Information
-
Document No.
-
Name of Supervisor/Leading Hand
-
Name of worker conducting assessment?
-
Site Number and Location
-
Conducted on
-
Task Being Carried Out
- Copy Change
- Graffiti Clean
- Maintenance
- Vegetation
- Site Measure
- Site Inspection
- Private Job
- Site Clean Up
- Installation
-
Have all workers on site read and understood the SWMS and Site Cards for this site?
-
Read SWMS and Site Card immediately
Quality Check
-
Correct Screws on site and checked?
-
Aerobridge Fixing Form (Screw and Tracking Count)?
-
Tracking checked for right site?
-
Tracking Location installed correctly and securely?
-
Correct Banner for the right Site?
-
ITP Checklist completed?
-
Quality Checklist completed?
-
Banner Correctly installed visually checked and photo taken to supply client
-
Sweep Completed for loose debris?
Site/Access Hazards
-
Have all workers sanitized or washed their hands before starting work?
-
It is the team leader's responsibility to ensure all workers are practicing good hygiene
-
Are the weather conditions suitable for safe work?
-
Insert photo of weather hazard
-
Select from list regarding weather hazards
- Work is indoor, not relevant
- Extra installers will minimise risk
- Changing install method will minimise risk
- Site needs to be held
-
Ring coordinator immediately and submit a site hold form
-
Are there any obstructions to the access point of the site?
-
Ensure objects are moved to a suitable and safe area to access site
If objects cannot be moved, stop works and call Coordinators immediately -
Does this site require you to sign in with Site Management or Security?
-
If yes who was contacted?
-
Are workers able to maintain a physical distance of 1.5m from depot staff and members of the public?
-
Can all material and equipment used be transported to the site safely?
-
Explain method?
-
Has worksite been cordoned off correctly?
-
Equipment used to secure worksite?
- Witches hats
- Barricades
- Tape
- Signage
- Other
-
For other, describe cordon method
Ladders
-
Which ladder are you using?
- Fibreglass Extension 22ft
- Fibreglass Extension 30ft
- Aluminium Extension 22ft
- Aluminium Extension 30ft
- Aluminium Extension 40ft
- Aluminium Step Ladder
- Fibreglass Step Ladder
- Aluminium Platform 1.8m
- Fibreglass Platform 1.8m
- Fibreglass Platorm 2.4m
- Aluminium Platform 2.4m
-
Are the ladders free from major dents or cracks?
-
Are the ladders safe to use?
Traffic Management Checklist
-
Have all work vehicles been parked correctly and in a safe zone?
-
If not, explain how the hazard can be eliminated
-
Are clearances between workers and adjacent traffic being maintained?
-
Has the 'Workers Above"sign been placed on site?
-
Have safety barriers (where used) been installed correctly?
-
Have needs of other road users been provided for?<br>(eg. pedestrians, cyclists, wheelchairs)
In case of emergency
-
In case of emergency - call 000, stay calm and describe the situation clearly to emergency operator. If its a minor incident, near miss or verbal altercation you can call USI - Matthew Lombardi, Steve Balbi or Lee Swale.
-
Are all installers aware of emergency procedures for this site?
-
Hold site until all workers are aware of emergency procedures
-
Has an ambulance pick up point been identified?
-
Hold site until all workers are aware of emergency procedures
-
What is the Pick up point location and suburb?
-
What is the nearest cross street?
-
Is there an abseiler on site
-
Do you have the safety rescue pulley on site?
Electrical Hazards
-
Have all Electrical Hazards been identified and recorded on Site Cards
-
What hazards have been added to site cards?
-
Are there Overhead Power lines (OHPL)?
-
What is the distance (m) and voltage (kV)?
-
What hazard elimination method has been used?
-
List other method used to eliminate hazard of OHPL?
-
If working near an electrical area like switchboard, have precautions been taken?
-
What precautions have been taken?
-
Why can no precautions be taken?
-
Insert photo of any electrical hazards?
Height Hazards
-
Are all workers using fall protection devices like harnesses and are they wearing helmets?
-
Why are workers not wearing fall protection?
-
Are there any height hazards for this site?
-
What is the install method for this site?
- Fixed ladder
- Portable ladder
- Scaffold
- EWP
- Abseil
- Other
-
What size ladder is used for this site?
-
Please show ladder set up, secured and using correct access point
-
Ladders must be placed at a slope of 4:1
-
Can ladder be placed on even ground and secured to sign?
-
How is ladder secured?
- Ladder brackets
- Ratchets
-
Insert photo of ladder hazards?
-
Is ladder being used by one person at a time, footed correctly and the climber has three points of attachment?
-
Describe restrictions in ladder use?
-
Is scaffold in good working order?
-
Insert photo of scaffold hazard
-
Who is ticketed operator?
-
Has operator deemed EWP suitable to task, set up on firm, level ground and completed logbook?
-
Explain EWP hazards?
-
Are all workers trained and deemed competent by management?
-
Hold install and call coordinators immeditely
-
Are all ropes and gear in good condition?
-
Hold installs and ring Coordinator immediately
-
Are anchor points assessed as suitable?
-
Hold installs and call Coordinator immediately
-
Explain other height hazards that may exist?
-
undefined
- Fibreglass Extension 22ft
- Fibreglass Extension 30ft
- Aluminium Extension 22ft
- Aluminium Extension 30ft
- Aluminium Extension 40ft
- Aluminium Step Ladder
- Fibreglass Step Ladder
- Aluminium Platform 1.8m
- Fibreglass Platform 1.8m
- Fibreglass Platorm 2.4m
- Aluminium Platform 2.4m
-
Insert photo of ladder set up, secured at correct access point
-
Ladder must be placed at a slope of 4:1
-
Have all permanent anchor points been inspected, tested and Certified?
-
Are the inspection tags for permanent anchor points in date
-
Are all permanent anchor points / static lines on site considered safe?
-
Hold install and call coordinators immeditely
-
Insert photo of height hazards
Tool Safety
-
Are all tools in good condition and been accounted for?
-
Explain tool hazards
-
Are tools and equipment able to be secured when used at heights
-
Explain tool hazards
-
Are all tools required to be used able to be kept inside cordoned off area?
-
Explain tool hazards
Chemical Hazards
-
Is there an MSDS for all chemicals being used on site?
-
Stop work and ring a Coordinator immediately
-
Have chemical spill procedures been discussed?
-
Stop work and ring a Coordinator immediately
M5 specific hazards
-
Is work being completed on M5
-
Was M5 controller contacted?
-
Will you ensure gates are locked after installation?
General Comments/ Further informtion
-
Supervisors must make sure to write down and discuss hazards and controls as well as any other hazard not recorded elsewhere on the risk assessment
-
Insert toolbox talk topics
Have you discussed the following Toolbox Topics?
-
Falls from Heights
-
Avoiding Manual Handling when folding/unfolding skins
-
Access points/Ladder Brackets
-
Static Lines
-
Anchor Points
-
Inspecting Harness including double yokes, lanyard & shock absorbers
Sign Off Section
-
Supervisor sign off: this risk assessment have been checked by me and verified as true and correct
-
Insert Supervisors name
-
Does the site card or power card require updating for this site
-
Once both the risk assessment and SWMS have been consulted and completed, please sign below to state that you have read and understood all the safety conditions
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert Worker signature
-
Insert any photos of miscellaneous hazards here