Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Information
-
What is the purpose of the FEC
- Profit Making
- Guest Facility
-
If the amusement area is within a hotel will it be open to the public
-
What competition is in the surrounding area (FEC, Bowling, Theme Park)
-
If the FEC is part of a shopping mall, what shops and brands are on offer
-
If the FEC is part of a shopping mall what are the Anchor tennents
-
If the FEC is to form part of a shopping mall where is the nearest competing mall
-
What other attractions / facilities are in the location
-
Where is the area in relation to other facilities within the location
-
If the FEC is to form part of a shopping mall what are the visitor numbers to the mall
-
What is forecasted footfall to the FEC
-
What is the directional flow of people around the entrance to the FEC
-
What is the budget of the development
-
What is the surrounding area around the mall. (Residential/ Industrial/ Other).
-
What is the population and area for the catchment area
-
Is there a Food Court near the FEC
- Yes
- No
- n/a
-
If YES to a food court what is the size & number of covers
-
If YES to a food court what brands are on offer
-
Are guest toilets required for the FEC
-
If no toilets within the FEC, where are the closest public toilets
-
Are staff toilets required for the FEC
-
How many car park spaces are there within the complex
-
What are considered the busiest times of the YEAR at the existing mall/location
-
What are considered the busiest times of the WEEK at the existing mall/location
-
What are the school holiday periods (General dates)
-
Are there any cultural faux pas SEGA should be aware of (eg colours/themes to avoid)
-
Do/Will local schools use this FEC for educational or school outings
-
What public transport links are there to the complex (road, rail, bus etc...)
-
What is the purpose of the arcade (services, profit making, draw)
-
What demographic use the location (age/nationality/income)
-
What are the zone areas going to be (redemption/sports/kids)
-
What is the target demographic for the new area
-
What would you consider the average spend per head per guest in the shopping mall
-
What is the forecasted guest spend per head within the FEC
Access and Restrictions
-
Are there any delivery time restrictions (eg equipment should be delivered whilst the complex is closed to the public between 10pm - 9am)
-
Is there a loading bay where equipment can be delivered
-
Does the equipment need to be brought in via lift/elevator
-
If YES what are the dimensions of the lift (please detail separately the door access dimsions)
-
Are there any stairs that need to be negated
-
What are the dimensions of the stair wells
-
What are the measurements of the access door to the FEC (Please list all access points)
-
What is the maximum height of the of the amusement area
-
Please sketch a general layout of the FEC with access points. (if client can supply CAD plans this would be useful)
-
Are there any changes in the height of the amusement area
-
What access restrictions are there
Ceiling
-
What type of Heating, Ventilation, Air Con HVAC is in the location
-
Are there any air con units in ceiling
-
Is there a sprinkler system in the ceiling
-
Where are the fire exits and what routes do they take
-
What are the fire regulations for the region
-
What is the lighting Lux level of the area
Walls
-
Are there any walls that can be removed to expand the area
-
Are there any supporting walls that are structural
-
Where are the existing sockets
-
Are additional sockets required
-
Are there any legal restrictions on electrical work
-
How many circuits are required
-
What type of flooring does the location have
-
Are there any sockets in the floor
-
Is the floor false
-
Are there any weight restrictions on the flooring
Operation
-
What are the planned opening hours of the area
-
What business or sales taxes are there on income
-
What amusement engineering resources does the location have
-
Are there any local contractors used by location
-
Are there any must have zones/attractions
-
What are the future plans for the location
-
Are there any expansion plans
-
What are the profit expectations for the amusement area
-
Are there any cafe/concessions near the amusement area
-
What income do these cafe concessions make
-
What EPOS system does the location currently use
-
How will the machines be set up to accept payment (Cash, Token, Swipe Card, Other)
-
If Swipe Card is there a preferred system?
-
What import taxes are there into the region
-
What is the hourly rate for location staff
-
What is the average wage in the area (Staff/Supervisors/Duty Manager/General Manager)
-
Does the FEC require a Food & Beverage concept and if so what offering is required
-
Are Party Rooms/Educational rooms required
- Yes
- No
- n/a
-
If YES please give details of size, quantity etc....
-
Does the concept require provisions for staff rooms
- Yes
- No
- n/a
-
Does the concept require provisions for a Techancial workshop
- Yes
- No
- n/a
Customer Preference
-
Preferred lighting (Bright, Dim)
-
Preferred flooring Type (eg tile, vinyl, carpet, bare)
-
Are there any preference of floor colour
-
Are there any preferred themes for the FEC that the client would like incorportaed
-
Are there any preferred rides or attractions that the client requires
Price Comparrison
-
What training resources are required from SEGA prior to opening
Price Comparrison
-
What is the current UK Sterling exchange rate?
-
Coke or Pepsi 330ml
-
Combo meal at McDonalds or similar
-
Domestic Beer 0.5L Draft
-
Import Beer 0.33L Bottle
-
Cappuccino regular
-
Water 0.33L Bottle
Additional Information
-
Additional Information
-
Comments
-
Observations
-
Notes