Title Page
-
Conducted on
-
Engineer name and Site ID
-
Location
-
Scope of Works
- 5g DSS
- NTQ
- TEF Tech Add
- London Unwind
- Metropolis 5G
- SW NSN Swap
- SW 5G
- Other
-
Cabinet Type
- Lancaster
- Vulcan
- RBS6102
- RBS6201
- RBS6202
- Hybrid
- CSC
- Other
Self Audit
-
Pre Start Photos taken?
-
Patrol faults required?
-
Any legacy issues?
-
Pre Testing Complete?
-
Pre Antenna Audit Complete?
-
Pre Alarm Check Completed By BO?
-
Please Detail Pre Alarms
-
Why Was A Pre Alarm Check Not Completed?
-
Was QARA Completed?
-
Correct Breaker Rating As Per DD? Ring ETDM - Tony Appleby 07966021687 To Confirm
-
Correct Number Of Rectifiers As Per DD? Ring ETDM - Tony Appleby 07966021687 To Confirm
-
Antennas Installed As Per DD's?
-
Cabinet Installation As Per SID?
-
Is The Site Installed As Per The DD's?
-
Give a description of redlines required and provide photos
-
-
Site Signage Installed As Per DD's?
-
Is the GPS In The Protection Cone Of The Lightning Finial?
-
What is the reason for this? eg :- Legacy steel without lightning finials
-
Ducting/Entry Ports Sealed?
-
Is the site built to the current VF / Ericsson Specification?
-
Are All Works Completed?
-
What works are still outstanding?
-
-
Has all the correct HOP info been collected? i.e Alignments / RETS / Testing / Photos
-
What is required to complete the HOP
-
Site Clearance Required?