Title Page
-
Site conducted
-
Conducted on
-
Location
-
Contracts Manager
-
Site Manager
Incident Details
-
Date of Investigation:
-
Investigation by:
-
Incident Day and Date:
-
Incident Time:
-
Supervisor:
-
Type of Work:
-
Incident Address:
Utility Information (Damaged Utility)
-
Gas
-
Water
-
Electric
-
BT
-
Sewer
-
Other
-
Shown on drawings?
-
Pressure / Voltage?
-
Size of the utility?
-
Service / Main
-
Where is the utility
- Overhead
- Footpath
- Carriageway
- Other
-
Depth of utility
-
Measured or estimated
-
What caused the damage?
-
Ground Conditions
-
Operatives Involved
-
Qualifications of Operator
- CPCS Red
- CPCS Blue
- NPORS
Event Description (giving details of precautions observed, unsafe acts, location of apparatus/ operative in trench,):
-
undefined
Plan Information
-
Were plans on site (Attach Photo)
-
Plans clear and accurate (Attach Photo)
-
Suitable Risk Assessment (Attach Photo)
-
Permit to Break Ground (Attach Photo)
Location Equipment Information
-
Was C.A.T available?
-
Serial Number
-
CAT calibration due
-
Was Genny available?
-
Genny Serial Number
-
Genny calibration due
-
Was C.A.T functioning correctly
-
Was Genny functioning correctly
-
C.A.T data available? (Data checked and downloaded)
Survey- Prior and During Operations
-
Was survey completed prior to works commencing?
-
Was C.A.T used in conjunction with Genny?
-
Were all located utilities marked prior to excavation?
-
Which operative completed the C.A.T /Genny Survey?
-
What modes were utilised during survey e.g Radio?
- Power
- Radio
- Genny
Operation / Excavation
-
Was all underground plant located and marked as required?
-
Was plant located within 500mm of known services?
-
Was mechanical excavation used?
-
If mechanical plant was used, who was the operator
-
If hand excavation, what tools were used and by whom
-
Was the utility damage avoidable?
-
Avoidable
-
Unavoidable
-
Reason
-
Any further comments including previous damage history to the same location or different locations?
Outcome / Findings
-
Investigation findings
-
Action Taken- Corrective Action and Preventative Measures
Check List- The form must not be accepted without the following (list documents attached by reference)
-
Utility plans attached
-
Risk assessment attached
-
Photographs of damaged utility
Completed
-
Signed: