Information
-
Service Order Number/Site Name
-
Address
-
Conducted on
-
Prepared by
-
Tech/Company
-
Please confirm which area type the FNT is identified?
-
Faulty Network Category
-
Soft surface
-
existing 50mm duct
-
Please Select what plant was damaged / Repaired
-
Re-position lateral / drop off / Install duct tee or install new lateral / Network Extension
-
UFB Network fibre - locate, repair feeder fibre issues
-
4.2.6 - UFB Splitter - replace splitter
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
4.2.7 - PON Issue - inside plant to investigate, repair, reset and correct PON connection
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Faulty Network Code
-
Please Select where Fault is located on the Network
-
Breakdown of Time 'in hours' & Materials
-
Number of Technicians on site
-
Total time for testing, locating, excavation & repair per technician in hours
-
Total time for closure of excavations, & soft / temp reinstatement per technician in hours
-
Total time for quality control, iAuditor, FPA, RONS, Asbuilts, CNA & HSE per technician in hours
-
Total time on site claimed per technician in hours
-
Total hours to be invoiced in hours
-
Breakdown of materials used, e.g. 100m ruggedize, 2x bags top soil
-
Total cost of materials used
-
Sub Contractor/Equipment Hire invoice if applicable
-
Please provide cost (mark-up incl.)
-
Please upload copy of Invoice