Information
-
Address
-
Date
-
Prepared by:
Customer / Job Details
-
Name
-
Contact
Next Actions
-
What outside installation method is to be completed?
- 1. Aerial
- 2. Existing Duct
- 3. Surface Mount Cable
- 4. Shallow Trench
- 5. Drill or slot Trench in Concrete
- 6. Hard Surface Trenching
-
Chorus approval required
-
Other requirements? I.e TMP, Arborist
- No
- L2 TMP
- Arborist
- Obstruction plans required
- Other
-
What is required?
Health, Safety and Environmental Issues
-
Underfloor access?
-
Ceiling access?
-
Back to Back Install?
-
Location of ETP?
-
FTP location photo
-
Dogs on site?
Internal information
-
Location of ONT?
-
ONT location Photo
Additional job instructions
-
Detailed description of works- If required
-
Add labelled photos using the 'inote HD' app
Consents Required
-
Right of way?
-
Multi dwelling unit?
-
Heritage site or Building?
Additional notes
-
Notes
Outside property consent - Boundary to ETP
-
Hole excavation and trenching?
-
Removal of concrete/tiling/pavement?
-
Installation of pipe(s)?
-
Special instructions
-
Clean up: We will leave the property in a clean and tidy state on completion. This does not include reinstatement to the same condition.
Inside property consent
-
Drilling small holes and installation of hardware ?
-
Cutting holes in walls?
-
Exposed surface wiring?
-
Give Chorus consent to contact RSP?
Signed consent
-
I confirm that:
- I have seen, read and understood this information and the end user terms and accept those terms; and
- I agree to Chorus undertaking the installation works and method chosen at or on the property; and
- If I am not the owner of the property, I have obtained the consent of the owner for the installation works; and
- I understand that there may be an impact on the operation of burglar and medical alarms, particularly monitored alarms. [Note: check with your alarm provider or telecommunications service provider] -
End user signature: