Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Site Image

  • This Audit is in a holistic format and suitable for all operational audits in regards to vegetation clearing in electrical environments. Please ensure sections are completed as required depending on works undertaken. Once Auditor is satisfied that all sections are completed satisfactorily there is three export options available. Media can be added to all questions in form of photo to show compliance to Safe/Yes answers, alternatively media and comments need to be added for any No/Not Safe Answers. Observations should be noted in comments of No/Not Safe answer and any media added if appropriate to explain issues or highlight compliance. Observations can be added to all Yes/Safe answers if required. To provide a summary of Non-Conformances. Export as PDF and select options to only show No/Not Safe responses. Refer to iAuditor User Guide for further instructions on exporting audit reports.

Crew Members

  • Full Name

  • Passport (Note ID Number)

  • Vehicle Licence (note type and expiry date)

  • EWP Licence (note expiry)

  • Client ID # (where applicable)

  • Full Name

  • Passport (Note ID Number)

  • Vehicle Licence (note type and expiry date)

  • EWP Licence (note expiry)

  • Client ID # (where applicable)

  • Full Name

  • Passport (Note ID Number)

  • Vehicle Licence (note type and expiry date)

  • EWP Licence (note expiry)

  • Client ID # (where applicable)

  • Full Name

  • Passport (Note ID Number)

  • Vehicle Licence (note type and expiry date)

  • EWP Licence (note expiry)

  • Client ID # (where applicable)

  • Full Name

  • Passport (Note ID Number)

  • Vehicle Licence (note type and expiry date)

  • EWP Licence (note expiry)

  • Client ID # (where applicable)

  • Full Name

  • Passport (Note ID Number)

  • Vehicle Licence (note type and expiry date)

  • EWP Licence (note expiry)

  • Client ID # (where applicable)

1.0 Vehicle / Plant Detail

  • Truck/Plant A

  • Item Image

  • Type of Item

  • Registration No

  • Unit No

  • Height Displayed on Label

  • Registration Sticker

  • Operators Manual

  • Vehicle service current

  • Daily checklist

  • Wash down log book

  • Registration Plates

  • Fuel Container Approved and labelled

  • Herbicide Container Approved and labelled

  • Marker dye

  • Water container and fresh water

  • First Aid Kit and sticker displayed

  • Spill Kit

  • Fall Arrest

  • Fire Extinguisher

  • Flashing light/s all operational

  • Reverse Warning beeper operational

  • Wheel chocks x 2

  • Knapsack

  • Rake Hoe

  • Vemco Group logo

  • Client logo

  • Seat belts in good order

  • No smoking sign displayed

  • Safety Savers displayed

  • Sunscreen and Insect repellent on vehicle

  • Pedestrian Warning Sign

  • 2 x Symbolic Worker (Class 1 reflective - 900 x 600)

  • 2 x Prepare to stop (Class 1 Reflective 900 x 600)

  • 2x Pedestrian Watch your step

  • 6 stands for Signs

  • 2 x Stop Slow Bats

  • 2 x Chevrons

  • 12 Witches Hats

  • Truck/Plant B

  • Item Image

  • Type of Item

  • Registration No

  • Unit No

  • Height Displayed on Label

  • Registration Sticker

  • Operators Manual

  • Vehicle service current

  • Daily checklist

  • Wash down log book

  • Registration Plates

  • Fuel Container Approved and labelled

  • Herbicide Container Approved and labelled

  • Marker dye

  • Water container and fresh water

  • First Aid Kit and sticker displayed

  • Spill Kit

  • Fall Arrest

  • Fire Extinguisher

  • Flashing light/s all operational

  • Reverse Warning beeper operational

  • Wheel chocks x 2

  • Knapsack

  • Rake Hoe

  • Client logo

  • Seat belts in good order

  • No smoking sign displayed

  • Safety Savers displayed

  • Sunscreen and Insect repellent on vehicle

  • Pedestrian Warning Sign

  • 2 x Symbolic Worker (Class 1 reflective - 900 x 600)(Workman Ahead)

  • 2 x Prepare to stop (Class 1 Reflective 900 x 600)

  • 6 stands for Signs

  • 2 x Pedestrian Watch your step

  • 2 x Stop Slow Bats

  • 2 x Chevrons

  • 12 Witches Hats

  • Truck /Plant C

  • Item Image

  • Type of Item

  • Registration No

  • Unit No

  • Height Displayed on Label

  • Registration Sticker

  • Operators Manual

  • Vehicle service current

  • Daily checklist

  • Wash down log book

  • Registration Plates

  • Fuel Container Approved and labelled

  • Herbicide Container Approved and labelled

  • Marker dye

  • Water container and fresh water

  • First Aid Kit and sticker displayed

  • Spill Kit

  • Fall Arrest

  • Fire Extinguisher

  • Flashing light/s all operational

  • Reverse Warning beeper operational

  • Wheel chocks x 2

  • Knapsack

  • Rake Hoe

  • Vemco Group logo

  • Client logo

  • Seat belts in good order

  • No smoking sign displayed

  • Safety Savers displayed

  • Sunscreen and Insect repellent on vehicle

  • Pedestrian Warning Sign

  • 2 x Symbolic worker (Class 1 reflective - 900 x 600)

  • 2 x Prepare to stop (Class 1 Reflective 900 x 600)

  • 2 x Pedestrian Watch your step

  • 6 stands for Signs

  • 2 x Stop Slow Bats

  • 2 x Chevrons

  • 12 Witches Hats

2.0 Preliminary / Worksite Hazard Management

  • 2.1 Has the Site Supervisor in control of the Worksite been identified and recorded on the HAC?

  • 2.3Has the scope and sequence of the work to be performed been discussed with and understood by each Work Group member, including all Safety Observers.

  • 2.4 Has a Hazard Assessment Checklist been undertaken, documented and communicated by the Supervisor/Employee in Charge to each member of all Work Groups?

  • 2.5 Hazards particular to site have been identified and effective controls implemented

  • 2.6 Where you asked to sign onto HAC / JSA

  • 2.8 Does each member of the Work Group understand the HAC process? (ie Worksite specific hazards identified with suitable control measures implemented and monitored throughout the tasks).

  • 2.9 Has the relevant SWMS been identified and does each member of the Work Group have full understanding of their content and the application to the work being undertaken by each Work Group member.

  • 2.10 Has an appropriate sized area “Drop Zone” been identified and delineated? (with reflective cones, barriers in place).

  • 2.11 Are appropriate rescue/escape facilities available/operational?

  • 2.12 Are complete and in test rescue kits in place and prepared for use at the Worksite prior to performance of any works?

4.0 PPE / Hearing Conservation / First Aid Kit

  • PPE ("Safe" or "At Risk" only) # To be replaced every two (2) years or as required. (Refer AS NZS 4836.204)

  • 4.1 Protective Clothing

  • 4.2 Steel Cap Safety Boots

  • 4.3 Hard Hat #

  • 4.4 Hardworking Gloves available

  • 4.5 Eye Protection

  • 4.6 Hearing Protection #

  • 4.7 High Visibility Vest/Outer Garment

  • 4.8 Chainsaw Chaps

  • 4.9 All employees trained and refreshed annually on the correct use and maintenance of PPE

  • 4.10 Plugs to be used only once

  • 4.11 Ear muffs to be regularly inspected

  • 4.12 Inside cushion to be carefully inspected

  • 4.13 Are the correct class of insulating gloves worn? Are they in test?

  • Hearing Conservation

  • 4.14 Ear muffs to be structurally sound. One per person

  • 4.15Are hearing protection warning signs on plant/equipment clean and clearly visible?

  • First Aid Kit

  • 4.16 Check contents of First Aid Kit via contents list.

  • 4.17 Are the items in First Aid Kit in date? Apply Date.

5.0 Manual Handling

  • 5.1 What manual handling tasks occurring on site? List. (Manual handling includes: lifting, pushing, pulling, grabbing, holding, reaching or carrying)

  • 5.2 Is Manual Handling noted on JSA/HAC sheet and SWMS' applicable to tasks?

  • 5.3 What control measures have been used?

  • 5.4 Is there frequent reaching above shoulder height?

  • 5.5 Is there excessive or prolonged twisting of the back or neck?

  • 5.6 Is job rotation being practiced to reduce the likelihood of manual handling injuries? Comment what rotation?

  • 5.7 Are manual handling techniques being adopted acceptable for the hazards associated with the task?

6.0 Safe Approach Distances

  • 6.1 Up to1000V No Contact

  • 6.2 Above 1000V up to and including 22kV 700 mm

  • 6.3 Above 22kV and up to and including 66kV 900 mm

  • Tree Clearance

  • LV:

  • 6.4 Above: Touching (clear but control the cut limbs)

  • 6.5 Below: Touching (Risk Assessment)

  • 6.6 Adjacent: Touching

  • 6.7 Through: Take extreme care (Risk Assessment)

  • 6.8 Between LV & HV Conductors: Clearing not permitted

  • HV up to 22kV

  • 6.9 Through/Above: not to be cleared (when live)

  • 6.10 Below: No Contact (risk assessment required)

  • 6.11 Adjacent: 700 mm

  • 22kV up to 66kV

  • 6.12 Through and/or Above: Not to be cleared (when live)

  • 6.13 Below: No Contact (risk assessment required)

  • 6.14 Adjacent: 900 mm

  • EWP

  • 6.15 All personnel to stay > 6m from EWP when near live apparatus unless safety observer posted.

  • 6.16 No EWP shall approach closer than 6.4m to live apparatus unless: - In vehicle mode, - Personnel authorised, - Line is isolated and earthed, - Insulated conductors, -Safety observer posted

  • 6.17 Earth chain to be lowered to the ground, Question for crew, "what is the correct diameter link for voltages up to and including 66kv?"

  • 6.18 Are insulating tools used?

  • 6.19 Is EWP Operator aware of location of energised conductors/equipment in close vicinity to where they are working?

  • Safety Observer

  • 6.20 Is a trained and competent Safety Observer (including for Exclusion Zones, Live Work, Live Line) on Worksite for the work being carried out.

  • 6.21 Are all exclusion zones to potential energised conductors or plant maintained during both access to and work activities being undertaken at the worksite?

  • 6.22 Does each Work Group member understand and demonstrate knowledge of approach distances/exclusion zones?

  • Training

  • 6. All employees trained in a course approved by the State Office of the Chief Electrical Inspector and authorisation is renewed every 12 months

7.0 Chainsaw

  • Preparation

  • 7.1 Chainsaw to be fuelled in clear surroundings

  • 7.2 Operator to be trained and authorised

  • Operating Chainsaw

  • Insert Image of all chainsaw operators demonstrating correct use of equipment.

  • 7.3 Inspect chainsaw prior to starting

  • 7.4 Start chainsaw with decompression devises engaged and in ground when cold

  • 7.5 If warm start chainsaw either on ground or between legs

  • 7.6 Good balance, stance

  • 7.7 Correct thumb position

  • 7.8 Check operation of chain-brake

  • 7.9 Surrounding area clear of hazards

  • Cutting

  • 7.10 Cut compression side of limb first

  • 7.11 Dogs up against wood

  • 7.12 Cut at peak revs

8.0 Climbing

  • Preparation

  • 8.1 Climbing ropes to be stored in a dry area away from oil, fuel etc.

  • 8.2 Assess tree & general area for hazards, i.e. Heaving of ground, Fungal fruiting bodies, Bees & Wasps, Dead branches etc.

  • 8.3 Planned climbing path identified and can be communicated.

  • 8.4 Selected tie off point

  • Climbing Equipment

  • Climbing ropes are long enough and in good condition (2 required)

  • Fall arrest inspection and maintenance documentation current and sighted? (All harnesses, ropes and carabiners must comply with AS 1891.1 1995

  • Check gates open and close effectively

  • Check work ropes are long enough and on good condition. (1 required)

  • Spurs (straps, gaffs sharp, pads and buckles OK)

  • Equipment raised and lowered by approved techniques and equipment.

  • Personal safety equipment.

  • Chainsaw pants

  • Aerial rescue kit in position (kit checked daily before operation)

  • Techniques.

  • Controlled movement within the tree archived by climber including the handling of equipment and cut tree limbs

  • Clear work area maintained under target tree by ground personnel.

  • Stable anchor points for ropes selected.

  • Climbing irons (spurs) only used in approved situations (removal and rescue only)

  • Tree ascended by approved methods with climber tied in at all times with only one person in target tree.

9.0 Tree Felling Techniques

  • 9.1 Have appropriate clearing techniques been employed with only targeted Vegetation removed and required profile established?

  • 9.2 Is correct plant and equipment being selected for most practical method of clearing vegetation?

  • 9.3 Is clearance from overhead conductors and plant to vegetation being maintained?

  • 9.4 Is pruning and trimming being performed to AS 3473 “Amenity Tree Pruning” required standards?

  • Preparation

  • 9.5 Min two employees / Gang trained and authorized. List Names:

  • 9.6 Inspect the tree for weight distribution

  • 9.7 Look for loose limbs which may dislodge

  • 9.8 Avoid if possible, windy conditions

  • 9.9 Inspect surrounding to ensure all people clear

  • 9.10 Logs, rocks or branches are cleared from base of tree

  • 9.11 Undergrowth near the tree is clear

  • 9.12 Direction of fall will clear tree of wires, snags etc.

  • 9.13 Faller has clear and safe escape route

  • Tackle

  • 9.14 Checked prior to use

  • 9.15 Rigged appropriately

  • 9.16 Wedges and hammer at hand

  • Scarf Cut

  • 9.17 Scarf in best position to determine direction fall

  • 9.18 Opening cut at 45 degrees

  • 9.19 Horizontal cut extending ¼ to 1/3 into diameter of trunk

  • 9.20 Two cuts must be clear of wood fragments

  • 9.21 Level and sawn (10% of the diameter of the trunk) above the horizontal plane

  • Back Cut

  • 9.22 Level and sawn (10% of the diameter of the trunk) above the horizontal plane

  • 9.23 Leave sufficient hinge wood

  • Saw should be clear of tree when it falls.

  • Stump Grinding (quality assessment)

  • 9.24Stumps ground to a depth of 250mm below ground surface level?

  • 9.25 Stump holes back filled and compacted to original ground level with tolerance (no trip hazards remain)?

  • Debris

  • 9.26 Are cleared vegetation/debris being safely stacked/distributed across area (chip/mulch) or disposed of in accordance with requirements?

10.0 Live Line Vegetation Removal Techniques

  • 10.1 Have all control measures been implemented/ considered prior to working live?

  • 10.2 Are appropriate Live Line Vegetation Removal Techniques employed to prune vegetation?

  • 10.3 Is a trained and competent Safety Observer (including for Exclusion Zones, Live Work, Live Line) on Worksite for the work being carried out.

  • 10.4 Are Insulating Barriers in place when Live Line approach distances encroached upon?

  • 10.5 Is integrity of insulating properties of conductors and structures proven if suspect?

  • 10.6 Live Line Vegetation removal not being attempted in gusty/high wind conditions, wet, foggy or unsuitable weather conditions?

  • 10.7 Are hydraulic hoses being prevented from contacting conductors?

  • 10.8 No vegetation removal is occurring where vegetation encroaches upon air insulating distance for system voltage (up to and including 33kV)?

  • 10.9 Voltages exceeding 33kV; no removal is occurring of vegetation encroaching upon Live Line approach distance to energised conductors?

  • 10.10 Should vegetation inadvertently fall on conductors, size of cut vegetation shall not provide a conductive path with different potential and/or cause movement of the conductors?

  • 10.11 Is hydraulic insulated long reach chainsaw correctly used to remove vegetation?

  • 10.12 Is Live Line equipment maintained in clean and dry condition?

  • 10.13 Is Live Line equipment being utilised in test with SWL clearly defined?

  • 10.14 Is Live Line equipment being utilised, stored, transported and handled with damage?

  • 10.15 Is vegetation being moved outside approach distance and kept under complete control during its removal?

  • 10.16 Is chainsaw cutter/bar/conductive objects used/held for vegetation removal not encroached upon Live Line approach distance?

  • 10.17 Are adequate number of Live Line Operators on site for gestation removal being undertaken?

  • 10.18 Has check of conductors/structures of span where vegetation is to be removed being undertaken (or been undertaken) to ensure structurally sound conductors and supporting infrastructure?

  • 10.19 Is Live Line equipment being cleaned, inspected and silicone applied before use?

  • 10.20 Is communications equipment being utilised effectively at worksite with Operator and Safety Observer maintaining constant communication during vegetation removal?

  • 10.21 Are automatic reclosing facilities on feeder inoperative while vegetation removal is occurring?

  • 10.22 Is Live Line equipment being used without exceeding safe working load during vegetation removal?

11.0 Environmental

  • 11.1 Are Worksite operations conducted such that no potential for environmental nuisance or harm to occur, with environmental considerations managed effectively?

  • 11.2 No rubbish on site

  • 11.3 Vegetation Waste is chipped and removed from site OR vegetation waste is cut and stacked – not blocking waterways

  • 11.4 Vegetation which is cut is only that identified on Daily Work Sheet

  • 11.5 Ground disturbance is minimized and rectified if necessary

  • 11.6 Appropriate waste management practices are being followed. Waste transport and disposal license documentation is in place as required

  • 11.7 Check water runoff for evidence of sediment, oil or other hazardous material at work areas close to stream flow.

  • 11.8 Are appropriate sediment control methods employed and effective ensuring no contaminants are entering water sources/systems?

  • 11.9 Are dust and odour environmental controls in place?

  • 11.10 Declared Plants/Weeds – are species identified at Worksite? Inspect vehicles and plant disinfection has been undertaken to ensure weed and soil contamination does not occur. Is the uncontrolled transportation of declared plant seeds eliminated?

  • 11.11 Ensure areas identified for protection have not been damaged or destroyed

  • 11.12 Are oil spills identified/controlled/managed and reported? Are oil spill control kits on hand at the worksite?

  • 11.13 Are impacts on marine plant habitats and other sensitive areas managed correctly?

  • 11.14 Is full compliance with all environmental permits and Environmental Management Plans occurring at the worksite as required?

  • 11.15 Fire Ants – restricted areas identified, compliance with Fire Ant restrictions regarding disturbance of soil and materials transport? (QLD)

12.0 Herbicide

  • 12.1 Trained and authorised employees

  • 12.2 Storage away from food, personnel, cleaning materials

  • 12.3 Material safety data sheet on site (less that 5 yrs. old)

  • 12.4 Clean water, soap, washing facilities available

  • 12.5 Use of safety apparel when mixing solution

  • 12.6 Avoid skin contact at all times

  • 12.7 Mixed to manufacturers specifications

  • 12.8 Marker Dyes stored appropriately and mixed to appropriate rates.

  • 12.9 Herbicide spill kit on vehicle? (Includes all the requirements of MSDS for handling spills)

  • Cut Stump Treatment

  • 12.10 Cut stems as close to ground as possible

  • 12.11 Apply herbicide within 10 seconds of cut

  • 12.12 Larger stumps apply to bark / sapwood zone

  • 12.13 For coppice treat separate shoots

  • 12.14 All stems treated

  • Foliar Spraying

  • 12.15 Spray only when branches are dry

  • 12.16 All branches and leaves to be sprayed

  • 12.17 Do not spray if rain is expected within rain fastness period

  • 12.18 Avoid excessive drift when spraying (wind)

  • 12.19 Keep nozzle close to ground

  • 12.20 Appropriate record/s of application completed

  • 12.21 Has correct herbicide been selected for the targeted species and the operating environment for application?

  • 12.22 Sufficient treatment being applied to achieve required rate and clearing profile?

13.0 Dangerous Goods / Hazourdous Substances

  • 13.1 Chemicals are transported, stored, signed and handled as per MSDS.

  • 13.2 Are containers properly marked for the correct contents?

  • 13.3 Are the MSDS(s) and label(s) for products available at the point of use on the Worksite for the materials kept on the site?

  • 13.4 Are all Work Group members aware of the contents of the MSDS and label for products being used and all the appropriate control measures to be utilised?

  • 13.5 MSDS, Chemical register are readily available and in 5 year issue date

  • 13.6 Does the worksite allow adequate ventilation?

  • 13.7 Are the proper HazChem signs displayed? (where applicable)

14.0 Worksite Traffic Managment

  • Traffic Management Plan

  • 14.1 Traffic Management Plan exists

  • 14.1a       Risk Assessment (HAC) (indicates guidance schemes in use)

  • 14.1b       Traffic Guidance Scheme(Site specific or generic)

  • 14.1c       Specific location details

  • 14.2 Is the plan available for inspection?

  • 14.3 Is the plan appropriate for the work?

  • 14.4 Are documented changes (if any) to the plan available for inspection?

  • 14.5 Generic Guidance Schemes available in vehicle

  • 14.6 Guidance Scheme (inc Speed Limits and Clearance) appropriate to situation. (>3m / -) (1.2m-3m / 60km/h) (<1.2m/40km/h)

  • 14.7 Worksite matches Guidance Scheme (or documented where variations)

  • 14.8 If Memorandum of Agreement (MOA) required, available on site (utility works exempt)

  • 14.9 Have required permit(s) / agreement(s) from all other relevant Authorities been obtained and complied with to cover all work tasks?

  • 14.10 Has the applicable hazard (including vehicular and pedestrian traffic) management and relevant control measures been established (eg correct placement of signs, reflective cones and barriers) and has the levels of planning been satisfied to minimise / eliminate all Worksite hazards?

  • Signs

  • 14.11 Appropriate signs used (Class 1 reflective)

  • 14.12 Signs located appropriately (as per Guidance Scheme or 2D).

  • 14.13 Signs visible to road user

  • 14.14 Signs in good condition

  • Tapers

  • 14.15 Tapers of appropriate length

  • 14.16 Sufficient cones of correct size used. (>60 km/hr – 700mm)

  • 14.17 Reflective tape/sleeves on cones (for night use only)

  • Vehicles

  • 14.18 Vehicles parked correctly

  • 14.19 Revolving lights activated/serviceable

  • Personnel

  • 14.20 Reflective vest/high visibility

  • Other

  • 14.21 Traffic controller required

  • 14.22 Traffic controller used

  • Training

  • 14.21 Sight training/ticket ( should be national ticket )

  • 14.22 Is further training required

15.0 Pre Summer Vehicle / Equipment / Fire Prevention

  • 15.1 Shovel

  • 15.2 Chainsaws – spark arresters fitted.

  • 15.3 Exhaust system (proper type) *exhaust silencing device functioning correctly

  • 15.4 No accumulated dry grass - debris on undercarriage/skid plate

  • 15.5 Additional fire season equipment available

16.0 Vehicle

  • External Vehicle

  • 16.1 Tray General Tidiness (must be trip hazard free, no rubbish present)

  • 16.2 Panels – note any damage (minor - major)

  • 16.3 Light Lenses – note any damage

  • 16.4 Lockers – external – note any damage

  • 16.5 Lockers – internal (check locks are fully functioning)

  • 16.6 Presentable and clean – no excessive build up of mud or grime (record date last washed, check Vemco Group wash down log if applicable)

  • 16.7 Tyre condition – tread, inflation

  • 16.8 Windows free from cracks and chips

  • 16.9 Are the windscreen wiper blades, vehicle horn and reverse beeper in satisfactory working order?

  • 16.10 Mirrors

  • Cabin

  • 16.11 Are all headlights, parking lights, reverse lights, brake lights, hazard lights, indicators, flashing beacons and horn working and undamaged?

  • 16.12 Are there any loose items in the cabin area of the vehicle

  • 16.13 Are all items stowed and secure in the vehicle?

  • Equipment

  • 16.14 Harness in date (record serial # and expiry date)

  • 16.15 Lanyard in date (record serial # and expiry date)

  • 16.16 CDD in date (record date)

17.0 Elevated Work Platforms

  • Paperwork / Documentation

  • 17.1 Electrical test certificates <6 months and copy on truck. Date of last test:

  • 17.2 Weight test certificates <12 months and copy on truck. Date of last test:

  • 17.3 EWP build date < 10 years or rebuilt within last 5 years

  • 17.4 Three (3) monthly inspection carried out and copy on truck. Date of last test:

  • Equipment

  • 17.5 Earth Chain fitted (1 metre on ground)

  • 17.6 Stabiliser Pads (1x per leg)

  • 17.7 EWP Lanyards: Check AS labelled and expiry date

  • 17.8 EWP Harness: Check AS labelled and expiry date

  • 17.9 No extension leads in use on EWP?

  • 17.10 Is EWP auxiliary back up operational?

  • Road Signs

  • 17.11 Pedestrian

  • Booms

  • 17.12 All exposed metal above 4.5m to be LV insulated/covered.

  • 17.13 Means of emergency retrieval required (booms)

  • 17.14 Elbow clearly marked (painted/reflective tape)

  • 17.15 Means of restraining booms during transport

  • Basket / Controls

  • 17.16 Level indicators to be fitted (2 required)

  • 17.17 Duplicate controls to be fitted (basket & turret)

  • 17.18 Controls to be clearly marked (basket & turret)

  • 17.19 Controlled Decent Device (CDD) fitted and tested within date

  • 17.20 Dead man to be fitted

  • 17.21 Emergency stop to be fitted and tested.

  • 17.22 Anchorage points for harness in basket

  • 17.23 SWL clearly marked on basket

  • General

  • 17.24 Vehicle in neat and tidy condition

  • 17.25 Is safety equipment (such as harness) being used that is appropriate for individual risk and/or exposure to personnel with checks on functionality of safety/rescue equipments being made and safety/rescue equipment is not in direct contact with energised apparatus?

  • 17.26 Is a trained and competent Safety Observer (including for Exclusion Zones, Live Work, Live Line) on Worksite for the work being carried out.

  • 17.27 Is EWP ground operator in direct communication with EWP Operator, observing EWP Operator, not performing other duties and in close proximity to ground controls to undertake rescue?

18.0 Tipper Chipper

  • Vehicle

  • 18.1 Tyre condition, incl spare

  • Chipper

  • 18.2 Tow hitch and pintle no excessive wear( no more than one third of hitch or pintle to be worn)

  • 18.3 Emergency brake tear away cable fitted, working (remove tear away from switch on chipper, brakes should be activated, chipper should not be able to be moved.)

  • 18.4 Emergency stop switches working (machine should stop) reset switch after use.

  • 18.5 Control Bar (engage forward, neutral and reverse)

  • 18.6 No excessive debris build-up on chipper

  • Operation and PPE

  • 18.7 Protective eyewear worn

  • 18.8 Hardhat being worn

  • 18.9 Protective hearing worn

  • 18.10 Two people on site when chipper operating

  • 18.11 Branches cut into manageable lengths

  • 18.12 Emergency Stop Button/Bar (tested)

19.0 SkyTrim/Jarraff/Kwicktrim

  • Preparation

  • 19.1 Crew trained for task(s) and authorised

  • 19.2 Appropriate vehicle licence held. (minimum MR)

  • 19.3 Crew aware that all incidents to be reported to Supervisor

  • 19.4 PPE available and being worn as per Minimum Requirements (see Crew Manual)

  • 19.5 Daily Plant Safety Checklist completed fully and appropriately

  • 19.6 Worksite Risk Assessment completed fully and appropriately

  • 19.7 Person in charge of site known by all crew members. List name.

  • 19.8 Safety observer appointed if near powerlines. Write in name.

  • 19.9 Operators Manual Avaliblle

20.0 Excavator / Harvester

  • 20.1 All equipment secure on and in plant when travelling, no loose objects

  • 20.2 FOPS & ROPS Canopy

  • 20.3 All Safety Guards Fitted

  • 20.4 Quick hitch pin

  • 20.5 Horn and reverse alarm operable

  • 20.6 Warning devices and other lights (flashing, head, tail, indicators)

  • 20.7 All vehicle systems in good working order

  • 20.8 Emergency stops where fitted operable (eg. Deadman switches)

  • 20.9 UHF Radio Fitted (if not fitted, has a hand held radio been supplied)

  • 20.10 Additional fire season equipment available

  • 20.11 Cleanliness of vehicle

21.0 Tractor Mounted Mulcher / Posi Track / Dozer / Bobcat / Skid Steer

  • 21.1 Plant not being used on slide slope more than 15 degrees

  • 21.2 FOPS & ROPS Canopy (if applicable)

  • 21.3 Voice activated 2 way radio system being used between operator and observer

  • 21.4 If observer within 10 metres of plant, hearing protection used

  • 21.5 Site Inspection completed and documented and potential hazards identified and marked (auditor to sight)

  • 21.6 All equipment secure on and in plant when travelling, no loose objects

  • 21.7 All Safety Guards Fitted

  • 21.8 Horn and reverse alarm operable

  • 21.9 Warning devices and other lights (flashing, head, tail, indicators)

  • 21.10 All vehicle systems in good working order

  • 21.11 Emergency stops where fitted operable (eg. Deadman switches)

  • 21.12 Additional fire season equipment available

  • 21.13 Cleanliness of vehicle

22.0 Truck and Trailer (Float)

  • 22.1 All equipment secure on and in truck when travelling, no loose objects

  • 22.2 All Safety Guards Fitted

  • 22.3 Horn and reverse alarm operable

  • 22.4 Warning devices and other lights (flashing, head, tail, indicators)

  • 22.5 All vehicle systems in good working order

  • 22.6 Emergency stops where fitted operable (eg. Deadman switches)

  • 22.7 UHF Radio Fitted (if not fitted, has a hand held radio been supplied)

  • 22.8 Additional fire season equipment available

  • 22.9 Cleanliness of vehicle

23.0 Worksite Reinstatement

  • 23.1 Is Worksite being left clean and tidy during works and after completion of works (all debris removed from site that is then left in an unacceptable condition)?

  • 23.2 Is there a cleared corridor surrounding overhead conductors and supporting infrastructure and tracks being left free of potential for erosion to occur?

  • 23.3 Is private property being left undamaged during and at completion of all services at the worksite?

  • 23.4 Are all potential hazardous stakes or stumps at Worksite being identified and removed during reinstatement?

Sign off and verification.

  • Comments

  • Has there been non conformances identified?

  • Unsafe work practice or OHS Hazard? (if yes issue a hazard report form)

  • Changes required to procedures SWMS? (record comments)

  • Auditors Signature

  • Crew Leader / Supervisor

Observations, non conformances including responsible person and target dates.

  • Observations, non conformances including responsible person and target dates.

  • Observations, non conformances including responsible person and target dates.

  • Observations, non conformances including responsible person and target dates.

  • Observations, non conformances including responsible person and target dates.

  • Observations, non conformances including responsible person and target dates.

  • Observations, non conformances including responsible person and target dates.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.