Information

  • Inspection Complete By

  • Sub-contractor Company Name

  • Job ID

  • Date of inspection

  • Date of construction

  • Prepared By

  • Location/s

  • Field Manager Responsible

Civils External

  • Manhole Core as per Telstra Document TM00042

  • Conduit Link P100 as per Telstra Document TM00042

  • Conduit installations as per NID-INF-STD-0003

  • Conduit depth as per NID-INF-STD-0003

  • Conduit Route as per design – excluding agreed route change

  • Trench compaction (backfilling)

  • Temp-Restoration & Compaction

  • Restoration (non council) concrete, bitumen, tiles, pavers

  • Pit installation & Compaction correct

  • Pit Labelled (contractor and Project No on white PVC biscuit tag)

  • Tdux or Jackmoon installed Telstra Document TM00042

  • Subduct installation as per Telstra Document TM00042

  • Cable loops as per plan

  • Loops vertically installed in pits and manholes TM00042

  • Cable loops in pits and manholes labelled with white PVC biscuit tag

  • Site left clean

Civils Internal

  • Building Core hole neat and sealed where required

  • Cable/conduit tied to tray and labelled with warning tape and biscuit tag

  • Conduit securely fixed to wall/tray/catenary

  • Cable installed via riser shaft as per building standard

  • Cable installed via Ceiling as per standards (ACMA)

  • Conduit installed via ceiling as per standard (ACMA)

Joint Closures

  • Cables prepared / installed/ fixed as per manufacturer standard

  • Heat shrink seal installed to manufacturer standard

  • Correct port used as per manufacturer standard

  • New tray installation as per manufacturer standards

  • Correct size transport tube installed as per manufacturer standard

  • Fibres and tubes housed to manufacturer standards

  • Cables tied in with existing cables

  • UEComm fibre warning tape placed every 2 meters on cable tail

  • Cables/Joint housed in M/H and pits in a neat condition

  • Cables Labelled before and after new Jnt / wallbox

  • Cable labelled

  • Cable loop or loops positioned vertically TM00042

  • Joint secured to bracket / bearer in M/H

  • Joint pole bracket installed to correct height

  • Pole cable loop labelled with PVC biscuit tag

  • Site left clean

Customer Premises

  • FTP installed as per manufacturer standards

  • Cable prepared and fixed in FTP as per manufacturer standard

  • Fibres spliced and housed correctly as per manufacturer Standard

  • Pigtails housed correctly as per manufacturer standard

  • Through connectors used as per design

  • UEComm NOC label stuck to equipment and FTP

  • Patch lead exit from FTP as per manufacturer standard

  • Patch lead run in neat manner

  • Patch lead to equipment correct length

  • Patch lead labelled

  • Equipment / mounting kit installed

  • Equipment labelled

  • Cable labelled

  • 2mm patch lead thickness

Building

  • Wall Box Installed as per manufacturer standard

  • Wall Box cable fixed / prepared as per manufacturer standard

  • Wall Box Labelled

  • Cables/conduits Labelled

  • UEComm fibre warning tape placed on cables and conduits

  • Cables / conduits secured to wall entering wall box

  • Fibre Tubes Housed correctly / secured / labelled

  • Fibres Housed as per manufacturer standard

POP Site

  • Mac Card labelled

  • Terminated SCA supplied as per Uecomm standard

  • Patch lead correct length

  • Patch lead run in neat manner

  • Patch lead Labelled both ends

  • Copper Patch lead installed to length

  • Copper Patch lead labelled

  • VS(UCOM)-QA-FRM-003 AB Civil & Hauling Checklist submitted and compliant

  • VS(UCOM)-QA-FRM-004 AB Splice & Test Checklist submitted and compliant

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.