Information
-
The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.
-
Asset SV / AV
-
Client / Site
-
Location
-
Date / Time
-
Prepared by
The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.
-
Take Photo of location of Asset and surrounds
-
Explain access issues
-
GPS location of asset
-
Take photo of the asset
-
What are the findings ?
-
Is there any corrosion ?
-
Is there any Foreign build up ?
-
Missing bolts etc
-
Is there rubbish impending asset ?
-
Dislocated Pipe work ?
-
Are there any leaks ?
-
Is the asset labelled ? , if yes please take picture
-
Person carry out inspection