Title Page
-
UFF Service Order Number (Not AWMS Number)
-
Street address of the premises to be provisioned:
-
Date of Request
-
Business or Residential
-
FDH Number
-
Purpose of Pole Usage into the premises (short description)
-
Purpose of Pole Usage into the premises (short description)
-
Pole Element
Pole
-
Street Address of the Pole. (to include city/town name and/or GPS coordinates.
Visual Inspection
-
Utility pole owner
- Powerco
- Chorus
- WEL Networks
- Waipa Networks
- Private Service Pole
- Unknown
-
Pole Asset Number
-
Pole Type
-
Pole Type if Other
-
Pole Height
-
Pole Diameter (if applicable)
-
Asset Owner Pole Tag\Colour (if applicable)
-
Visual Pole Condition
-
Ground Restraint
-
Special Purpose Pole ( Is it a stub pole, brace pole, pole with jockey arms)
-
If yes please specify
-
Take photo of the complete pole.
-
Is The Pole Located Inside The Boundary on a ROW, Shared Driveway, Long Drive or any Private Land?
-
If yes please specify
-
Take photo of the pole location if not already captured previously.
-
Is the Pole Supporting Street Lighting or Spans Longer than 100m? (Typical span length is around 60m in the urban environment)
-
If yes please specify
-
Take a photo of the entire pole if not already captured previously.
-
On the UFF aerial installation route ("towards the premises"), are there any Service Drop Leads CURRENTLY present (to include Chorus SDL and UFF SDL)
-
If yes please specify the amounts and services.
-
Take a photo of the entire pole with enough detail to show the Aerial Cable Attached.
-
Does the Pole have electrical Service Leads Attached?
-
If yes please specify.
-
Add media
-
Does any point of the cable route encroach into aerial trespass.
-
Brief Synopsis of the issue.
-
Photo of the issue if not already captured.
-
Can service separation be maintained?
-
Brief synopsis of the issue.
-
Photo of the issue if not already captured previously.
-
Can ground clearance be maintained.
-
Brief synopsis of the issue.
-
Photo of the issue if not already captured previously.
-
How many Service Drop Leads in total on the pole (all services excluding power)
-
Connection type i.e. Service Drop Lead, network distribution/ network build.
-
List UFF material attached to the pole (e.g. riser duct, aerial FAT) to include enclosure ID applicable.
-
Additional remarks and photograph of anything else relevant that has not already captured.
-
Screenshot of the lay plans if available.
-
Photograph the pole (wide view and significant features) if not already captured.
-
Overlay the fibre pathway onto a photograph showing the route.
Pole Testing
-
Is the pole red tagged?
-
Take photo of the tag number and note the pole number and address.
-
DO NOT USE THIS POLE IF RED TAGGED
-
Is the proposed installation to be installed inside the telecommunications plane .
-
If yes, does the technician have the asset owner's competencies.
-
If yes do not carry out any work unless suitably qualified and competent.
-
Is any of the work to be carried out in the power plane
-
If yes, the minimum qualification is Line Mechanic.
-
If yes do not carry out any work on this asset unless suitably qualified and network induction has taken place.
-
Has the Line Mechanic been inducted onto the network by the asset owner.
-
Hammer and probe Test completed?.
-
If no, do not carry out any work on this asset.
-
Take a photo of the pole Test at the base of the pole, 300mm of excavated soil. For poles placed in tar seal take a photo of the pole base and surrounding area.
-
Are there any, or do you suspect any safety concerns from other services (e.g.Power, Chorus) not associated with the pole structural integrity.
-
Does your concern stop any further usage of this pole. Even if clarity on the issue is sought.
-
Pole Test Pass or Fail ( taking into account the structural integrity and other H & S concerns)
UltraFast Fibre
-
UFF Contractor Signature
Asset Owner Approval
-
Asset Owner Approval Required.
-
Asset Owner Approval Signature