Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
What is the specific scope of work for laying the floor coverings in the distillery?
-
What type of floor coverings will be installed, and have they been selected for their suitability in a distillery environment?
-
What are the surface preparation requirements before laying the floor coverings?
-
What safety measures will be implemented, including the use of personal protective equipment (PPE) for workers?
-
How will potential hazards such as chemical exposure, slippery surfaces, or tripping hazards be controlled during the installation process?
-
What equipment and tools will be used for the installation, and how will they be maintained and operated safely?
-
How will you ensure the proper adhesion of floor coverings to the substrate?
-
How will you communicate with distillery personnel to coordinate the installation and manage any potential disruptions?
-
What is the procedure for addressing accidents, chemical spills, or injuries that may occur during the installation?
-
How will you document and keep records of the work, including any inspections, measurements, and incident reports?