Title Page
-
Audit Number
Auditor Details
-
Auditor Name
-
Number: RTM-22-0066
-
Number: AWTM-23-11536-02
-
Number: RTM-20-0062
-
Number: RTM-22-0046
-
Number: AWTM-21-49084-01
-
Number: AWTM-23-48466-03
Work Details
-
Work Description
-
Location of Works (Road Name)
-
Work Reference Number
-
Works Coordinator Name
Audit Details
-
Audit Date and Time
-
Contractor Name
-
Traffic Management Company/Region
Crew Details
Crew Leader Details
-
Was the Crew Leader on site and available to the Auditor?
-
Crew Leader Name
-
Accreditations
-
Crew Leader Name
-
Accreditations
WTM/AWTM Details
-
Was there a WTM/AWTM on site where required?
-
Is the WTM/AWTM also the Crew Leader?
-
As per the details above.
-
WTM/AWTM Name
-
Accreditations
Traffic Management Crew Details
-
Is there a completed JRS/SWMS on site? (Upload a copy)
-
Were all of the Traffic Management Personnel able to present current accreditation?
Documentation Findings
Approval Observations
-
RNOC contacted and recorded in Daily Dairy?
-
Road Authority approvals or permit conditions complied?
-
Rail Authority approvals or permit conditions complied?
-
Public Transport Authority approvals or permit conditions complied?
-
Heavy Vehicle Services approvals or permit conditions complied?
Daily Dairy Observations
-
Daily Dairy completed and on site at time of inspection?
-
Daily Dairy details supervisor initial drive through or additional site checks?
-
Daily Dairy details mandatory information? (TGS installed, times etc.)
-
Modifications have been made to site and recorded in the Daily Dairy?
Pre-start Observations
-
Pre-start meeting completed and evidence recorded?
-
Were all risks covered in the Pre-start meeting?
Traffic Management Assessment Observations
-
Traffic Management Assessment on site at time of inspection?
-
Setup as per Traffic Management Assessment?
-
Traffic Management Assessment correct version on site?
-
Traffic Management Assessment approved?
Traffic Guidance Scheme Observations
-
Traffic Guidance Schemes on site at time of inspection?
-
Setup as per Traffic Guidance Schemes?
-
Traffic Guidance Schemes correct version on site?
-
Traffic Guidance Schemes approved?
-
Traffic Guidance Schemes suitable for the works?
Traffic Management Plan Observations
-
Traffic Management Plan on site at time of inspection?
-
Traffic Management Plan correct version on site?
-
Traffic Management Plan approved?
Risk Assessment Observations
-
Risk Assessment completed where required?
-
Risk Assessment suitable to the risk/hazard?
Site Availability Observations
-
Existing worksite present no prior arrangements?
-
Existing worksite present with conflicting arrangements?
-
Site suitable for the works?
Static Setup Findings
Speed Zone Observations
-
Existing contradictory speed signs covered with suitably opaque material?
-
Existing posted speed correctly reinstated?
-
Times of speed zones recorded in the Daily Dairy?
-
Speed signs doubled up where required?
-
Repeater speed signs installed after side roads or through speed zone?
Lane Closure Observations
-
Adequate taper length provided through merge taper?
-
Required chevrons installed through lane closures?
-
Flashing Arrow Board installed within lane closures?
-
Lane closures installed on all approaches?
-
Adequate lane widths provided through lane closure?
-
Times of lane closures recorded in the Daily Dairy?
Reversible Flow Observations
-
Adequate taper length provided through traffic control taper?
-
Missing Traffic Controller positions where required?
-
Adequate distance between Stop Here When Directed signs for the required capacities?
-
Adequate lane widths provided through reversible flow?
-
Times of reversible flow recorded in the Daily Dairy?
Road Closure Observations
-
Road closure approved by Road Authority?
-
Missing road closure signage where required?
-
Missing detour signage where required?
-
Missing Traffic Control positions where required?
-
Times of road closure recorded in the Daily Dairy?
-
Detour suitable for all vehicles?
Intersection Control Observations
-
Intersection control approved by MTM or RPI?
-
All approaches to the intersection controlled by Traffic Controllers?
-
Correct/safe sending procedures by Traffic Controllers?
-
Times of intersection control recorded in the Daily Dairy?
-
Adequate pedestrian management during flashing amber?
Traffic Hold Observations
-
Adequate hold time provided for traffic conditions?
-
Times of traffic holds recorded in the Daily Dairy?
Aftercare Observations
-
Missing or not maintained signs where required?
-
Missing delineation of hazards where required?
-
Adequate protection of hazards where required?
-
Worksite signage not removed during aftercare hours?
-
Adequate speed zone provided during aftercare hours?
Contra-flow Observations
-
Adequate controls provided for all approaches?
-
Adequate crossover locations provided for all vehicles?
-
Missing or not maintained signs where required?
-
Times of contra-flow recorded in Daily Dairy?
Temporary Alignment Observations
Temporary Road Safety Barrier Observations
Mobile Arrangement Findings
Convoy Vehicle Operation Procedure Observations
-
All required vehicles in the convoy provided?
-
Adequate convoy arrangements for the works?
-
Adequate sight distance to the convoy vehicles?
-
Congestion caused from convoy arrangements?
-
Speed suitable for convoy and work arrangements?
-
Convoy used when works are not mobile?
-
Works vehicles greater than 40m apart and within the same convoy?
-
Driver of shadow vehicle exiting cab while in mobile arrangement?
-
Driver of shadow vehicle performing functions other than driving or watching oncoming vehicles?
-
Truck Mounted Attenuator used where required?
-
Vehicle undertaking multiple tasks in convoy? (Vehicle is shadow and advanced warning etc)
-
Continuous communication maintained during convoy?
-
Pedestrian/cyclists catered for during convoy?
-
Vehicle Mounted Warning Devices used and visible? (excluding small plant)
Convoy Signage/Device Observations
-
Signs attached to convoy vehicles?
-
Sign type/condition suitable for the convoy arrangement?
-
Approved signs used?
-
Signs displayed for all directions of travel?
-
Vehicle mounted arrow boards installed on all convoy vehicles? (excluding small plant)
-
Signs clearly visible to all approaching traffic?
Convoy Spacing Observations
-
Adequate convoy spacing provided?
-
Adequate buffer/shunt for Shadow Vehicle/Truck Mounted Attenuator?
Plant/Equipment Findings
Signage Observations
-
Existing contradictory signs covered with suitably opaque material?
-
Adequate lateral clearance to live traffic?
-
Adequate sign size for road environment?
-
Adequate image/type of sign?
-
Adequate condition of sign maintained?
-
Adequate location of sign?
-
All signs required from Traffic Guidance Scheme installed?
-
Approved signs used?
Truck Mounted Attenuator Observations
-
Adequate protection provided by Truck Mounted Attenuator?
-
Image on Flashing Arrow Board correct?
-
Image on Variable Message Board correct?
-
Truck Mounted Attenuator on site but not deployed?
-
Adequate ingress/egress procedures by Truck Mounted Attenuator?
-
Adequate location of Truck Mounted Attenuator?
-
Truck Mounted Attenuator driver suitably harnessed?
-
Adequate distance between Truck Mounted Attenuator and Worksite maintained?
Light Vehicle Observations
-
Adequate light vehicle provided? (maintained)
-
Adequate Vehicle Mounted Warning Device provided?
-
Parked in suitable location?
Plant Vehicle Observations
-
Adequate plant provided? (maintained)
-
Adequate Vehicle Mounted Warning Device provided?
-
Used in suitable location?
-
Suitable to site conditions?
Flashing Arrow Board Observations
-
Flashing Arrow Board in correct location?
-
Flashing Arrow Board setup correctly?
-
Flashing Arrow Board suitable size for conditions?
-
Flashing Arrow Board installed where required?
Variable Message Board Observations
-
Variable Message Board image appropriate?
-
Variable Message Board image as per Traffic Management Advice?
-
Variable Message Board installed in correct location?
-
Variable Message Board installed where required?
Delineation Observations
-
Correct delineation spacing for site conditions?
-
Correct type of delineation used to protect site/hazard?
-
Delineation installed where required?
-
Path of delineation unclear or suitable for conditions?
-
Delineation suitably maintained?
-
Delineation blocking access to side roads and driveways?
-
Adequate lane width provided?
Shadow Vehicle Observations
-
Adequate protection provided by Shadow Vehicle?
-
Adequate distance between Shadow Vehicle and worksite maintained?
-
Image on Flashing Arrow Board correct?
-
Image on Variable Message Board correct?
-
Adequate location of Shadow Vehicle?
Portable Traffic Control Device Observations
-
Portable Traffic Control Device used where required?
-
Adequate location of Portable Traffic Control Device?
-
Portable Traffic Control Device maintained?
-
Adequate sight distance to Portable Traffic Control Device?
-
Adequate Portable Traffic Control Device signage installed?
-
Portable Traffic Control Device suitable for site conditions?
Site Safety Findings
Motorist Safety Observations
-
Adequate road surface maintained during works?
-
Adequate sight distance provided to worksite and signs?
-
Adequate advanced warning provided of worksite?
-
Adequate travel path provided?
-
Adequate protection provided of hazard?
Speeding Observations
-
Adequate speed provisions where speed is observed?
-
Adequate temporary speed zones provided for the works?
Worker Safety Observations
-
Adequate escape routes provided for workers?
-
Adequate lateral clearance for workers to live traffic lanes?
-
Adequate protection provided for workers?
-
Workers within live traffic lanes?
-
Workers within safety buffer?
-
Correct PPE worn on site?
-
Evidence of pre-start meeting held?
-
Adequate lighting provided for the worksite?
Traffic Management Implementer/Controller Safety Observations
-
Adequate escape routes provided for Traffic Controllers?
-
Adequate lateral clearance for Traffic Controllers to live traffic lanes?
-
Adequate protection provided for Traffic Controllers?
-
Traffic Controllers within live traffic lanes?
-
Traffic Controllers within safety buffer?
-
Correct PPE worn on site?
-
Evidence of pre-start meeting held?
-
Traffic Controller used in lieu of a Portable Traffic Control Device?
-
Correct Traffic Control procedures during reversible flow/intersection control?
-
Night wands used for night works?
-
Radio communication maintained by Traffic Controllers?
-
Adequate lighting provided for Traffic Controller positions?
-
Adequate sight distance provided to Traffic Controller positions?
-
Speed reduced to 60km/h during Traffic Control operations?
-
Adequate advanced warning signage for Traffic Controllers?
Night Provision Observations
-
Adequate lighting towers provided for the worksite/hazards/workers?
-
PPE provisions accommodating reduced visibility at night?
-
Signs/devices suitably retro-reflective for night works?
Vulnerable Road User Observations
-
Adequate path facilities provided?
-
Equipment/devices within path?
-
Untreated excavations adjacent to path?
-
Adequate advanced warning signage provided?
-
Adequate delineating devices provided?
-
Adequate consultation and approvals provided for impacts?
Work Timing Observations
-
Setup within the specified times?
-
Times not suitable for the road environment?
-
Work times recorded in the Daily Dairy?
Vehicle Management Observations
-
Adequate ingress/egress locations for vehicles?
-
Ingress/egress locations obvious?
-
Safe vehicle movements within site?
Signalised Intersection Impact Findings
Signal Phasing Observations
-
Signal phasing impacted by Traffic Management?
-
Congestion/delays impacting signal phasing?
Signal Loop Observations
-
Adequate approval/notification provided for signal loop impacts?
-
Signal loops impacted by Traffic Management?
-
Signal loops damaged during works?
Additional Photos and Documents
-
Upload any additional Photos/Documents related to the audit.