
- Defect Walk
-
Notified Event Inspected?
-
Audit Type
-
Audit Reference (PPW)
-
Lot No.
-
ITP No.
-
HP/WP No.
-
Tunnel Drives 3B
-
Chainage From
-
Chainage To
-
Non Compliant Observation?
-
Any High-Risk Activity/Observation?
-
Comments (IC / TfNSW)
-
Observation
-
Photographs
Meeting -
-
Meeting Type
-
Comments (IC / TfNSW)
-
Observation
PTT -
-
PTT Type
-
Attendees
-
Site Location
-
Permit Number
-
Tunnel Drives
-
Geological Mapping?
-
Probe Drilling / Endoscope?
-
Rockbolt Testing Data?
-
Shotcrete/Concrete Testing Data?
-
Instrumentation Monitoring Data?
-
Tunnel Crossing / Junction?
-
Design change / RFI?
-
Apparent NCR Raised?
-
Groundwater Control System (GCD) requires?
-
Grout Action Team Require?
-
Shotcrete Cracking?
-
Comments (IC / TfNSW)
-
Observation
-
Photographs
Work Lot -
-
Work Lot No.
-
Work Lot Type
-
Site Location
-
Tunnel Drives
-
Chainage From
-
Chainage To
-
IC Reviewed the Work Lot?
-
Any High-Risk Activity/Observation?
-
Comments (IC / TfNSW)
-
Observation
Potential Defect -
-
Site Location
-
Defect Type
- Rockbolts
- Shotcrete
- Strip Drains
- Drainage
- NFC
- Asphalt
- CRCP
- Barriers
-
Tunnel Drives
-
Chainage From
-
Chainage To
-
Implication with Completion works?
-
NCR raised by contractor?
-
IC notified?
-
Comments (IC / TfNSW)
-
Observation
-
Photographs
Summary -
-
New geotechnical risk?
-
Outstanding Design change or RFI?
-
Quality/Compliance Issue?
-
New NCR Raised?
-
Noise & Vibration?
-
Environmental Issue?
-
WHS Concern?
-
Any Delay Concern
-
Potential Construction Issues - Generic
-
Overall Summary