Title Page

  • Conducted on

  • Engineer name and Site ID

  • Location
  • Scope of Works

  • Cabinet Type

Self Audit

  • Pre Start Photos taken?

  • Patrol faults required?

  • Any legacy issues?

  • Pre Testing Complete?

  • Pre Antenna Audit Complete?

  • Pre Alarm Check Completed By BO?

  • Please Detail Pre Alarms

  • Why Was A Pre Alarm Check Not Completed?

  • Was QARA Completed?

  • Correct Breaker Rating As Per DD? Ring ETDM - Tony Appleby 07966021687 To Confirm

  • Correct Number Of Rectifiers As Per DD? Ring ETDM - Tony Appleby 07966021687 To Confirm

  • Antennas Installed As Per DD's?

  • Cabinet Installation As Per SID?

  • Is The Site Installed As Per The DD's?

  • Give a description of redlines required and provide photos

  • Site Signage Installed As Per DD's?

  • Is the GPS In The Protection Cone Of The Lightning Finial?

  • What is the reason for this? eg :- Legacy steel without lightning finials

  • Ducting/Entry Ports Sealed?

  • Is The Site Built To The Current VF / Ericsson Specification?

  • Are All Works Completed?

  • What works are still outstanding?

  • Has All The Correct HOP Info Been Collected? i.e Alignments / RETS / Testing / Photos

  • What is required to complete the HOP

  • Site Clearance Required?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.