Information
-
Audit Title
-
Audit company name
-
Conducted on
-
Auditor
-
Location
-
Technician Name
-
FSP
-
Address
-
Date of Audit
-
Enter the type of audit below tick as many boxes as required
-
cat1
-
Cat2
-
BAU
-
Deployment
-
Communications fault
-
Routine
-
Post incident
Job Safety analysis for Auditor
-
Asbestos ? Make sure you have adequate PPE and or training if not wait for next site to audit
-
Dog hazard
-
trip slip fall hazard
-
live surfaces
-
wiring in poor condition
-
FSP aware you are not the supervisor
-
Are you safe to start the audit.
-
Is the tech safe to start the work( if no stop process reset until such time as safe to start.)
Site details
-
Location
-
ICP
-
Photo of Site
Customer contact
-
Was the customer there at the time of install
-
Was the doorstep protocol followed
-
Is the technician neat and tidy appearance
-
Is the technicians vehicle of an appropriate type for the job
Technicians PPE and tooling
-
Are all requisite PPE worn at all times required.
-
Is there a first aid kit
-
Overalls
-
Work boots
-
Safety glasses
-
is there an in test fire extinguisher
-
Is there an emergency blanket
-
Expiry Date of Gloves
-
Last test date of Ladder
-
Calibration date of Voltage tester
-
Are all equipment in test and not expired
-
Type of Tools
-
Current status of techs tooling
- Tech uses trainers tools
- Tech has own tools but some appear missing
- Techs tools are complete
- This tech should not be allowed tools safer for everyone
-
Does the tech have a torque Screwdriver set to the appropriate value
-
Does the tech have a signal tester
Technicians Hazard assessment
-
In this section assess the technicians hazard awareness process. Mark as safe /Not safe (eg not identified) or not applicable
Make an assessment if the technician is safe to proceed . If they are not then stop the work -
Can the technician identify the general hazards at the site (if this is not safe stop the job and discuss)
-
Does the technician show good hazard awareness and control
- Tech identifies obvious hazards
- Tech approaches board using safe to start principles
- Tech looks for additional hazards
- Tech takes 5 if additional hazards are found during audit
- Tech advises Auditor of hazards found
- Technician adequately controls site
-
Has the technician identified any ACM on Site and has a method of control
-
Has the technician dealt with a potentially aggressive customer
-
Has the technician Dealt with the Dog hazard on site
Technicians work assessment
-
In this section we are assessing how well the tech sets up for the job. Checking is he at the coorect site and is it safe to proceed.
-
Site confirmation Checks - what method did the tech use
- Street address plus
- street address only
- meter serial number
- Gps location
- relay serial number
- meter reads
-
What does the work involve what does the tech believe they are there for
- Coms Fault
- RA
- Install meter
- Deploy meter
- New connection
- Cat 2
- Tech has no idea
-
Technician performed a correct metrology audit
-
Technician correctly used the UTC process safely
-
Select the items that the technician performed in the safe to start list
- Hazard sweep performed
- board proven touch safe
- none
- gloves are on at all critical points
-
Data gathering completed correctly
De-energising the site
-
In this section we are assessing how the technician makes the site safe to work on from a preparation for work basis
-
Has the technician checked the existing polarity of the site
-
Has the Tech assessed how many phases we are dealing with
- Has tested using voltmeter
- Has tested Phase to phase if multiphase
- Has tested Phase to neutral
- no testing completed
-
Has the technician got a plan for isolation of the site
-
Has the Technician correctly isolated the metering
- Isolated
- Tested de-energuised
- locked of or taped off
- live isolation
- worked live unneccesarily
- worked live when not allowed
-
Has the technician proven de-energised
- Proven instrument
- Tested appropriately
- Proven post testing
- no testing performed
Key work steps to installing and commissioning a meter
-
Key work steps associated with the installation of the meter and post installation testing
-
Equipment mounted Correctly
- equipment square
- multiple mounting points used
- 10mm gap achieved
- mounted poorly
- mounted over other equipment
- At least two mounting points used one of which is top mounting
-
Conductor Termination
- Terminal between 20 and 80 percent
- torque screw driver used correctly
- Cable stripped correctly
- ferrules used if appropriate or tech is aware of requirement if NA
- minor wire behind major
- not correctly terminated
-
Conductor installation
-
Site isolation and re-energisation
-
Polarity testing
- Trailing earth
- current imbalance
- neutral earth impedance
- no polarity testing completed
-
Function Testing
- Meter function test completed
- no function testing complete
- Relay function tested
- register advance test completed
- Evidence of timing of pulses of known load sighted
-
Signal testing making the comms
- signal testing completed
- Door closed
- aerial rules understood and used
- NA
- No signal testing complet
- Appropriate signal tester used
- modem aerial combo correct
- correct ground plane added
- Wrong combination of equipmwent
-
Seals and stickers
- Retailer sticker if required
- Component stickers
- site cert sticker
- Warning stickers
- no stickers
-
ESR and EIPC certification
-
Checking of main switch terminations and additional wiring
-
Correct implementation of preapprovals if any
- Preapproval was required
- preapproval implemented correctly
- preapproval met process
- Preapproval selected was the cheapest one
- Preapproval not required or implemented incorrectly
- NA
Overall impression of Technician
-
This section of where you give your impression of the tech . Is his process easy and fluid and looks like it is commonly used or is it just been tried for the first time today
-
Trade skills
-
Customer contact
-
Work Audit
-
Hazard Audit
-
Site left tidy
-
Copy sent to FSP
Key action list
-
Add notes of any Actions that are required. May include additional information the technician needs to work effectively
Audit Sign off
-
This is the Audit Sign off . Make an assessment of level of success or failure of the audit.
-
Add photos if required
-
Pass failure criteria
Pass = good install no issues
Pass with workons = Good install but tech was asking lots of questions
Fail non safety critical = did not pass due to multiple administrative issues
Fail Safety critical = Fail due to missing PPE/failure to test /incorrect termination -
Audit outcome
-
Moderation notes- Add any notes in here that will help with Moderation of the Audit. eg part audit only
-
Auditor name and signature
-
Time and date of completion