Information

  • Work Packet ID

  • Address

  • Conducted on

  • Prepared by

  • Company

  • Technician

  • Field Manager

Fault Type & Evidence

What CSA is the Fault Found in

  • Faulty Network Category

  • Please select Surface Type

  • Panel dimensions of area reinstated e.g. 2.0m x 3.5m = 7msq

  • Evidence Cam images before reinstatement

  • Evidence Cam Images of Permanent Reinstatement

  • Notes:

  • Area of reinstatement p/msq e.g. 2.0m x 3.5m = 7msq

  • Evidence Cam images before reinstatement

  • Evidence Cam Images of Permanent Reinstatement

  • Notes:

  • Terminal ID / Service enclosure ID where Faulty Network claim has originated from

  • Has the Field Manger given permission to excavate

  • Why have you not obtained FM approval?

  • Has all trouble shooting been completed as per ND0563 v2.4 before excavating?

  • Why hasn't trouble shooting been completed before excavating?

What plans did you have on site before excavating?

  • Please Select where Fault is located on the Network

  • Please select Network Fault?

  • Detailed description of the blockage cause

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Where is fault located on Network?

  • Detailed description of the blockage cause

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Detailed description of the blockage cause

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Detailed description of the issue

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

What plans did you have on site before excavating?

  • Please Select where Fault is located on the Network

  • Detailed description of the blockage cause

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

What plans did you have on site before excavating?

  • Detailed description of the need for duct access

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Detailed description of the blockage cause

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Dig and fix at straight joint

  • Detailed description of the blockage cause

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Dig and fix at clamshell

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Detailed description of the blockage cause

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Please Select what plant was damaged / Repaired

  • Damaged IFDB

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

What plans did you have on site before excavating?

  • Damaged ABFAT

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Damaged FAT

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Damaged Aerial FAT

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Re-position lateral / drop off / Install duct tee or install new lateral / Network Extension

  • Detailed description of why works are required

  • Evidence Cam Image of location before excavation to give perspective of location of works

  • Evidence Cam Image of excavation

  • Evidence Cam Image of network extension (Works undertaken)

What plans did you have on site before excavating?

  • Creating new Ribbonet Drop off

  • Detailed description of why works are required

  • Evidence Cam Image of location before excavation to give perspective of location of works

  • Evidence Cam Image of excavation

  • Evidence Cam Image of network extension (Works undertaken)

  • Installation of New Lateral

  • Detailed description of why works are required

  • Evidence Cam Image of location before excavation to give perspective of location of works

  • Evidence Cam Image of excavation

  • Evidence Cam Image of network extension (Works undertaken)

  • UFB Network fibre - locate, repair feeder fibre issues

  • Fibre fault found between OFDC and

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

What plans did you have on site before excavating?

  • Fibre fault found between FAT and

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Fibre fault found between FFP and

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Fibre fault found between Cabinet and

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • Fibre fault found between Exchange and

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

  • 4.2.6 - UFB Splitter - replace splitter

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

What plans did you have on site before excavating?

  • 4.2.7 - PON Issue - inside plant to investigate, repair, reset and correct PON connection

  • Evidence Cam Image of location before excavation to give perspective of where fault was,

  • Evidence Cam Image of network fault (What have you found)

  • Evidence Cam Image of network repair (What did you repair)

What plans did you have on site before excavating?

  • Did you have network plans on site before excavating?

  • Please upload Netmap and UFB Asbuilds used

  • Why have you worked without network plans?

  • Faulty Network Type

  • Evidence Cam Image of Permanent reinstatement

  • Evidence Cam Image of reinstatement showing site left in a temporary safe state

  • Faulty Network Code

Fault Claim

  • Number of Technicians on site

  • List the Field Activity Applicable codes (Refer to FNT coded activity list), Once selected add the required quantity into the free text box under each code.

  • FN -577 Quantity

  • FN-707 Quantity

  • FN-760 Quantity

  • FN760A Quantity

  • FN-761 Quantity

  • FN-A16 Quantity

  • FN-A16A Quantity

  • FN-A16AS Quantity

  • FN-A16B Quantity

  • FN-A16BS Quantity

  • FN-A16C Quantity

  • FN-A16CS Quantity

  • FN-A16D Quantity

  • FN-A16DS Quantity

  • FN-A16E Quantity

  • FN-A16ES Quantity

  • FN-A16S Quantity

  • FN-A17 Quantity

  • FN-A17C Quantity

  • FN-A17S Quantity

  • FN-B22 Quantity

  • FN-B22a Quantity

  • FN-C13.1 Quantity

  • FN-C13.2 Quantity

  • FN-C13.3 Quantity

  • FN-C13.4 Quantity

  • FN-C13.5 Quantity

  • FN-C13.6 Quantity

  • FN-C14.1 Quantity

  • FN-C14.2 Quantity

  • FN-C14.3 Quantity

  • FN-C14.4 Quantity

  • FN-C14.5 Quantity

  • FN-C14.6 Quantity

  • FN-C14.7 Quantity

  • FN-DO1a Quantity

  • FN-G01 Quantity

  • FN-G02 Quantity

  • FN-G02a Quantity

  • FN-G03 Quantity

  • FN-G03a Quantity

  • FN-G04 Quantity

  • FN-G05 Quantity

  • FN-G05a Quantity

  • FN-G06 Quantity

  • FN-G06a Quantity

  • FN-G08 Quantity

  • FN-I03.1 Quantity

  • FN-I03.2 Quantity

  • FN-I03.3 Quantity

  • FN-I03.4 Quantity

  • FN-I03.5 Quantity

  • FN-I03.6 Quantity

  • FN-MBREAK1 Quantity

  • FN-MBREAK2 Quantity

  • FN-MDUCT1 Quantity

  • FN-MDUCT2 Quantity

  • FN-MDUCT3 Quantity

  • FN-R01a Quantity

  • FN-R01b Quantity

  • FN-R01c Quantity

  • FN-R01d Quantity

  • FN-R01e Quantity

  • N-MEWP2 Quantity

  • FN-E01B Quantity

  • FN-E01A Quantity

  • FN-N01 Quantity

  • FN-N02 Quantity

  • List the Material applicable codes (refer to FNT coded activity list).

  • MDUCT1 Quantity

  • MDUCT2 Quantity

  • MDUCT3 Quantity

  • MDUCT4 Quantity

  • MDUCT5 Quantity

  • MDUCT6 Quantity

  • MDUCT7 Quantity

  • MDUCT8 Quantity

  • MDUCT9 Quantity

  • MB01B.1 Quantity

  • Breakdown of materials used (Not included at Coded Material List)

  • Total cost of materials used (Not Included at Coded Material List)

  • Sub Contractor/Equipment Hire invoice if applicable

  • Please provide cost (mark-up incl.)

  • Please upload copy of Invoice

  • List the admin activity as applicable (refer to FNT coded activity list >30min claims require additional approval for why)

  • Additional adhoc pre-approval high costs claim. (Please detail what this claim is and attach a copy of pre-approval from your FM)

  • FM Approval

  • FM Approval

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.