Information
-
Site conducted
General Information
-
Site Name
-
Customer
-
Customer Contact
-
Phone
-
Email
-
Site Address
-
WTG #
-
Manufacture
-
Model
-
Serial Number
-
Scope of work
-
Job Lead
-
Team Members
-
Name Plate
Pre-Repair Condition
-
Trash, Oil, Damaged Equipment, Cleanliness, Oil Level
-
(GBX) Inspect oil Lines for damage. Report immediately. Via Email with site manager and Upower Team LFE.
-
Any damaged equipment on WTG. Report via email with site manager and Uptower Team LFE.
-
Photo
-
Comments
Repair
- Disassembly
-
Photos of Disassembly
-
Comments
Damaged Parts
-
Photos of Damage
-
Comments
Repair - Assembly
- Assembly
-
Photos of Assembly
-
Comments
Parts
-
Photos of New Parts
-
Serial Number
Post Repair Condition
-
Take photos of turbine condition after Repair
-
Ensure no tools are left in Components
-
Ensure all oil lines are tight and not damaged
-
Bolts torqued to manufacturer specification
-
Work areas cleaned
-
Rotor Lock disengaged
-
Leak Check
-
Tools put away
-
Turbine walk around
Post Repair Condition
-
Photo
-
Comments
-
Job Summary
Job Summary
-
Note any issues, Parts damaged damaged during repair, leaks.
-
Comments
Calibrated Tooling
- Tool
-
Manufacture
- Hytorc
- 3/4 Torque Wrench
- 1/2 Torque Wrench
- 3/8 Torque Wrench
- 1/4 Torque Wrench
- Multi Meter
- Electrical Gloves
-
Model
- Pressure Gauge
- MXT .7
- MXT 1
- MXT 3
- MXT 5
- STEALTH 2
- STEALTH 4
- STEALTH 8
- BTM-3000
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
-
Calibration Date
Job Completion
-
Signature