Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
UCG Connect - Quality Checklist Form - This is a "Mandatory Checklist Form" that must be filled out for all fibre ready and connection activities completed for an End User.
FTP Install:
-
Photo supplied with the lid off showing fibre management and wiring integration.
-
Photo of the FTP at 300mm height and another photo of trace wire / Copper ends capped
ONT/ITP - Full view showing ONT/ITP and label view (height above floor)
-
Fibre Management to standard as per NGA Task Book?
-
Wiring integration completed for all other working jack points?
-
Add media
Reinstatement
-
Have I completed all soft surface reinstatements.
-
Has a minimum of a temporary reinstatement been made for hard surface.
-
Photos of reinstatements
Techmate:
-
Techmate Test ID:
-
Does commit due date match techmate test date?
-
Contact the Dispatch Centre on 0800 824 776 to have your job rescheduled.
Customer Experiance and Documentation Completed:
-
Customer premises left clean and tidy?
-
SiteTrax notes updated with actions completed?
-
Correct Billing codes captured on docket and SiteTrax?