Title Page
-
Conducted on?
-
Location:
-
Prepared by:
-
WO#
-
Service Territories
-
Inspection company:
Contractor/Crews:
Contractor/Crew
-
Contractor
-
Crew Leader
-
Crew Member:
-
Crew Member:
-
Crew Member
-
Crew member:
-
Crew Member:
Safety:
-
Are you inspecting safety today?
-
Is there a Crew Job Plan on Site?
-
Ask the Foreman why not.
-
OQ's checked?
-
Are everyone's OQ's up to date?
-
Tell us who is not up to date.
-
How was this issue resolved?
-
Proper span of control?
-
Traffic pattern set up properly?
-
What is missing?
- Road Signs
- Road cones
- Flaggers
-
Wheel chocks being used?
-
Is the job site set up properly?
-
Is PPE being worn?
-
What is missing?
- Hard Hat
- Safety Glasses
- FR Clothing
- Hearing Protection
- Steel Toe Shoes
- Safety Vest
-
Was crew excavating properly?
-
Please explain.
-
Is a spotter being used while excavating?
-
Please explain what the crew was doing that a spotter could not be used.
-
Are all bell holes / trench, coned off or being monitored for the safety of the public?
-
Fire extinguisher present when needed?
-
FR clothing worn when needed?
-
Is a CGI being used when needed ?
-
CGI Calibrated?
-
O2 Monitor being used?
-
O2 Monitor Calibrated?
-
Other Equipment Calibrated?
Excavation
-
Was excavation inspected today?
-
Competent Person Onsite?
-
Excavation Check List Completed?
-
Tabulated Data?
-
Was Shoring required?
-
Was shoring used?
Paperwork:
-
Work order packet onsite?
-
Did you ask the foreman why no packet is onsite.
-
What was the answer?
-
Were all forms completed correctly?
-
Were current gas construction standards available for viewing?
-
Where is the Gas Construction Standards book?
-
Did the crew get a standards book?
-
If no, then ask and write down why the foreman did not have one.
-
Work packet available to inspector within 24 hours?
-
One Call Ticket onsite?
-
Ask why the one call is not onsite.
-
All Permits Available?
Mains:
-
Are construction drawing on site and readily available?
-
Was 36” of cover achieved?
-
Proper Butt fuse process completed?
-
Were all existing utilities spotted?
-
Was 12” of separation from other utilities achieved?
-
Was main line valves installed and labeled properly?
-
Please explain.
-
Was pipe and fittings installed correctly?
-
Please explain.
-
Was proper sand bedding installed?
-
Was the ditch free of rock and debris?
-
Was proper padding installed?
-
Was tracer wire installed?
-
Please explain why no tracer wire was installed.
-
Was the ditch backfilled and compacted correctly?
-
Please explain.
-
Was caution tape installed correctly?
-
Was anode(s) installed correctly?
Casing:
-
Is a casing being used for mains or services?
-
Is the tracer wire cad welded to the casing?
-
Are insulators or centering cradles being installed?
-
Are end seals being installed?
-
Is a test station being installed?
Pigging:
-
Is main being pigged?
-
Are all pigs numbered?
-
Are all pigs accounted for?
-
How many pigs are lost?
-
Did pigs come out clean and dry?
Pressure Testing Mains:
-
Are pressure test forms on site?
-
Tell us why the foreman did not have a pressure test form.
-
Is a air cooler being used (if using air compressor) for pressure testing?
-
Are pressure gauges calibrated?
-
Is pipe temperature being monitored?
-
Was pressure test completed successfully?
-
What caused the pressure test to fail?
-
Is pressure test forms all filled out correctly?
Purging Mains:
-
Is a approved purge plan on site?
-
Is purge stack(‘s) installed properly?
-
Is the Purge Stack grounded properly?
-
Is nitrogen being injected properly?
-
Is CGI calibrated?
-
Is a CGI being used to monitor?
-
Was the purge successfully completed?
-
What went wrong.
Boring:
-
Is a HDD being used?
-
Is boring form on site and filled out?
-
Are all existing utilities exposed?
-
Please explain why existing utilites were not exposed?
-
Is there 12” of separation from drill head and the existing utility?
-
How close was the drill head from the existing utility?
-
Has drill head stopped rotation while crossing existing utility?
-
Explain why the drill head did not stop?
-
Was a weak link used for pull back?
-
Was the pipe examined at exit pit for damage?
Material integrity:
-
Is the proper material being used for the job?
-
Any damage to pipe?
-
Tell us what is damaged?
-
Any damage to fittings?
-
Please explain what fittings were damaged?
End Page:
-
Work Completed in accordance to all permits?
-
Inspectors Summary
-
Pictures
-
Inspector:
-
Inspector Signature: