Introduction

  • Blyth Offshore Demonstrator

  • Conducted on

  • Conducted by

  • Turbine

Inspection Record

01. PCM 1 Level. - Description of inspection area/component

  • Cable work

  • Check grounding on PCM 1 level and between platform and tower.

  • Transformer condition

  • Floor condition

  • Lighting condition

  • Wall paint condition

  • Other issues PCM 1 level.

02. PCM 2 Level. - Description of inspection area/component

  • Check cabinets, LSI for leaks corrosion on busbars etc.

  • Check cable work.

  • Check cooling water pump and hose/pipe connections for leaks

  • Check grounding on PCM level 2 and between platform and tower.

  • Floor condition

  • Lighting condition

  • Wall paint condition

  • Firefighting system or fire extinguishers condition

  • Other issues PCM 2 level.

03. PCM 3 Level. - Description of inspection area/component

  • Check cabinets, if possible inside as well

  • Check cable work.

  • Check cooling pipes water and air. if present.

  • Check grounding on PCM level 3 and between platform and tower.

  • Floor condition

  • Lighting condition

  • Aux transformer condition

  • Wall paint condition

  • Other issues PCM 3 level.

04. PCM 4 Level. - Description of inspection area/component

  • Visually, check sealing survival kit.

  • PCM crane condition

  • Visually, check conditioning unit.

  • Check grounding on PCM level 4.

  • Floor condition

  • Lighting condition

  • Wall paint condition

  • Other issues PCM 4 level.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.