Information
-
Type Of Audits
-
Customer Satisfaction Survey
-
Installers On Site Audit
-
Completed Job Audit Checklist
-
Occupational Health & Safety
-
Clients Name
-
Contact No.
-
T reference No.
-
Conducted on
-
Location
-
Prepared by
-
Document No.
CSS Form
-
Add Technicians Name or Company Name or select from list below
-
- Joel Willie
- John Austin
- Oscar - AWB
- Atkin Mehmet
- Brendan Kennedy
- Brett White
- Mike Dean
- Chris Dalman
- Daniel Bryant
- Daniel Scott
- Daniel Traverso
- Robert Wyeth
- Lewis Burchall
- Amin Sido
- Paul Murn
- Gary Schmidt
- Peter Carbone
- Clayton Watt
- Isaac Shannons
- Phil Young
- John Szeligiewics
- Angus Carstens
- Kris Puglia
- Kevin Larkin
- Ryan Woods
- Allan Stamps
- Michael Lia
- Michael Marshall
- Mathew Kelly
- Peter Moran
- Jordan Hardman
- Rob Makepeace
- Paul Wells
- Harry Ghate
- Paul Grouios
- Scott Phal
- Ross Warby
- Vaughn Bullock
- Paul Reed
- Shane Gregory
- Stephan Bhungard
- Mark Wheeler
- Andrew Belle
- Geoff Epple
- Rodney Earsman
- Stephen Senarath
- Dean Thornhill
- Todd Hedley
- Reece Kennedy
- David Wordsworth
- Lee Mancs
- James Patterson
- Daniel Grubisa
- Michael Steinlauf
- Tim McDonald
- Ben Callinan
- Jeremy McDonald
- Brendan Waldron
- Cameron Gillies
- Jake Ellen
- Jason Andrew Hope
- David Trip
- Michael McMahon
- Brendan Kelly
- Daniel Predergast
- Nathan Blundel
- Selim Seidali (slim)
- Cameron Fox
- Aaron Hunt
- Russell Van Dieman
- Jason - Avo Elec
- Simon Brice
- Nigel Chipperton
- John Chadwick
- Toby Gordon
- Dean Bradshaw
- Ryan Murphy
- Matt Wilson
- Jefferson Gardiner
- Blake Shugar
- Shep
- Rory De Laurentis
- Gawen Van Vuuren
- Daniel Nash
- Ben Violante
- Joel Pyzer
-
Was our technicians CEC ID displayed upon arrival?
-
Was our technician punctual?
-
Was the solar connection timeline explained to you?
-
Were you shown the startup procedures?
-
Were you shown the shutdown procedures?
-
Were you given our True Value Solar user manual?
-
Please rate your level of satisfaction with 5 being the highest and 1 being the lowest
-
Responsiveness
-
Professionalism
-
Workmanship
-
Cleanliness upon completion of installation
-
Overall satisfaction with True Value Solar
-
Would you recommend us?
-
How could we improve?
-
Additional Notes
Photos
INSTALLATION PHOTOS
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
Installers Checklist
Installers Details
-
Is a qualified Electrician on site
-
Electricians Name
-
Electricians License no.
-
Is an accredited solar installer on site.
-
Installers Name
-
Installers CEC No.
-
Is a Red Card / White Card or Construction Industry card required in this state? If so, please provide.
-
Are safety harness's being used?
-
Has it been inspected within the 6 month time frame?
-
Correct PPE
Vehicle Presentation
-
Acceptable Transportation for PV modules?
-
MC4 Crimpers
-
DC Clamp Meter
-
AC Meter?
-
Insulation Resistance Tester?
-
Gutter Guard?
Equipment Installation Details
-
Location Chosen
-
How many panels are installed?
-
Additional Comments:
Completed Job Checklist
-
Mounting Feet & Fixings
-
Panel Alignment
-
Roof isolator
-
Conduit and Fixings
-
Cabling inc. connections
-
Cabling support/conduit
-
Earthing
-
Roof Penetrations
-
Roof cavity wiring
-
Orientation
-
Tilt
-
Isolation switch AC
-
Isolation switch DC
-
Labeling
Contractors Documentation Checklist - Confirm customer either has or will receive the following
-
Blue TVS User manual
-
Job Pack - All relevant documents / paperwork.
-
Inverter User Manual
-
Customer Education i.e. Start up procedure/Shutdown procedure.
OH & S
-
Regulator license: All contractors have relevant licenses and are up to date
-
Process safety review: JSA/SWMS is up to date and contents understood by contractor.
-
Chemical safety: MSDS obtained and chemical register shown.
-
First Aid: contractor competent in First Aid and relevant kit present on site
-
Working at heights/electrical safety training
-
SITE INSPECTION: Slips trips<br>Ensure work area is clean and tidy<br>Ensure access path is clear of obstruction
-
ACCESS ROOF: Falls<br>Fibre glass ladder for accessing roof.<br>Check ladder for damage prior to use<br>Secure ladder
-
WORKING ON ROOF: Falls<br>Identify suitable anchor points for harness. <br>Use fall prevention equipment <br>Ensure fall prevention equipment is safe and and that all staff working on the roof are trained in fall prevention equipment usage<br>Harness inspection is up to date
-
UV RADIATION - <br>Wear protective clothing and broad brim hat. <br>Apply sunscreen to exposed skin<br>Australian standard polarized sunglasses used at all times
-
INSTALLATION -<br>Equipment Falling - Barricade area below work area (Drop Zone)<br>Manual handling - Use mechanical lifting aids or team lifts<br>Noise and eyes - Always use PPE when drilling
-
DC CABLING -<br>Falls - Check work area for potential slips, trips and hazards, always use fall protection where required
-
PANEL INSTALLATION -<br>Manual handling - Use mechanical lifts<br>Equipment Falling - Barricade area work below<br>
-
Add signature